Automatic Operation based on ATO (Automatic Train Operation) is necessary for driverless Light Rail Transit business. When this kind of driverless LRT operation plan is made, TPS (Train Performance Simulation) is traditionally simulated at all-out mode and coasting mode based on manual operation. Commercial schedule speed equals to all-out speed minus $9{\sim}15%$ make-up margin. Coasting mode TPS simulation is also run at commercial schedule speed to calculate run time and energy consumption. But TPS based on manual operation should make an improvement on accuracy in case of driverless LRT operation Plan. In this paper, new fast mode TPS simulation using ATO pattern is proposed and show near actual ATO result. The actual ATO pattern can be accurately simulated with the introduction of 4 parameters such as commercial braking rate, jerk, station stop profile and grade converted distance. Normal mode TPS simulation for commercial schedule speed can be designed to have fast mode trip time plus 3 seconds/km margin recommended by korean standard LRT specification.
Barro, Ronald Dela Cruz;Kim, Jun-Seong;Lee, Don-Chool
Journal of Advanced Marine Engineering and Technology
/
v.35
no.3
/
pp.301-308
/
2011
International Maritime Organization (IMO) proposed the Energy Efficiency Operation Indicator (EEOI) in 2005 and the Energy Efficiency Design Index (EEDI) in 2008 so as to address emission concern and regulation. Likewise, Ship Energy Efficiency Management Plan (SEEMP) and Greenhouse Gas (GHG) monitoring and management are also becoming an issue lately. This paper introduces the energy efficiency design index (operation indicator) monitoring system (EDiMS) software can continuously monitor $CO_2$, $NO_x$, $SO_x$, and PM values emitted from ship. The accurate inventory of ships GHG can be obtained from base of emission result during the engine shop test trial and the actual monitoring of shaft power and ship speed. In addition, the ability to store all exhaust emission and engine operation data can be applied as the useful tool of the inventory work of air pollution and ship energy management plan for the mitigation or reduction of ship emissions.
Sin, Dong-Mok;Lee, Chang-Ho;Choi, Jae-Jin;Noh, Sang-Do;Lee, Ki-Woo
Journal of the Korean Society for Precision Engineering
/
v.18
no.1
/
pp.63-73
/
2001
This paper presents a process and operation planning system with an NC code post-processor for effective machining of press dies for production of cars. Based on the machining features, major parts of press dies are categorized into 15 groups and a standard process plan is defined for each group. The standard process plan consists of a series of processes where a process is defined as a group of operations that can be done with one setup. Details such as cutting tools, cutting conditions, and tool paths are decided at the operation planning stage. At the final stage of process and operation planning, the NC code post-processor we developed adjusts feedrates along the tool path to reduce machining time. The adjustment rule is selected based on the metal removal rate estimated by virtually machining with virtual cutting tool.
Kim, Jun Hwan;Lim, Jae Jin;Park, Yu Rim;Lee, Jang Ryong
Journal of the Korean Society for Aviation and Aeronautics
/
v.29
no.4
/
pp.105-116
/
2021
The importance of a systematic approach to collect, process, analyze, and share safety data in aviation safety management is continuously increasing. Accordingly, the domestic aviation industry has been making efforts to build a Big-data platform that can utilize multi-field safety data generated and managed by various stakeholders and to develop safety management technology based on them. Big data platforms not only must meet appropriate technical requirements, but also need to establish a management system for effective operation. The purpose of this study is to suggest the requirements of the aviation safety big data platform operation procedure and plan by reviewing the advanced overseas cases (FAA ASIAS). This study can provide overall framework and managerial direction for the operation of the aviation safety big data platform.
This study tried to suggest a systematic improvement plan to prepare a civil safety insurance operation and management system by reviewing the operation and management status of civil safety insurance, which is operated and managed by each local government autonomously. In this study, the problems of the current civil safety insurance were analyzed by dividing them into the lack of systematic management of insurance items, overlapping coverage between insurance items, and deviations in compensation limits. As a systematic improvement plan, it was suggested to secure the systemic management of guarantee items, standardize compensation standards, prepare an integrated operation and management system, and provide financial support for local governments with poor financial independence. Since the problems and improvement plans for the civil safety insurance analyzed as described above are formed by exchanging and receiving a complex mutual influence, the institutional improvement plan for the operation and management system of the civil safety insurance is not only a specific part of the study, but also comprehensively current citizens. Based on the results derived from the analysis of safety insurance, it is concluded that alternatives must be found.
Park, Junwon;Lee, Sang-Ho;Kim, Sung-Hoon;Won, Jeong-Hun;Yoon, Young-Cheol
Journal of the Korean Society of Safety
/
v.33
no.2
/
pp.76-85
/
2018
The interest in the Building Information Modeling (BIM) technology has risen remarkably due to the effects on construction work period reduction, cost reduction, work safety improvement, and other factors. In civil engineering field, BIM applications mainly focus on data modeling and virtual construction. In this study, we present the BIM-based virtual construction and analyze the effects of BIM for the railway facilities so that the conventional approach to the equipment operation plan can be improved in order to prevent safety accidents which can result from unclear information during the operation plan. The BIM-based virtual construction technology is applied to establish the construction plan for the site with constraints, the installation of steel girder needs to be completed, avoiding interference with the existing high-speed railway operation within a given limited time. A virtual construction model consisting of topography, structures, equipments, and avatar was built and more detailed model, including safety guard rails, was then created. Specifications of the construction equipment were input as a database, and the virtual construction model was manipulated in the equipment operation planning. Through the BIM-based virtual construction, including the verification of alternative construction method, 311 million won was saved and the construction period was shortened by 87 days compared to the original plan. In addition, it was shown that the interest and participation of the construction workers can be increased by providing the 3D virtual scene for real construction work and various safety hazards occurring during equipment operation can be effectively removed in advance by the interactive worker education.
