• Title/Summary/Keyword: Operation and maintenance

Search Result 2,133, Processing Time 0.043 seconds

Review on the Operation, Administration, and Maintenance(OAM) of BcN

  • Chun, Kyung-Gyu;Song, Jong-Tae;Lee, Soon-Seok
    • Journal of Communications and Networks
    • /
    • v.8 no.4
    • /
    • pp.480-484
    • /
    • 2006
  • This paper briefly reviews ITU-T recommendations associated with multi protocol label switch (MPLS) and Ethernet operation, administration, and maintenance (OAM). The broadband convergence network (BcN) architecture with a centralized network controller is introduced. An aggregation structure employing Ethernet, MPLS, and time division multiplexing (TDM) signal is presented for the BcN. A physical link failure scenario is examined to investigate how the maintenance signal is propagated between different layers.

A Study on the Maintenance System Module Design for the BTL Project Facilities : Focused on Educational Facilities (임대형 민자사업(BTL) 발주 시설물의 합리적 유지관리시스템 모듈 설계에 관한 연구 -교육시설물을 중심으로-)

  • Kim, Sang-Seok;Son, Jae-Ho;Lee, Seung-Hyun;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.702-707
    • /
    • 2008
  • BTL projects for educational facilities were conceived in 2005 to supply public facilities in a timely and efficient manner After the projects were completed in March 2007, proper facility maintenance has become an increasingly important issue. However, BTL projects are still in an early developmental stage, and the data on the maintenance and operation of such facilities are not yet available because the operation of the facilities has just begun. Accordingly, this study is conducted to derive maintenance processes and to specify maintenance items for the efficient maintenance of BTL educational facilities. Then, database on the maintenance processes will be created, and a maintenance system module will be designed.

  • PDF

Conceptual Simulation Model for Evaluating Availability of Railway System (철도 시스템 가용성능 시뮬레이션 개념 모형)

  • Kim, Jong-Woon;Kim, Hee-Wook;Ohn, Jung-Ghun;Kwon, Tae-Soo;Jeong, Do-Sik
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1241-1245
    • /
    • 2011
  • High RAM performance and efficient operation plan and maintenance equipment and policies are needed for improving the system availability performance such as punctuality and schedule adherence while reducing life cycle cost. Because railway systems are repairable, complex and have multi-echelon maintenance support structure, it is much complicated to set RAM performance targets and operation and maintenance plan. It is not easy to solve these problem by mathematical method and simulation can be consider for them. This article suggests the conceptual simulation model for analysing availability of railway system which has complex system structure and operation/maintenance environment.

  • PDF

Schema of Maintenance Data Exchange and Implementation Applied To Ship & Offshore Platform

  • Son, Gum Jun;Lee, Jang Hyun
    • Journal of Advanced Research in Ocean Engineering
    • /
    • v.4 no.3
    • /
    • pp.96-104
    • /
    • 2018
  • The importance of data management for the efficient maintenance and operation of offshore structures is becoming increasingly important. This paper has discussed the data schema and business rules that standardize the data exchange between ship design, operation and maintenance. Technical documentation that meets the international standards of ShipDex and S1000D for exchanging the operation and management data in neutral or standard formats has been introduced into the life cycle management of ships. The schema of the data exchange is represented by XML (eXtensible Markup Language) and the lifecycle data is implemented by a structured document. Lifecycle data is represented as data modules defined by XML schema. Given the feasible data generation, an example of a technical document is introduced by a general XML authoring tool.

Graphic Simulator for Analyzing the Remote Operation of the Advanced Spent Fuel Conditioning Process

  • Song, Tai-Gil;Kim, Sung-Hyun;Lee, Jong-Ryul;Yoon, Ji-Sup
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.1319-1322
    • /
    • 2003
  • KAERI is developing the Advanced Spent Fuel Conditioning Process (ACP) as a pre-disposal treatment process for spent fuel. Equipment used for such a spent fuel recycling and management process must operate in intense radiation fields as well as in a high temperature. Therefore, remote maintenance has a played a significant role in this process because of combined chemical and radiological contamination. Hence suitable remote handling and maintenance technology needs to be developed along with the design of the process concepts. To do this, we developed the graphic simulator for the ACP. The graphic simulator provides the capability of verifying the remote operability of the process without fabrication of the process equipment. In other words, by applying virtual reality to the remote maintenance operation, a remote operation task can be simulated in the graphic simulator, not in a real environment. The graphic simulator will substantially reduce the cost of the development of the remote handling and maintenance procedure as well as the process equipment, while at the same time producing a process and a remote maintenance concept that is more reliable, easier to implement, and easier to understand.

  • PDF

A Study on the Efficient Operation of Automated Teller Machine(ATM) Maintenance Using Simulation (시뮬레이션을 이용한 금융 ATM기 유지보수의 효율적 운영에 관한 연구)

  • Yu, Hyeung-Keun;Lee, Kang-Won
    • Korean Management Science Review
    • /
    • v.28 no.1
    • /
    • pp.107-116
    • /
    • 2011
  • The automated teller machine (ATM) is developed as a system to provide customers with an easy deposit and withdrawal of their money without time restriction and be served for 24 hours. Today, ATM is come up to the level of an unmanned branch. The automatic financing system is developed as an essential one for dealing with the rationalization of management and the globalization of financing in order to improve the efficiency of financial management work and increase the customer service quality. With reducing the operational cost of financial organizations through the efficient maintenance operation of ATM and increasing the service quality through the maximization of its processing efficiency, this study is to draw the scheme to ensure the competitiveness among the finance companies. The importance of ATM is highly recognized as the utilization of ATM is increased and the processing function is extended, but ATM is quite vulnerable to the malfunction occurred during the nighttime after banking hours. The ATM maintenance is done through consignment to the specialized maintenance company. The efficient operation of ATM maintenance work is important to the satisfaction of customer using ATM in the nighttime.

