• 제목/요약/키워드: Operation schedule

검색결과 415건 처리시간 0.029초

A NESTING APPROACH IN DISCRETE EVENT SIMULATION FOR INTEGRATING CONSTRUCTION OPERATION AND SCHEDULE MODELS

  • Chang-Yong Yi;Chan-Sik Park;Doo-Jin Lee;Dong-Eun Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.400-408
    • /
    • 2009
  • Simulation applications for analyzing the productivity of construction operations at operation level and project schedules at project level are crucial methods in project management. The application at two different levels should be very tightly linked to each other in practice. However, appropriate integration at the levels is not achieved in that existing systems do not support to integrate operation models into a schedule model. This paper presents a new approach named to Discrete Event Simulation-Nesting modeling approach, which supports not only productivity analysis at operation level but also schedule management at a project level. The system developed by the authors allows creating operation models at the operation level, maintaining them in operation model library, executing sensitivity analysis to find the behaviors of the operation models when different combination of resources are used as existing DES systems do. On top of the conventional functions, the new system facilitates to find the optimum solution of resource combinations which satisfy the user's interest by computing the hourly productivity and the hourly cost of the operation. By drag-and-dropping an operation model kept in the operation model library, the operation models are integrated into an activity of the schedule model. When a complete schedule model is established by nesting operation models into the schedule model, stochastic simulation based scheduling is executed. A case study is presented to demonstrate the new simulation system and verify the validity of the system.

  • PDF

월동용 양봉사의 환기팬 작동방식에 따른 온 ${\cdot}$ 습도 조절효과 (Control Effect of Temperature and Humidity by Ventilation Fan Operation Methods in Wintering Honey Bee House)

  • 이종원;이현우;이석건;김란숙;최광수
    • 생물환경조절학회지
    • /
    • 제12권3호
    • /
    • pp.127-131
    • /
    • 2003
  • 본 연구에서는 양봉사 내부환경을 보다 효율적으로 조절할 수 있는 환기팬 작동방식을 구명하기 위하여 시뮬레이션을 통해 얻어진 환기팬 작동방식에 대한 연 구결과를 양봉사에 직접 적용하여 실험을 실시하였으며, 양봉사 내부의 온도 및 습도변화에 대한 시율레이션과 실험결과를 비교 ${\cdot}$ 분석하여 양봉사 설계시 양봉사 열환경 해석 프로그램의 적용성을 검토하고, 실험결과를 이용하여 환기팬 작동방식별 양봉사 내부환경의 조절 성능을 분석하였다. 기 개발된 양봉사 열환경 해석 프로그램은 앞으로 양봉사 설계에 적절하게 이용할 수 있을 것으로 판단되었다. 외부기온이 비슷한 조건에서는 환기팬 작동방식 B의 경우가 A의 경우보다 양봉사의 내부온도가 대체로 더 낮았으며, 평균적으로 벌통 내부는 2.8$^{\circ}C$, 양봉사 내부는 2.1$^{\circ}C$ 더 낮았다. 이것은 Lee 등(1998b)이 제시한 환기팬 작동방식에 따라 양봉사 내부의 승온억제를 최고 2.8$^{\circ}C$까지 할 수 있다는 내용을 뒷받침하는 실험결과이다. 환기팬 작동방식 A와 B 모두 꿀벌이 월동하기에 적합한 상대습도 범위 (50~75%) 였으나, 방식 B가 A 보다 양봉사 내부 습도의 최고 및 최저편차가 약 2%, 평균습도가 약 5% 적게 나타나 습도환경조절에 있어 좀 더 안정적인 것으로 판단되었다. 따라서 환기팬 작동방식 B는 A 에 비하여 양봉사 내부환경조절 성능이 더욱 우수하고 효율적인 것으로 판단되었다.

열차공급계획의 수익성 분석에 관한 연구 (A study on profitability of train schedule planning)

  • 우희문;장성용;김동희
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1538-1545
    • /
    • 2004
  • In the train schedule plan corresponds to a master plan for transport services. This service plan must be constructed to minimize operational cost or maximize revenue considering transportation demands and resource capacities in the operation company, and it includes several sub-planning activities such as train operation frequency plan, train schedule plan, train capacity assignment plan, and rolling stock requirement plan. In this paper, we present profitability evaluation system for the current train schedule plan. The proposed system can be used for evaluating profitability by estimating train service revenue considering customer demands.

  • PDF

ATO 자동운전 기반의 무인운전 경전철 TPS에 관한 연구 (A Study on TPS based on ATO for Driverless LRT)

  • 이창형;이종우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.1132-1137
    • /
    • 2008
  • Automatic Operation based on ATO (Automatic Train Operation) is necessary for driverless Light Rail Transit business. When this kind of driverless LRT operation plan is made, TPS (Train Performance Simulation) is traditionally simulated at all-out mode and coasting mode based on manual operation. Commercial schedule speed equals to all-out speed minus $9{\sim}15%$ make-up margin. Coasting mode TPS simulation is also run at commercial schedule speed to calculate run time and energy consumption. But TPS based on manual operation should make an improvement on accuracy in case of driverless LRT operation Plan. In this paper, new fast mode TPS simulation using ATO pattern is proposed and show near actual ATO result. The actual ATO pattern can be accurately simulated with the introduction of 4 parameters such as commercial braking rate, jerk, station stop profile and grade converted distance. Normal mode TPS simulation for commercial schedule speed can be designed to have fast mode trip time plus 3 seconds/km margin recommended by korean standard LRT specification.

