Unit costs for energy production in bioenergy facilities are dependent upon both fixed cost for facility construction and operational costs including biomass feedstock supply. With the increase of capacity, unit fixed cost could be decreased while supply cost tends to increase due to the longer transportation distance. It is desirable to take into account biomass availability in planning bioenergy facilities. A cumulative curve relationship was proposed to relate biomass availability and cumulative products of biomass amount and transportation distance. Optimum size of gasification facilities was affected by collection cost, biomass cumulative relationship. Based on biomass availability of Icheon-City, optimum sizes were about $400kW_{th}$ for gas production, and about $200kW_{el}$ for power generation. Unit cost of bioenergy production could be substantially reduced by reducing collection cost through supplying biomass from diverse sources including land development areas where significant amount of waste wood is generated. When planning bioenergy facilities, however, biomass availability and spatial distribution are key factors in determining the size of capacity.
Research projects of SNCF aim at reducing the costs of infrastructure possessions and improving the operational equipment availability and safety. This permanent search for a better regularity led the SNCF to analyse the maintenance approach of signalling equipment in detail. Until now, it was commonly acknowledged that signalling equipment, which consists of many electronic devices, is not subject to aging. In this study, a Weibull lifetime model, able to describe an aging phenomenon, is used and it can be shown that the deterioration is statistically significant. The validity of the model is tested. We also analyse the influence of environmental covariates. We simulate different scenarios in order to investigate the impact of several maintenance strategies as well as on future maintenance costs, on the amount of components to replace based on the mean age of the network. It can be shown that in most cases a systematic replacement strategy offers the best solution.
Transmission planning is an important part of power system planning to meet an increasing demand for electricity. The objective of transmission expansion is to minimize operational and construction costs subject to system constraints. There is inherent uncertainty in transmission planning due to errors in forecasted demand and fuel costs. Therefore, transmission planning process is not reliable if the uncertainty is not taken into account. The paper presents a systematic method to find the optimal location and amount of transmission expansion using Cross-Entropy (CE) incorporating uncertainties about future power system conditions. Numerical results are presented to demonstrate the performance of the proposed method.
International Journal of Naval Architecture and Ocean Engineering
/
제12권1호
/
pp.129-145
/
2020
The article presents a systematic approach to design of marine navigation channels parameters resulting from manoeuvring and operational safety. Relations between the parameters of waterway system elements and the conditions of safe ship operation have been determined and the objective function of waterway parameters' optimization problems has been minimized with respect to variables of construction and operation costs. These costs have been functionally associated to variables of channel width at the bottom and fairway depth. The method of fairway's width computation at specified safe depth at the preliminary and detailed stages of waterway design has been proposed. The results of this method application have been illustrated with two examples: 1. The modernization of Szczecin-Swinoujscie fairway aimed at accepting vessels of 60,000 DWT capacity. 2. Construction of an approach channel leading to a newly built container terminal in Swinoujscie harbour (Poland), handling ocean-going container ships of 20,000 TEU capacity.
건설사업은 복합, 중장기적인 사업특성상 프로젝트의 기획부터 시공 완료 단계까지 정확한 공사비 예측 및 확인, 정산 절차가 매우 중요하며, 기획에서 실시설계, 물량산출의 전 단계에 이르기까지 공사비와 관계된 리스크요인의 검토와 판단이 강조되고 있다. 그러나 공공주택의 입낙찰 금액의 심사 및 실행예산 편성 시 실적데이터에 의한 공사비 초과요인에 대한 검토와 조치, 공사비 리스크의 적절한 대응이 이루어지지 않고 있는 실정이다. 이에 본 연구에서는 2004년~2010년 준공분 공공주택 40개 현장의 준공정산서를 대상으로 세부공종별 실적공사비 항목을 사업초기 실행예산을 기준으로 비교하여, 실적공사비의 변동관계에서 나타나는 편차 및 변동 폭을 분석함으로써 불규칙적 공사비 리스크요인을 파악하고 정량적 분석을 실시하였다. 연구결과 연도별, 연면적별, 지역별, 공사금액별, 분양/임대방식별 다양한 공사비 리스크 요인 및 결과를 도출하였다. 연도별 정책과 경기 변동에 따른 공사비 리스크를 알 수 있었으며, 지역별, 연면적별 공사특성에 따른 공사비 리스크 항목을 도출하였다. 공사금액별 리스크 분석에서는 최저가낙찰제의 문제점을 알 수 있었으며, 공사비 초과 리스크 비중은 외주비와 자재비 항목에서 가장 크게 발생하는 것으로 나타났다. 직접공사비 중 외주비 리스크는 지붕공사와 타일공사가 높게 나타났고, 자재비 리스크는 철근, 시멘트가 높게 나타났다. 본 연구결과는 향후 공공주택 실행예산 편성 시 분류 방식에 따라서 공사비 리스크 검토 공종 및 관리요소 분석을 위한 자료로 활용할 수 있을 것으로 판단된다.
