• Title/Summary/Keyword: Operation limit

Search Result 874, Processing Time 0.026 seconds

Evaluation of Supplying Instream Flow by Operation Rule Curve for Heightening Irrigation Reservoir (이수관리곡선에 의한 증고저수지의 하천유지유량 공급 가능성 평가)

  • Lee, Jae-Nam;Noh, Jae-Kyoung
    • Korean Journal of Agricultural Science
    • /
    • v.37 no.3
    • /
    • pp.481-490
    • /
    • 2010
  • Baekgog reservoir is located in Jincheon county, Chungbuk province, of which full water levels will be heightened from EL. 100.1 m to EL. 102.1 m, and total storages from 21.75 $Mm^3$ to 26.67 $Mm^3$. The simulation for reservoir inflow was conducted by DAWAST model. The annual average irrigation water was estimated to 33.19 $Mm^3$ supplied to 2,975 ha and the instream flows could be allocated with 0.14 mm/d from October to April with annual average of 2.52 $Mm^3$. The operation rule curve was drawn using inflow, irrigation, and instream flow requirements data. The reservoir water storage was simulated on a daily basis in case of both normal and withdrawal limit operation. In case of normal operation, the annual average irrigation water supply increased from 31.95 $Mm^3$ to 33.32 $Mm^3$, the instream water supply from 2.40 $Mm^3$ to 2.44 $Mm^3$, the water storages from 15.74 $Mm^3$ to 19.88 $Mm^3$, and the water supply reliability from 77.3 % to 81.6 %. In case of operation with withdrawal limit, the amount of instream water supply was 2.52 $Mm^3$ from reservoir regardless of the condition while the water storage increased from 16.77 $Mm^3$ to 20.65 $Mm^3$. The irrigation water supply capacity was appropriate for the case of normal operation with 2 m heightened condition. The present instream water supply capacity was 35,000 $m^3$/d (6.86 $Mm^3$/y) while 42,000 $m^3$/d (8.36 $Mm^3$/y) in 2 m heightened condition in case of withdrawal limit operation.

Maintenance Limit Renewal Policy for Inferiority System based on Opportunity Cost (기회비용을 고려한 열화시스템의 보전한계갱신정책)

  • 박상민;김연수
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.17 no.32
    • /
    • pp.233-242
    • /
    • 1994
  • This study deals with the derivative adverse minimum for inferiority system depends on continuose operating under infinite planning horizon. This planning will be accomplished by maintenance limit renewal policy in consideration of opportunity cost which affects system by failure during operation periods and expected cost under nomal operation states. By the results, we will be expected incresing total efficiency for the system by optimal renewal policy.

  • PDF

A Study on the Performance and Operation Limit of Electrodialysis Cell for HI Concentration (HI 농축에 대한 전기투석 셀의 성능 및 운전한계조건 연구)

  • Lee, Byung-Woo;Jeong, Seong-Uk;Cho, Won-Chul;Kang, Kyoung-Soo;Park, Chu-Sik;Bae, Ki-Kwang;Kim, Young-Ho;Kim, Chang-Hee
    • Journal of Hydrogen and New Energy
    • /
    • v.22 no.6
    • /
    • pp.749-758
    • /
    • 2011
  • The present work explores the performance and operation limit of electrodialysis cell for HI concentration in sulfur iodine thermochemical hydrogen production process, For this purpose, the electrodialysis cell was assembled with Nafion 117 as a PEM membrane and two activated carbon papers as the electrodes. HIx solution was prepared with composition of HI: $I_2$: $H_2O$ = 1: 0.5~2.5: 5.2 in molar ratio. The cell and its peripheral apparatus were placed in the specially designed convective oven in order to uniformly maintain the operation temperature. As operation temperature increased, the amount of water transport from anode to cathode increased, thus reducing HI molarity in catholyte. Meanwhile, the current efficiency was constant as about 90 %, irrespective of temperature change. The cell voltage increased with initial $I_2$ mole ratio as well as anolyte to catholyte mole ratio. Moreover the cell voltage overshot took place within 10 h cell operation, which is due to the $I_2$ precipitation inside the cell. From the analysis of $I_2$ mole ratio in the anolyte, it is noted that operation limit (in $I_2$ mole ratio) of the electrodialysis cell, arising from was measured to be 3.2, which is much lower than bulk solubility limit of 4.7.

