• Title/Summary/Keyword: Operation Period

Search Result 3,023, Processing Time 0.044 seconds

Feasibility Check of Maintenance Period by The Operating Reliability of EMU-Focusing on the Main Components of Ansan Line EMU- (전기동차의 운행 신뢰성을 통한 유지보수주기의 타당성 검토 -안산선 전기동차의 주요부품을 중심으로-)

  • Park, Su-Myung;Song, Moon-Shuk;Son, Young-Jin;Lee, Hi-Sung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1412-1417
    • /
    • 2011
  • Safety is soaring up as a core value in accordance with the recent improvement of operating speed & incidents. rolling stock is a kind of system which works together with several components. one component has an effect on the sub-system, which can cause to the train safety operation, therefore reliability management of the major components of rolling stock is a kind of solution to the safety operation of train, but realistically maintenance in korea performed based on period rather than TBO of major components, but Japan does new maintenance system based on the major components, which optimizes maintenance tasks. actually Japan can apply to new maintenance system because they are ready in planning step but in this study, making a reliability data of major components and review the adaptability of new maintenance system to the rolling stock operating in Ansan line.

  • PDF

A Study on the Thermal Characteristics of Low Temperature Vacuum Drying by Hot Water Temperature (가열수 온도에 의한 저온진공건조 열적 특성에 관한 연구)

  • 김경근;최순열
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.25 no.3
    • /
    • pp.588-594
    • /
    • 2001
  • The aim of this paper is to develop the low temperature vacuum dryer, with low initial investments and operating costs, easy operating method and trouble-free operation Usally operations just below atmospheric pressure, as with direct dryers, but some are built for vacuum operation with pressure as low 50 mmHg abs. The lowers the boiling point to $39^{\circ}C$ The experimental data of quantitative analysis for using practically were obtained by the constant drying rate period and reducing drying rate period according to the temperature of hot water which is the experimental parameters of present experiment. As the results, it took about 20 hours for material to reach about 18% of the final moisture content is order to store products for a long time about 450% of the early moisture content at the beginning of drying and maximum drying rate comes to about 0.30 kg/m2hr at about 350% of the moisture content.

  • PDF

Biological Treatemnt of Dye Wastewater Using an Anaerobic-Aerobic System (혐기-호기 공정을 이용한 염료페수의 생물학적 처리)

  • 박영식;문정현;안갑환
    • Journal of Environmental Science International
    • /
    • v.11 no.6
    • /
    • pp.569-576
    • /
    • 2002
  • Anaerobic/aerobic reactor system was used to treat a synthetic wastewater with glucose as carbon sources(0.38~2.29 kg COD/m3.day) and Acid Red 14(1.05 "24.00 g Acid Red 141m3.day, color degree of 570 ~ 1710). COD removal efficiency by the anaerobic stage in operation period were above 90 % organic loading rate of 0.38 ~ 2.29 kg COD/m3.day(except, adaptation period) and the removal efficiency of the whole system were above 96 %. The decolorization of the Acid Red 14 was through the alteration of the dye structure(or cleavage of the Azo bond) during the anaerobic treatment. In the A/A system, the anaerobic stage played an essential role in removing both color and COD. In addition it also improves biodegradability of dye f3r further aerobic treatment. After operation, average MLSS concentration of anaerobic sludge reactor, anaerobic fixed-bed reactor and aerobic fixed-bed reactor were 17100mg/L, 20000mg/L, and 10000mg/L, respectively.

Parallel Operation of Single-Phase GTO PWM Converters (단상 GTO PWM CONVERTER의 병렬운전)

  • Lee, Hyeoun-Dong;Lee, Dong-Choon;Sul, Seung-Ki
    • Proceedings of the KIEE Conference
    • /
    • 1994.07a
    • /
    • pp.415-418
    • /
    • 1994
  • In this paper, a parallel operation of two single-phase GTO PWM converters is presented. The current ripples on the primary side of the transformer can be much reduced by shifting one modulation period from the other one by a half period. Also, a simple power factor control scheme is presented by which the reactive component of converter input current is controlled. Simulations and experimental results for a laboratory system confirm the validity of the purposed algorithm.

  • PDF

A Study on Composition of A Novel Single Phase 3 Level Inverter Circuit (새로운 단상 3전위 인버터회로의 구성에 관한 연구)

  • 이종수;백종현
    • The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.9 no.5
    • /
    • pp.51-56
    • /
    • 1995
  • The transistors of single phase 3 level PWM Inverter compose output power transistors and neutral point clamping transistors, which are NPN transistors. Waveforms of driving signals for this are PWM waves for power transistors and period operating waves for neutral point clamping transistors, which signals made W-type modulation from rectangular and sine wave. The output power transistors operate at ON-time complementary and neutral point clamping transistors operate at OFF-time complementary respectively. Therefore, each transistors operate in half period at parallel. Characteristics of this inverter circuit is parallel switching method about series switching method of general inverter. As modulation of 3 level drive signals made from full-wave rectifier of sine wave and rectangular wave, which are level wave about 3 level of complementary transistor inverter. So, this circuit composed complementary operation inverter of NPN transistors only compare with PNP-NPN complementary inverter, which have high power 3 level inverter of complementary operation.