Proceedings of the Korea Society for Simulation Conference
/
2001.10a
/
pp.468-476
/
2001
The ROK TRANSCOM is trying to establish a concrete wartime sealift operation plan. But there are many problems to be solved for setting up the plan. The most serious problem is to procure war materiel to be shipped in U.S.A and next one is to determine the number of sealift assets and to allocate them. The process of sealift operation can be described as follows. Before the order of vessel mobilization, all vessels appointed for activation would be scattered in worldwide in the state of Beaded or unloaded. After the order of vessel mobilization, vessels would go to SPGE(seaport of embarkation) to load war materiel. Some loaded ships should offload the commercial cargo to the near port as soon as they are activated, before they would go to SPOE. All vessels would load procured materiel in SPOE and then go to SPOD(seaport of debarkation). They would offload war materiel in SPOD and then go back to SPOE to load war materiel again. We will simulate this process using ARENA(1), evaluate the sealift capability of ROK and find omit problems of the sealift plan. This model ultimately evaluates the sealift capability and provides planners with critical information far establishing and correcting the plan. This study can also provide military planners with a flexible and accessible decision support tool to provide advance planning under a variety of conditions on the sealift capability. The military planner is expected to make use of this model as a standard for establishing effective and concrete sealift operation in the near future. We can conclude how procurement capability significantly affects the result of sealift operation through this model. We could decide the appropriate levee of sealift asset such as the number of vessels and the number of available berth. So we could allocate effectively the resources for completing the sealift operation within the TGT(Target) time.
Kim, Hae Do;Lee, Kwang Ya;Park, Jong Yoon;Han, Guk Heon;Lim, Heung Chang
KCID journal
/
v.19
no.1
/
pp.77-86
/
2012
The aim of this study was to analyze the operation plan for heightened agricultural reservoir, in terms of water supply to downstream paddy fields and instreams. Operation of agricultural reservoir before the heightened reservoir project is easy to manage because of its single purpose, which is irrigation water supply. However, after proceeding the heightened project, there is needed to be set the operation rule because of its multiple purpose, which is water for irrigation and supply to the stream. In this paper, propose the method of design the criteria of supply to the stream and operation rule curve for the heightened reservoir. According to simulation results by proposed operating rule for the Gumsa reservoir, the yearly amount of water supply to the stream can be 2,588 thousand $m^3$, 3 times of the heightened space (2,588 thousand $m^3$).
Korea Aerospace Research Institute has developed an earth observation satellite whose primary mission objective is to provide high resolution electro optical earth images for Geographical Information Systems (GIS) establishment and the applications for environmental, agriculture and ocean monitoring. It was successfully launched into its mission orbit by using a commercial launch vehicle on 18th of May, 2012. This paper describes a series of launch activity at the launch site including its transportation to the launch site. Before conducting the launch site operation, satellite operation plane was prepared. Combining the satellite operation plan and launch vehicle activities, an integrated launch site operation plan and schedule have been drawn up. After arrival of the spacecraft at the launch site, post-ship check out has been conducted. And then it was fuel loaded and integrated with launch vehicle hardware. After completion of final electrical check out, count down procedure was executed. on 18th of May, it was launched into the space and was separated from the launch vehicle as planned. About 3 months of early operation and calibration/validation, now the satellite is conducting its normal mission.
This study aimed to adaptive reuse plan a take advantage of Suncheon Bay Garden Expo 2013. Detailed objectives included: to identify and foster cultural and ecological resources in Suncheon Bay and Garden Expo Site; and to search and propose characterized program in the site for efficient utilization; and to revitalize a site for the vitalizations of the region where garden culture and garden industries for strengthening local competitiveness. The study was multi-phased. The first stage included basic surveys such as site status and environmental context analysis, and questionnaires and similar case studies, and the second stage was to review the direction of preliminary planning, develop associated industries and strategies for regional revitalization and review and incorporate project details. And the third stage aimed to develop a comprehensive plan from spatial plans and program plans and suggest plans to vitalize the operation of the site. The results of the study are as follows: First, the characterization strategy is 'healing experience tourism', 'healing garden', 'healing herbal care' are suitable for the site and regional revitalization. Second, the dimension of 2013 Suncheon Bay Garden Expo which was distinguished into four areas, in consideration of the characteristics and contents of the garden expo site for efficient operation and maintenance. Four area are as follows: the park oriented area, the experiential tourism oriented area, the existing conservation oriented area, and the area for associated industries. Third, the practice of private and public partnerships is needed in order to efficiently manage and operations. The significance of this study is that it is seeking to take advantage of the Garden Expo site and set the plan by existing resources and in consideration of local characteristics, in conjunction with area to envision and proposed management plan. Some problems are remained which have not been able to deal with details program and organization and financial planning programs for the operation of the site. This is for further study.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.