Study on the optimum system operation by considering the spinning reserve power (순동예비력을 고려한 계통의 최적운용방식에 관한 연구)

  • 송길영
    • 전기의세계
    • /
    • v.24 no.5
    • /
    • pp.97-102
    • /
    • 1975
  • This paper describes the result of a Study for the Optimum Operating method with Spinning reserve in case of outage of large generator unit to improve the system stability and prevent the system frequency drop. This is usually done by governor free operation, so we focused our attention to the operating Char acteristics of spinning reserve. Nexy, a study was made to mesure the upper limit of Spinning reserve and when this upper limit cannot match the required power, a relationship between the amount of spinning reserve and that of the load shedding requirement was searched with regard to several system operating conditions to use it in our future system operation. By this study, the optimum system operating method was recommended for reliable operation of power system.

  • PDF

A Control Method of Distributed Generation System Which is Connected to Power Distribution System : Without LDC Operation (배전계통에서의 분산전원 도입운용 관리방법 : LDC 운전을 하지 않을 경우)

  • Jung, Won-Jae;Kim, Tae-Eung;Kim, Jae-Eon
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.231-233
    • /
    • 2001
  • Nowadays, small scale DGS(Distributed Generation System), as a wind power generation or photovoltaic generation, becomes to be introduced into the power distribution system. But in that case, it is difficult to properly maintain the terminal voltage of low voltage customers. So, it is necessary to determine the permissible operation limit of the introduced DGS for proper voltage in distribution system. In this paper computes permissible operation limit of DGS when the DGS is connected to power distribution system using fixed tap(without LDC operation). For this simulation, KEPCO distribution system is used.

  • PDF

On-line Estimation of DNB Protection Limit via a Fuzzy Neural Network

  • Na, Man-Gyun
    • Nuclear Engineering and Technology
    • /
    • v.30 no.3
    • /
    • pp.222-234
    • /
    • 1998
  • The Westinghouse OT$\Delta$T DNB protection logic heavily restricts the operation region by applying the same logic for a full range of operating pressure in order to maintain its simplicity. In this work, a fuzzy neural network method is used to estimate the DNB protection limit using the measured average temperature and pressure of a reactor core. Fuzzy system parameters are optimized by a hybrid learning method. This algorithm uses a gradient descent algorithm to optimize the antecedent parameters and a least-squares algorithm to solve the consequent parameters. The proposed method is applied to Yonggwang 3&4 nuclear power plants and the proposed method has 5.99 percent larger thermal margin than the conventional OT$\Delta$T trip logic. This simple algorithm provides a good information for the nuclear power plant operation and diagnosis by estimating the DNB protection limit each time step.

  • PDF

Implementation of Dual Current Controller and Realtime Power Limiting Algorithm in Grid-connected Inverter during Unbalanced Voltage Conditions (전원 전압 불평형시 계통연계형 인버터의 유효전력 리플 억제를 위한 듀얼 전류제어기 구현과 출력 전력의 실시간 제한 알고리즘)

  • Song Seung-Ho;Kim Jeong-Jae
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.55 no.1
    • /
    • pp.54-60
    • /
    • 2006
  • A power limiting algorithm is proposed for stable operation of grid-connected inverter in case of grid voltage unbalance considering the operation limit of inverter. During the voltage unbalance the control performance of Inverter. is degraded and the output power contains 120Hz ripple due to the negative sequence of voltage. In this paper, conventional dual sequence current controller is implemented to solve these problems using separated control of positive and negative sequence. Especially the maximum power limit which guarantees the maximum rated current of the inverter is automatically calculated as the instant grid voltage changes. As soon as the voltage recovers the proposed algorithm can return to the normal power control mode accomplishing low voltage ride through. Proposed algorithm is verifed using PSCAD/EMTDC simulations and tested experimentally at 4.4kW wind turbine simulator set-up.

