• Title/Summary/Keyword: Optimal alternative

Search Result 903, Processing Time 0.029 seconds

The Decision Making Strategy for Determining the Optimal Production Time : A Stochastic Process and NPV Approach (최적생산시기 결정을 위한 의사결정전략 : 추계적 과정과 순현재가치 접근)

  • Choi, Jong-Du
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.32 no.1
    • /
    • pp.147-160
    • /
    • 2007
  • In this paper, the optimal decision making strategy for resource management is viewed in terms of a combined strategy of planting and producing time. A model which can be used to determine the optimal management strategy is developed, and focuses on how to design the operation of a Markov chain so as to optimize its performance. This study estimated a dynamic stochastic model to compare alternative production style and used the net present value of returns to evaluate the scenarios. The managers in this study may be able to increase economic returns by delaying produce in order to market larder, more valuable commodities.

경쟁력제고를 위한 한국 자동차산업의 최적 유통구조에 대한 소고

  • 전달영
    • Journal of Distribution Research
    • /
    • v.2 no.1
    • /
    • pp.59-85
    • /
    • 1997
  • The automobile industry in Korea has grown to the fifth in the world in terms of production capacity. In spite of the production growth, the marketing aspects such as distribution and customer service in the auto industry are still behind the world-class. Thus, the major purposes of this paper are as follows. The first is to analyze competitive structure of the industry and to compare distribution strategies of the major auto firms(Hyundai, Daewoo, and Kia). The second is to theoretically explain the transition from the vertical marketing system to the dealer system using transaction cost analysis. The third is to compare auto distribution channels in Korea with those in the U.S. and Japan. Finally, an optimal channel stucture in the auto industry is suggested after reviewing five alternative channel structures such as corporate-owned VMS, sales-specializing firm, multiplex system(VMS+limited dealer system), dual sales channel, and advanced dealer system. In the short-run, sales-specilizing firm was suggested as an optimal channel system to enhance customer satisfaction by integrating sales and customer service. In the long-run, advanced dealer system through regional differentiation was desirable for an optimal channel structure by organically integrating new car sales, used car sales, and after service to provide total marketing service to customers.

Disassembly Process Planning of End-of-Life Car

  • Park, Hong-Seok;Choi, Hung-Won
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.6 no.1
    • /
    • pp.42-50
    • /
    • 2005
  • In order to increase competitiveness and to gain economic benefit, companies ask more and more how to recycle their products in an efficient way. So far, to answer this question, companies are not sufficiently supported by suitable methods specially in the area of disassembly process planning. For this reason, we develop in collaboration with an industrial partner a new method for generating an optimal disassembly sequence. In this paper this method will be described in detail by considering the exiting assembly information, disassembly method and disassembly depth. PLM(Profit-Loss Margin) curve that is used to determine disassembly depth consists of profit value, disassembly cost and disassembly effect. Using assessment parameters, generated alternative disassembly sequences are evaluated and an optimal disassembly sequence is proposed. This method is applied to generate the optimal disassembly sequence of Door Trim as an example.

WWW-based Vehicle Routing Problem using Mixed Genetic Algorithm (혼합형 유전자 알고리즘을 이용한 웹 기반의 차량 경로 문제)

  • 김기섭;양병학
    • Journal of the military operations research society of Korea
    • /
    • v.24 no.2
    • /
    • pp.117-129
    • /
    • 1998
  • This study is concerned with developing a heuristic for a web-based vehicle routing problem using mixed genetic algorithm(VRPMGA) which determines each vehicle route in order to minimize the transportation costs, subject to meeting the demands of all delivery points. VRP is known to be NP-hard, and it needs a lot of computing time to get the optimal solution, so that heuristics are more frequently developed than optimal algorithms. This study aims to develop a mixed genetic algorithm by partitioned strategy which can give a good solution in comparatively brief time. The good features of the VRPMGA are, fristly, the ability of early convergence and, secondly, the capability of producing multiple, alternative, and near-optimal solutions. The VRPMGA is a useful algorithm that can be appliable to VRP and TSP. Finally, the computational test were performed using the benchmark problems and the proposed heuristic is compared with the other existing algorithms (COSA). The result of computational tests shows that proposed heuristic gives good solutions, in much shorter time, which are same as the best known solutions in the pervious research.