Clearcutting has been the dominant harvesting method in British Columbia (representing 95% of the total area harvested annually). However forest managers are increasingly recommending the use of alternative silvicultural systems and harvest methods, including various types of partial cutting, to meet ecological and social objectives. In this study we compared harvesting productivity and harvesting costs between treatments through detailed and shift level time studies in 300-350 year-old Interior Cedar-Hemlock stands in British Columbia, Canada. Recommendations for improving operational planning/layout and the implementation of clearcut and partial cutting silvicultural systems were made. Harvesting costs varied in the ground-based clearcut treatments from $10.95/$m^3$ - $15.96/$m^3$ and $16.09/$m^3$ - $16.93/$m^3$ in the group selection treatments. The ground-based group retention treatment had a cost of $13.39/$m^3$, while the cable clearcut had a cost of $15.70/$m^3$. An understanding of the traditional and alternative wood products that could be derived from the harvested timber was imperative to increasing the amount of merchantable volume and reducing the corresponding harvesting costs. Stand damage was greatest in the group selection treatments; however, mechanized felling showed an increase in stand damage over manual felling while grapple skidding showed a decrease in skidding damage compared to line skidding.
한국농업기계학회 1996년도 International Conference on Agricultural Machinery Engineering Proceedings
/
pp.701-710
/
1996
Composting has gained rapid acceptance as a method of recyling relatively dry organic materials such as leaves and brush and , when alternative disposal costs are high, even moist materials such as grass clippings and dewatered sewage sludges. However, as moisture contents rise above 60% , the need for a dry bulking amendment increase the costs of composting , both by direct purchases of amendment and though increased reactor capacity and materials handling requirements. High moisture materials also present increased risks of anaerobic odor formation through reduced oxygen transport (Miller , 1991) . These costs and operational challengers often constrain the opportunities to compost high moisture materials such as agricultural manures. During the last several decades economies of scale in livestock production have been increasing livestock densities and creating manure management challenges throughout the world. This issue is particularly pressing in Korea, where livestock arms typically manage little or no cropland, and the nutrients and boichemical oxygen demand in manure pose a serious threat to water quality. Composting has recently become popular as a means of recycling manure into products for sale off the farm, but bulking amendments (usually sawdust) are expensive designed to minimize bulking agent requirements by using the energy liberated by decompostion. In this context the composting reactor is used as a biological dryer, allowing the repeated use of bulking amendment with several batches of manure.
Kim, So-Jung;Lee, Kook-Dong;Cho, Gun-Il;Ryoo, Dong-Keun
한국항해항만학회지
/
제33권7호
/
pp.483-490
/
2009
In recent years, shipping and ports industries are faced with enormous changes like globalization, market liberalization and borderless businesses. To cope with this competitive environment, a certain form of cooperation among ports is necessary to provide high quality of services and lower costs to establish their market power against shipping companies. The purpose of this study is to identify the motivation of the strategic alliances between ports and demonstrate the level of importance using Analytic Hierarchy Process(AHP). Among four motivations of the strategic alliances which are strategic motivation, economic motivation, operational motivation and marketing motivation, economic motivation is the most important factor for ports alliances than other factors. This is because economic motivation among strategic alliances allow ports in the same market to rationalize supply and demand, thus avoiding unnecessary over-supply and over-competition and also can reduce service costs by using comparative advantages of each partner which make costs cheaper.
This paper provides an overview of the role of membranes in bioelectrochemical systems (BESs). Bioelectrochemical systems harvest clean energy from waste organic sources by employing indigenous exoelectrogenic bacteria. This energy is extracted in the form of bioelectricity or valuable biofuels such as ethanol, methane, hydrogen, and hydrogen peroxide. Various types of membranes were applied in these systems, the most common membrane being the cation exchange membrane. In this paper, we discuss three major bioelectrochemical technology research areas namely microbial fuel cells (MFCs), microbial electrolysis cells (MECs) and microbial desalination cells (MDCs). The operation principles of these BESs, role of membranes in these systems and various factors that affect their performance and economics are discussed in detail. Among the three technologies, the MFCs may be functional with or without membranes as separators while the MECs and MDCs require membrane separators. The preliminary economic analysis shows that the capital and operational costs for BESs will significantly decrease in the future due mainly to differences in membrane costs. Currently, MECs appear to be cost-competitive and energy-yielding technology followed by MFCs. Future research endeavors should focus on maximizing the process benefits while simultaneously minimizing the membrane costs related to fouling, maintenance and replacement.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.