An estimation method for the maintenance timing of the infiltration trench (침투도랑 시설의 유지관리 시점 산정방법에 관한 연구)

  • Lee, Seung Won;Cha, Sung Min
    • Journal of Korean Society on Water Environment
    • /
    • v.36 no.1
    • /
    • pp.29-35
    • /
    • 2020
  • To manage the non-point source pollution and restore the water circulation, many technologies including infiltration or reservoir systems were installed in the urban area. These facilities have many problems regarding maintenance as their operation period becomes lengthier. The purpose of this study was to estimate the optimal maintenance timing through a long-term load test on the infiltration trench as one of the low impact development techniques. An infiltration trench was installed in the demonstration test facility, and stormwater was manufactured by Manual on installation and operation of non-point pollution management facilities from the Ministry of Environment, Korea and entered into the infiltration trench. Particle size distribution (PSD), suspended solids (SS) removal efficiency, and infiltration rate change tests were performed on inflow and outflow water. In case of the PSD, the maximum particulate size in the outflow decreased from 64 ㎛ to 33 ㎛ as the operating duration elapsed. The SS removal efficiency improved from 97 % to 99 %. The infiltration rate changed from 0.113 L/sec to 0.015 L/sec during the operation duration. The maintenance timing was determined based on the stormwater runoff requirements with these changes in water quality and infiltration rate. The methodologies in this study could be used to estimate the timing of maintenance of other low impact development techniques.

Development of PEID for Acquiring Maintenance Information during Product Lifecycle of Marine Vessels (선박해양구조물의 제품수명주기 내 유지보수 정보 획득을 위한 PEID에 관한 연구)

  • Jeon, Jeong-Ik;Lee, Jang-Hyun;Son, Gum-Jun
    • Journal of Ocean Engineering and Technology
    • /
    • v.26 no.5
    • /
    • pp.63-72
    • /
    • 2012
  • The product lifecycle of a marine vessel can be classified into the design-production, operation-maintenance, and disposal phases. During the operation and maintenance phase, status data should be gathered from the major machinery and instruments installed on the marine vessel in order to perform efficient maintenance work. Although a PLM (product lifecycle management) system can manage the product information during the design and assembly stage, a PLM based on asset management technology is more appropriate for product information management during the operation stage. Product embedded information devices (PEIDs) are suggested for gathering real-time maintenance information during the operation and maintenance lifecycle. A PEID allows PLM to provide the capability of offering active information exchange between the lifecycle management system and equipment. This study designed a PEID to effectively obtain information and interact with a PLM system. It consists of sensors, wireless communication, and a micro-processor, which allow it to accumulate status data on the PLM system. The embedded information device and PLM enable the seamless information flow, tracking, and updating of MRO (maintenance repair and overhaul) information for a product throughout the middle of the product lifecycle.

A Study for Maintenance Period Extension based on Reliability of Korea Trainer (국산훈련기 신뢰성기반 정비주기 연장방안 연구)

  • Jo, Intak;Park, Jong Hun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.4
    • /
    • pp.123-132
    • /
    • 2020
  • Currently, there are two types of trainer in Korea : basic and advanced. Both models have been in operation for more than 10 years, and compared to the early stage of operation, reliability has gradually improved and failure rates have also entered a trend of stabilization. Therefore, it is necessary to extend the maintenance period considering economic feasibility. This study investigates the three maintenance period calculation methods: NAVAIR 00-25-403 [17], DOD, U.S. [4], CERL and US Army [3], with intention to extend the maintenance period of the trainer from current 200 hours to 400 hours. In addition, the maintenance period was calculated by the three methods with actual operational data. Common standards and procedures were established to apply operational data to the existing maintenance period calculation methods, the required reliability indicators were derived, and the maintenance periods was calculated based on the results, additionally, a review on the field applicability of the three maintenance cycles was conducted. An on-site interviews were conducted with the calculation results, and 11 out of the 15 items were expected to be extended by 400 hours. It was suggested that the remaining 4 items could be extended to 400 hours by supplementing the inspection method through additional analysis such as functional analysis, inspection content verification, and site connection.

A Study on the Successful Factors in the Application of RIMS Project for the Safe Operation of Rolling Stocks in the Public Transportation (공공교통 전동차 안전운행을 위한 RIMS 프로젝트 적용의 성공요인 연구)

  • Lee, Kang-Won;Bhang, Youn-Keun;Son, Young-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.5 s.36
    • /
    • pp.555-560
    • /
    • 2006
  • This study finds out and suggests success factors for the application of RIMS project through the case study of Seoul Metro and literature survey. The successful application of RIMS needs expert knowledge and concept of BOM, standardization of maintenance planning, check lists of heavy maintenance inspection, organization structure of rolling stock maintenance offices, material management system of warehousing and the process of parts repairing between offices, connection of material ordering system, problem solving of circular spare parts administration among inspection, maintenance, and material organizational units, systemic serial number management of parts with RFID, daily closing diary connected with work process chart, and sufficient period of RIMS's test run. RIMS contributes to real time management of rolling stock maintenance, transparency of management, reliability of train operation, customer satisfaction, and management innovation.