• Title/Summary/Keyword: Operational Performance Indicator

Search Result 33, Processing Time 0.022 seconds

Fluctuation in operational energy efficiency of ships and its implications for performance appraisal

  • Zhang, Shuang;Yuan, Haichao;Sun, Deping
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.13 no.1
    • /
    • pp.367-378
    • /
    • 2021
  • This paper develops a dynamic regression model to quantify the contribution of key external factors to operational energy efficiency of ships. On this basis, kernel density estimation is applied to explore distribution patterns of fluctuations in operational performance. An empirical analysis based on these methods show that distribution of fluctuations in Energy Efficiency Operational Indicator (EEOI) is leptokurtic and fat tailed, rather than a normal one. Around 85% of fluctuations in EEOI can be jointly explained by capacity utilization and sailing speed, while the rest depend on other external factors largely beyond control. The variations in capacity utilization and sailing speed cannot be fully passed on to the energy efficiency performance of ships, due to complex interactions between various external factors. The application of the methods is demonstrated, showing a potential approach to develop a rating mechanism for use in the legally binding framework on operational energy efficiency of ships.

Indicator of Facility Performance Evaluation (FPE) for Educational Facilities of BTL Projects

  • Lee, Kwan-Jong;Lee, Chun-Kyong;Park, Tae-Keun
    • Architectural research
    • /
    • v.14 no.1
    • /
    • pp.35-44
    • /
    • 2012
  • Build-Transfer-Lease (BTL) was introduced to the domestic construction market in 2005. Now, seven years later, the BTL model is most active for educational facilities. In 2011, 93 educational facility projects entered the maintenance stage. Considering the characteristics of today's BTL projects for educational facilities, the main issues are the initial performance and maintenance of educational facilities and the service-providing status for the 20-year operational management period, in relation to providing safety and convenience to students, the facility users. Seeking a solution, local education offices and departments in charge of BTL under the Ministry of Education, Science, and Technology have been exploring various methods of evaluating operational maintenance performance from various perspectives. For educational facility BTL projects, however, the appropriateness of initial operation performance evaluation, rather than considering the 20-year operational management period, is controversial in regards to sustainability. On this account, performance evaluation items in four areas-operational maintenance evaluation, facility performance status evaluation, maintenance subject evaluation, and sustainable change response evaluation-should be extracted. An indicator of facility performance evaluation is presented in this study through an AHP survey targeting experts, as part of establishing an operation performance evaluation system for educational facility BTL projects.

Development of a Leading Performance Indicator from Operational Experience and Resilience in a Nuclear Power Plant

  • Nelson, Pamela F.;Martin-Del-Campo, Cecilia;Hallbert, Bruce;Mosleh, Ali
    • Nuclear Engineering and Technology
    • /
    • v.48 no.1
    • /
    • pp.114-128
    • /
    • 2016
  • The development of operational performance indicators is of utmost importance for nuclear power plants, since they measure, track, and trend plant operation. Leading indicators are ideal for reducing the likelihood of consequential events. This paper describes the operational data analysis of the information contained in the Corrective Action Program. The methodology considers human error and organizational factors because of their large contribution to consequential events. The results include a tool developed from the data to be used for the identification, prediction, and reduction of the likelihood of significant consequential events. This tool is based on the resilience curve that was built from the plant's operational data. The stress is described by the number of unresolved condition reports. The strain is represented by the number of preventive maintenance tasks and other periodic work activities (i.e., baseline activities), as well as, closing open corrective actions assigned to different departments to resolve the condition reports (i.e., corrective action workload). Beyond the identified resilience threshold, the stress exceeds the station's ability to operate successfully and there is an increased likelihood that a consequential event will occur. A performance indicator is proposed to reduce the likelihood of consequential events at nuclear power plants.

Bio-signal Based Rehabilitation Program and Data Management (국내 연하장애 기능적 전기 자극치료기 사용 현황과 장비관리 실태 분석)

  • Heo, S.Y.;Park, J.H.;Rhee, K.M.
    • Journal of rehabilitation welfare engineering & assistive technology
    • /
    • v.8 no.1
    • /
    • pp.57-66
    • /
    • 2014
  • This study has been conducted to identify the current status and practices of electrical stimulation for patients with dysphagia in Korea. Main goal of the study is to find evidences of developing and distributing a quality indicator and organized performance exam. This study analyzed 50 survey questionnaires given to clinical professionals in upper-scale general hospitals, university hospitals, nursing homes and professional rehabilitation hospitals. The survey sent out and collected by E-mails or interviews from August 21, 2013 to November 10, 2013. Most of the hospitals showed lack of using a quality indicator and organized performance exams in device maintenance, pre-operational tests and post-operational tests. It is strongly recommended to develop a standardized guideline of a higher quality indicator and organized performance exam in using neuromuscular electrical stimulator for patients who are suffering from dysphagia.

