Inventory investment control policies about equipment operating rate for a two-echelon spare parts distribution system (2계층 수리부속 분배시스템에 대하여 장비 가동률에 따른 재고 투자비 결정)
-
- Proceedings of the Society of Korea Industrial and System Engineering Conference
- /
- 2002.05a
- /
- pp.189-194
- /
- 2002