Disassembly Process Planning of End-of-Life Car

  • Park, Hong-Seok (School of Mechanical and Automotive Engineering, University of Ulsan) ;
  • Choi, Hung-Won (Graduated School of Mechanical and Automotive Engineering, University of Ulsan)
  • 발행 : 2005.01.01

초록

In order to increase competitiveness and to gain economic benefit, companies ask more and more how to recycle their products in an efficient way. So far, to answer this question, companies are not sufficiently supported by suitable methods specially in the area of disassembly process planning. For this reason, we develop in collaboration with an industrial partner a new method for generating an optimal disassembly sequence. In this paper this method will be described in detail by considering the exiting assembly information, disassembly method and disassembly depth. PLM(Profit-Loss Margin) curve that is used to determine disassembly depth consists of profit value, disassembly cost and disassembly effect. Using assessment parameters, generated alternative disassembly sequences are evaluated and an optimal disassembly sequence is proposed. This method is applied to generate the optimal disassembly sequence of Door Trim as an example.

키워드

참고문헌

  1. Park, H. S., 'Environment agreeableness in design process,' Jr. of the KSPE, Vol. 17, No. 8, pp. 15-18, 2000
  2. Franke, H. J., Firchau, N. L. and Schoppe, K. D., 'Ablaufplan fur Massnahmen zur Erhohung der Recyclingquote auf Grundlage eines systematischen Monitorings,' Recyclingorientierte Entwicklung technischer Produkte 2000, VDI Berichte 1570, pp. 253-268, 2000
  3. Boop, R. and Bullinger, H. J., 'Methoden und Hilfsmittel zur recyclinggerechten Produkt - entwicklung,' VDI berichte 1171, ISBN:3-18-091171-9, pp. 145-185, 1996
  4. Feldmann, K., 'Effizienzsteigerung bei Demontage und Recycling durch flexible Demontagetechnologien und optimierte Produckgestaltung,' Meisenbach Verlag Bamberg, 2000
  5. Tritsch, C., 'Flexible Demontage technischer Gebrauchsgüter,' Institut fur Werkzeugmaschinen und Betriebstechnik, 1996
  6. Kroll, E. and Carver, B. S., 'Disassembly analysis through time estimation and other metrics,' Robotics and Computer-integrated Manufacturing, pp. 191-200, 1999
  7. Das, S. K. and Naik, S., 'Process planning for product disassembly,' Int. Jr. Prod. Res., Vol. 40, No. 6, pp. 1335-1355, 2002 https://doi.org/10.1080/00207540110102142
  8. Ishii, K. and Lee, B., 'Reverse fishbone diagram: A tool in aid of design for product retirement,' 1996 ASME Design Technical Conference, 1996
  9. Moor, K. E., 'Disassembly petri net generation in the presence of XOR precedence relations,' IEEE, 1998
  10. Yi, H. C., Joo, H. H. and Kyung, K. H., 'A study on disassembly path generation using petri net,' Jr. of the KSPE, Vol. 17, No. 2, pp. 176-184, 2000
  11. Johnson, M. R. and Wang, M. H., 'Planning product disassembly for material recovery opportunity,' Int. Jr. of Production Research, Vol. 33, No. 11, pp. 3119-3142, 1995 https://doi.org/10.1080/00207549508904864
  12. Mok, H. S., Moon, K. S., Kim, S. H. and Moon, D. S., 'The complexity evaluation system of automobile subassembly for recycling,' Jr. of the KSPE, Vol. 16, No. 5, pp. 132-144, 1999
  13. Park, H. S. and Son, S. B., 'A knowledge-based system for assembly process planning,' Jr. of the KSPE, Vol. 16, No. 5, pp. 29-39, 1999
  14. Park, H. S., 'A knowledge-based system for assembly sequence planning,' Int. Jr. of the KSPE, Vol. 1, No. 5, pp. 35-42, 2000