  • PDF

Derivation of Priorities for Required Functions and Operational Performance Indicators of Smart Factories Based on QFD (QFD에 기반한 스마트공장의 요구기능과 운영성과지표 우선순위 도출)

  • Young-Jun Jeon;Kwan-Hee Han
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.2
    • /
    • pp.32-46
    • /
    • 2023
  • Recently, small and medium-sized manufacturing companies have shown increased interest in and participation in smart factories in order to survive in market competition. However, many SMEs build smart factories without a systematic review or preparation, which leads to them not being able to use them properly. This study considers the main reason for the low utilization rate of smart factories to be a lack of sufficient reflection of user requirements. Therefore, a method and procedure for deriving the priority of smart factory requirement functions and operating performance indicators based on QFD is proposed as a solution to this issue.

A study on the key performance indicator of the dynamic positioning system

  • Park, Kwang-Phil;Jo, A-Ra;Choi, Jin-Woo
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.8 no.5
    • /
    • pp.511-518
    • /
    • 2016
  • The dynamic positioning system (DPS) maintains an offshore vessel's position and heading under various environmental conditions by using its own thrust. DPS is regarded as one of the most important systems in offshore vessels. So, efficient operation and maintenance of the DPS are important issues. To monitor the DPS, it is necessary to define an appropriate key performance indicator (KPI) that can express the condition of the DPS from the perspective of operational efficiency and maintenance. In this study, a new KPI for the DPS is proposed considering the efficiency of the machinery and controller, the energy efficiency, and the environmental conditions in which the DPS is operated. The KPI is defined as a function of control deviation, energy consumption, and environmental load. A normalization factor is used to normalize the effect of environmental load on the KPI. The KPI value is calculated from DPS simulation and model test data. The possibility of applying the KPI to monitoring of DPS condition is discussed by comparing the values. The result indicates the feasibility of the new KPI.

Financial Decline of Pakistan Railways and Prospective Turnaround

  • Ch., Kashif Farooq
    • International Journal of Railway
    • /
    • v.6 no.4
    • /
    • pp.131-138
    • /
    • 2013
  • We have studied the financial performance of Pakistan Railways and found that the financial indicator (net earnings ratio) of Pakistan Railways is consistently decreasing over the years, causing severe financial and operational crises. The implication of our study indicates that the '3Rs' Strategy (retrenchment, repositioning and reorganizing) should be put into practice and furthermore, favorable changes in environmental factors can also contribute towards organizational turnaround. This study would help the Government of Pakistan to think and plan more clearly about turnaround strategies that could improve the performance and growth of Pakistan Railways.

A Study on the Wireless Control System for the Shunting Route Indicator Applied with LTE-R technology (LTE-R 기술을 적용한 입환진로표시기 무선제어시스템 연구)

  • Suh, Ki-Bum;Im, Chul-Hoo;Lee, Kwang-Hee;Oa, Seong-Wook;Joeng, Wang-Kuk
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.1
    • /
    • pp.229-236
    • /
    • 2017
  • The railway has recently been expanded with the phase of the future transportation. Accordingly, using the new technologies such as smart devices and LTE-R, the needs for reducing operational costs and improving passenger services have emerged. To realize these needs, the government is pushing to build the dedicated wireless network for the railway systems. In this paper, the shunting route indicator was selected for this study because it has the best effect for the wireless system removed lots of wired cables. And the wireless shunting route indicator applied with LTE-R technology was developed to replace the current wired control system. The functional goal(the wireless control function applied LTE-R), the performance goal(less than 300ms for transferring the control information), and the reliability goal(over the 100,000 hours for MTBF) were set, and these goals were achieved and demonstrated through the test and validation.

A Study on Establishing Performance Measurement and Evaluation System of ATM (ATM 성능측정 및 평가체계 구축 연구)

  • Seo, Youngsung;Park, Bomi;Kim, Jun-hyuk
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.26 no.1
    • /
    • pp.37-43
    • /
    • 2018
  • There has been the migration to a performance-based approach in many areas which include transition planning at global, regional and local levels, performance-based navigation and safety management. Achieving continuous success of Air Traffic Management (ATM) systems would require a performance-based approach to raise productivity and efficiency of it through performance measurements and reviews. This paper considers establishment planning of performance measurement and evaluation system for ATM. Related to key performance areas proposed by International Civil Aviation Organization, performance indicators and metrics which could be used to measure and evaluate ATM performance are presented. Also, organizational system and operational planning for efficient operation of ATM are presented.

A Study on the Economic Life Cycle Decision Method of Aircraft Direct Support Equipment (항공기 지원 장비 경제수명 결정에 관한 연구)

  • Kim, Si Yeon;Choi, Bong-Wan;Oh, Hyun-Seung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.4
    • /
    • pp.193-201
    • /
    • 2014
  • This study attempts to utilize the economic efficiency analysis results focused on the break-even point as an indicator for the decision making of commanders and staff. We suggested a method of determining economic life by utilizing logistics information system and commercial program Minitab with a focus on the equipment's operational environment and performance data, whereas previously the equipment's retirement period was simply determined by the current equipment prices and sustainable period.