The NAND Type Flash EEPROM Using the Scaled SONOSFET (Scaled SONOSFET를 이용한 NAND형 Flash EEPROM)

  • 김주연;권준오;김병철;서광열
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 1998.11a
    • /
    • pp.145-150
    • /
    • 1998
  • 8$\times$8 bit scaled SONOSFET NAND type flash EEPROM that shows better characteristics on cell density and endurance than NOR type have been designed and its electrical characteristics are verified with computer aided simulation. For the simulation, the spice model parameter was extracted from the sealed down SONOSFET that was fabricated by $1.5mutextrm{m}$ topological design rule. To improve the endurance of the device, the EEPROM design to have modified Fowler-Nordheim tunneling through the whole channel area in Write/Erase operation. As a result, it operates Write/Erase operation at low current, and has been proven Its good endurance. The NAND type flash EEPROM, which has upper limit of V$_{th}$, has the upper limit of V$_{th}$ as 4.5V. It is better than that of floating gate as 4V. And a EEPROM using the SONOSFET without scaling (65$\AA$-l65$\AA$-35$\AA$), was also designed and its characteristics have been compared. It has more possibliity of error from the V$_{th}$ upper limit as 4V, and takes more time for Read operation due to low current. As a consequence, it is proven that scaled down SONOSFET is more pertinent than existing floating gate or SONOSFET without scaling for the NAND type flash EEPROM.EPROM.

  • PDF

Seismic Fragility Analysis of Container Crane Considering Far-Fault and Near-Fault Ground Motion Characteristics (원거리와 근거리 지진파의 특성을 고려한 항만 컨테이너 크레인의 지진취약도 분석)

  • Park, Ju-Hyun;Min, Jiyoung;Lee, Jong-Han
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.27 no.2
    • /
    • pp.83-90
    • /
    • 2023
  • The recent increase in earthquake activities has highlighted the importance of seismic performance evaluation for civil infrastructures. In particular, the container crane essential to maintaining the national logistics system with port operation requires an exact evaluation of its seismic response. Thus, this study aims to assess the seismic vulnerability of container cranes considering their seismic characteristics. The seismic response of the container crane should account for the structural members' yielding and buckling, as well as the crane wheel's uplifting derailment in operation. The crane's yielding and buckling limit states were defined using the stress of crane members based on the load and displacement curve obtained from nonlinear static analysis. The derailment limit state was based on the height of the rail, and nonlinear dynamic analysis was performed to obtain the seismic fragility curves considering defined limit states and seismic characteristics. The yield and derailment probabilities of the crane in the near-fault ground motion were approximately 1.5 to 4.7 and 2.8 to 6.8 times higher, respectively, than those in the far-fault ground motion.

The study on Measuring of Environmental Radioactivity in the Vicinity of Yonggwang Nuclear Power Plant (영광 원자력 발전소 주변 환경 방사능 측정에 관한 연구)

  • 박종섭
    • Economic and Environmental Geology
    • /
    • v.32 no.3
    • /
    • pp.273-280
    • /
    • 1999
  • In order to protect inhabitans' health and to collect data for prediction of the effcts from accidental emission of rasioactive materials from nuclear power plant, exposed dose rate be monitored within the limit dose rate. This research was carried out to investigate the accumulation of environmental radioactivity around Younggwang Nuclear Power Plant, and to infer and in infer and assay the additional exposed dose rate of inhabitants in Younggwang site from the operation of nuclear plant operation. External radiation dose rate, radiation environmental samples, and exposed dose rate of inhabitants in Younggwang site were investigated for estimaing environment activity in the vicinity of the nuclear power plant area. For the external radiation dose rate, the result showed that range of normal variation was found and any artificial radioisotope was not deteted in the analysis of environmental samples. Exposed dose rate of inhabitants was lower than 0.4% of the limit value of ICRP and it may be concluded that there was no effect on inhabitants and environment from the operation of nuclear power plant.

  • PDF