  • PDF

A Knowledge-based System for Assembly Process Planning (조립 공정계획을 위한 지식기반 시스템)

  • Park, Hong-Seok;Son, Seok-Bae
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.16 no.5 s.98
    • /
    • pp.29-39
    • /
    • 1999
  • Many industrial products can be assembled in various sequences of assembly operations. To save time and cost in assembly process and to increase the quality of products, it is very important to choose an optimal assembly sequence. In this paper, we propose a methodology that generates an optimal assembly sequence by using the knowledge of experts. First, a product is divided into several sub-assemblies. Next, the disassembly sequences of sub-assembly are generated using disassembly rules and special information can be extracted through the disassembly process. By combining every assembly sequence of sub-assemblies, we can generate all the possible assembly sequences of a product. Finally, the expert system evaluates all the possible assembly sequences and finds an optimal assembly sequence. It can be achieved under consideration of the parameters such as assembly operation, tool change, safety of part. basepart location, setup change, distance, and orientation. The developed system is applied to UBR(Unit Bath Room) example.

  • PDF

A Study on Operation Planning of Childcare Centers to Improve the Quality of Childcare Service (보육서비스 품질 개선을 위한 어린이집 운영계획 수립에 관한 연구)

  • Song, Seung-Min;Kim, Taeho
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.3
    • /
    • pp.371-380
    • /
    • 2013
  • Purpose: This study analyzes the optimal operation scheme of childcare centers in Korea to maximize the quality of childcare service by determining the number of children and number of teachers. Methods: This study employs a mathematical programming methodology called 'nonlinear integer programming (NLIP)' to solve the optimization problems and compare the quality of childcare service of optimal solutions with those of present operation scheme. Results: It is very successful in obtaining the optimal solutions for alternative capacities and they guarantee the substantial improvement in the quality of childcare service. Conclusion: Though more variables should be adapted for defining the quality of childcare service robustly, it is possible to conclude that childcare centers should modify their operation scheme to improve the quality of childcare service.

Efficient Elitist Genetic Algorithm for Resource-Constrained Project Scheduling

  • Kim, Jin-Lee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.235-245
    • /
    • 2007
  • This research study presents the development and application of an Elitist Genetic Algorithm (Elitist GA) for solving the resource-constrained project scheduling problem, which is one of the most challenging problems in construction engineering. Main features of the developed algorithm are that the elitist roulette selection operator is developed to preserve the best individual solution for the next generation so as to obtain the improved solution, and that parallel schedule generation scheme is used to generate a feasible solution to the problem. The experimental results on standard problem sets indicate that the proposed algorithm not only produces reasonably good solutions to the problems over the heuristic method and other GA, but also can find the optimal and/or near optimal solutions for the large-sized problems with multiple resources within a reasonable amount of time that will be applicable to the construction industry. This paper will help researchers and/or practitioners in the construction project scheduling software area with alternative means to find the optimal schedules by utilizing the advantages of the Elitist GA.

Development of a Cost-benefit Model for the Management of Structural Risk on Oil Facilities in Mexico

  • Leon, David-De;Alfredo H-S. Ang
    • Computational Structural Engineering : An International Journal
    • /
    • v.2 no.1
    • /
    • pp.19-23
    • /
    • 2002
  • A reliability-based cost-benefit model for the risk management of oil platforms in the formulation of optimal decisions based on life-cycle consideration is proposed. The model is based on structural risk assessments and the integration of social issues and economics into the management decision process. Structural risks result from the platform's exposure to the random environmental loading associated with the offshore site where it is located. Several alternative designs of a typical platform are proposed and assessed from the cost-effectiveness viewpoint. This assessment is performed through the generation of cost/benefit relationships that are used, later on, to select the optimal design.

  • PDF

On the Optimal Decision Making in the Compensatory Models (보정모형에서의 최적 의사결정에 관한 연구)

  • Chung, Soon-Suk
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.4
    • /
    • pp.205-218
    • /
    • 2006
  • Multi-criteria decision making is deducing the relative importance in the criterion of decision making and each alternative which is able to making a variety of choices measures the preferred degree in the series of town ranking criterions. Moreover, this is possible by synthesizing them systematically. In general, a fundamental problem decision maker solve for multi-criteria decision making is evaluating a set of activities which an considered as the target logically, and this kind of work is evaluated and synthesized by various criterions of the value which a chain of activities usually hold in common. In this paper, we use the compensatory models for the optimal decision making. For the purpose of optimal decision making, the data of five different car models are used in Europe.

Distributed Implementation of Optimal Power Flow (OPF) Based on Auxlliary Problem Principle (Auxiliary Problem Principle 알고리즘에 기초한 최적 조류 계산의 분산 처리 기법에 관한 연구)

  • Hur, Don;Kim, Jin-Ho;Park, Jong-Keun;Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1000-1002
    • /
    • 1998
  • We present an approach to parallelizing optimal power flow (OPF) that is suitable for distributed implementation and is applicable to very large interconnected power systems. The objective of this paper is to find a set of control parameters with which the Auxiliary Problem Principle (Algorithm - APP) can be best implemented in solving optimal power flow (OPF) Problems. We employed several IEEE Reliability Test Systems to demonstrate the alternative parameter sets.

  • PDF