  • PDF

기록물분류기준표의 운영과 과제 (A study on Improving Operation of the Records Disposition Schedule)

  • 박유진
    • 기록학연구
    • /
    • 제8호
    • /
    • pp.57-95
    • /
    • 2003
  • For a good record maintenance according to organization and functions in Korea, it is required to make better use of 'Records Disposition Schedule', which is originally developed as a computerized system that can control the whole records maintenance procedure and manage every record according to organization and functions. 'Records Disposition Schedule' is only a system that allows us to maintain every record according to organization and functions and manage every information about such organization and functions. Accordingly, a well-functioning Records Disposition Schedule requires the exact modification and operation of such schedule depending upon organizational or functional changes. If the Records Disposition Schedule is not reasonably modified and operated depending upon organizational or functional changes, we won't be able to maintain any records in linkage with organization and functions and control the whole works throughout record maintenance.

회분공정의 장치 고장을 고려한 동적생산계획 기법 (Rescheduling algorithms considering unit failure on the batch process management)

  • 고대호;문일
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1996년도 한국자동제어학술회의논문집(국내학술편); 포항공과대학교, 포항; 24-26 Oct. 1996
    • /
    • pp.1028-1031
    • /
    • 1996
  • Dynamic scheduling is very important in constructing CIM and improving productivity of chemical processing systems. Computation at the scheduling level requires mostly a long time to generate an optimal schedule, so it is difficult to immediately respond to actual process events in real-time. To solve these problems, we developed dynamic scheduling algorithms such as DSMM(Dynamic Shift Modification Method), PUOM(Parallel Unit Operation Method) and UVVM(Unit Validity Verification Method). Their main functions are to minimize the effects of unexpected disturbances such as process time variations and unit failure, to predict a makespan of the updated dynamic schedule and to modify schedule desirably in real-time responding to process time variations. As a result, the algorithms generate a new pertinent schedule in real-time which is close to the original schedule but provides an efficient way of responding to the variation of process environment. Examples in a shampoo production batch process illustrate the efficiency of the algorithms.

  • PDF

유전 알고리즘을 이용한 선각 가공 작업일정계획 시스템의 개발에 관한 연구 (Operation Scheduling System for Hull Block Fabrication in Shipbuilding using Genetic Algorithm)

  • 조규갑;김영구;류광렬;황준하;최형림
    • 산업공학
    • /
    • 제11권3호
    • /
    • pp.115-128
    • /
    • 1998
  • This paper presents a development of operation scheduling and reactive operation scheduling system for hull fabrication. The methodology for implementing operation scheduling system is HHGA(Hierarchical Hybrid Genetic Algorithm) which exploits both the global perspective of the genetic algorithm and the rapid convergence of the heuristic search for operation scheduling. The methodology for the reactive operation scheduling is the revised HHGA which consists of manual schedule editor for occurrence of exceptional events and the revised scheduling method used in operation scheduling. As the results of experiment, it has been confirmed that HHGA is able to search good operation scheduling within reasonable time, and the revised HHGA is able to search load-balanced reactive operation scheduling with minimum changes of initial operation schedule within short period of time.

  • PDF

화력발전소 원료 공급계획을 위한 휴리스틱 알고리즘 (A Heuristic Algorithm for Power Plant Coal Supply Planning Problems)

  • 김철연;문형근;최경현
    • 대한산업공학회지
    • /
    • 제37권2호
    • /
    • pp.132-143
    • /
    • 2011
  • This paper deals with a coal supply planning problem for power plants. We propose a mathematical optimization model to make decisions for coal pile sections, movement of reclaimers, and operation time of conveyor belts. The objective of the proposed model is to minimize the total operation time of conveyor belts and total movement time of reclaimers. The algorithm firstly selects a pile section by considering both the location of reclaimers and the stock amount on that pile section. And then the shortest path from the selected pile section has to be put into the operation schedule and check whether the total operation time is satisfied. Then finally the new schedule is updated. To this end, we have tested the proposed algorithm comparing with the general standard optimization package for the simplified problem SCSPP. From the numerous test runs for comparing with the existing coal supply scheduling methods, We see that the proposed model may improve the coal supply operation by reducing significant coal supply costs.

커패시터의 최적 스케줄링을 고려한 ULTC의 협조 제어 (Coordinated Control of ULTC Considering the Optimal Operation Schedule of Capacitors)

  • 박종영;박종근;남순열
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권6호
    • /
    • pp.242-248
    • /
    • 2006
  • This paper proposes a coordinated control method for under-load tap changers (ULTCs) with shunt capacitors to reduce the operation numbers of both devices. The proposed method consists of two stages. In the first stage, the dispatch schedule is determined using a genetic algorithm with forecasted loads to reduce the power loss and to improve the voltage profile during a day. In the second stage, each capacitor operates according to this dispatch schedule and the ULTCs are controlled in real time with the modified reference voltages considering the dispatch schedule of the capacitors. The performance of the method is evaluated for the modified IEEE 14-bus system. Simulation results show that the proposed method performs better than a conventional control method.

SIMPLIFIED SIMULATION APPROACH TO MANAGING SCHEDULE-OVERRUN RISKS IN CONSTRUCTION OPERATIONS

  • Wah-Ho CHAN;Ming LU
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.929-934
    • /
    • 2005
  • The complex and dynamic job nature and the ever-changing working environment of construction projects inevitably present uncertainties to construction operations. Identification, evaluation and control of uncertainties constitute main elements of risk management and critical tasks of project management in construction. This paper is focused on application of a simplified discrete-event simulation approach in management of schedule-overrun risks, each being the combination of the occurrence probability of an uncertain interruptive factor and its potential consequence in terms of time delay. A case study observed from a concreting operation in Hong Kong is converted into a simulation model and analyzed with an in-house-developed simulation package for demonstrating how the proposed approach can be implemented to manage multiple schedule-overrun risks on construction projects.

  • PDF