  • PDF

Water Resources Utilization Pattern of JangSung Reservoir (장성호 수자원 이용 패턴)

  • Yoon, Kwang-Sik;Han, Kuk-Heon;Yoon, Suk-Gun;Jung, Jae-Woon
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.291-294
    • /
    • 2003
  • The Water resources utilization pattern of Jangsung reservoir was studied. The observed precipitation and existing reservoir operation data such as irrigation amount, reservoir storage, river maintenance requirement, flood control discharge were collected for ten years period and analyzed. Major findings of this study are as follows: The observed average, minimum, maximum annual precipitation were 905.1mm, 1,977.3mm, 1,554.3mm during study period, respectively. The average annual irrigation amount was 554.5mm, irrigation amount of drought years of '92 and '94 was 604.6mm, 679.2mm, respectively. However, irrigation amount of extended drought year '95 was 384.9mm. It showed that supplying capacity of Jangsung reservoir was limited when consecutive 2 year drought occurred. The main water resources usage of Jangsung reservoir was irrigation, but flood control discharge exceed irrigation amount exceptionally when high precipitation occurred. The reservoir operation record revealed that discharge for river maintenance was delivered even drought years.

  • PDF

Surgical Treatment of "Dumb-bell" Neurosarcoma and Intrathoracic Meningocele Associated with Von Recklinghausen`s Disease -A case report- (신경섬유종증을 동반한 신경성 육종과 흉강내 뇌척수막류의 치험 1례)

  • 최순호
    • Journal of Chest Surgery
    • /
    • v.28 no.10
    • /
    • pp.946-950
    • /
    • 1995
  • Neurosarcoma is relatively rare, but is seen frequently in association with stigmata of neurofibromatosis ie., Cafe au lait pigmentation and cutaneous neurofibromatosis. Both advanced age and association with neurofibromatosis increase the likelihood of malignant degeneration to neurosarcoma. It also may be dumb bell-shaped with intraspinal extension. Thoracic meningocele is rare and represents a protrusion of the dural sac through an abnormally large or malformed intervertebral foramen. The patient is usually asymptomatic, with evidence of paravertebral mass on the chest rentgenogram. In one operation we removed a "Dumb-bell" neurosarcoma and intrathoracic meningocele in a 52 year old woman using a cervical laminectomy with a trap-door incision. She was discharged at 17 days after the operation with a sequelae of excision of nerve roots C8 and T1. Postoperative radiation therapy was performed during the follow-up period.up period.

  • PDF

Asymmetry Components Reduction using Superconducting Fault Current Limiter Operation in Transient Period (비대칭 고장전류 저감을 위한 초전도 한류기 동작 분석)

  • Rhee, Sang-Bong;Kim, Chul-Hwan;Kim, Kyu-Ho;Kim, Jae-Chul;Hyun, Ok-Bae
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.381-382
    • /
    • 2008
  • This paper presents a novel scheme for reducing an asymmetry current with SFCL (Superconducting Fault Current Limiter) operation during transient period, when a fault occurs in power systems. The main idea is installation an auxiliary SFCL with characteristics, which reduces the asymmetry fault current in first half cycle before the operating of main SFCL. For proper activities of SFCLs, the principle of asymmetry current nature is reviewed. A scheme of asymmetry components reduction with SFCL is then explained. The EMTP/ATPDraw model of SFCLs using MODELS language developed and simulated to verify the performance and effectiveness.

  • PDF

Study on payback period analysis of an ESS application (ESS 적용에 따른 원금회수 기간 분석에 관한 연구)

  • Chai, Hui-Seok;Kang, Byoung-Wook;Hong, Jong-Seok;Moon, Jong-Fil;Kim, Jae-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.611-612
    • /
    • 2015
  • Prediction algorithm of the energy storage system in accordance with the load pattern can cause economic loss in case of a failure prediction. In this paper, we compare the electricity charge between industrial power system with ESS - this case's operation is based on Non-prediction operation method. - and without ESS. In addition, we derive the payback period.

  • PDF

Simulator for a Micro-Turbine during Start-up by Constant Power Output Motoring Method using Starter (시동기의 정 출력 시동 기법에 의한 마이크로터빈 시동 구간의 운전 시뮬레이터 개발)

  • Rho, Min-Sik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.10
    • /
    • pp.2028-2037
    • /
    • 2009
  • This paper presents the simulator for dynamic modeling of a MT(micro turbine) during start-up period. The simulator is implemented by modeling a dynamic power of main components of a MT including compressor, combustor and turbine. A modeling for a MT under steady state operation can be accurately built from thermodynamics analysis. But dynamic modeling during start-up period is very difficult because efficiency of main components is very low and the designed value has big error and nonlinear characteristics during start-up. In this paper, new method without using thermodynamics analysis during start-up is proposed for the simulator. The power models of main components are derived from analysis of the experimental operation data by test motoring using a electric starter under constant power output. The simulator is developed using MATLAB/Simulink. For constant power output control, sensorless vector inverter is designed and algorithms for starting from stall and method for controling a output power are proposed. The performance of developed simulator is verified by comparing experimental and simulation start-up results.