• 제목/요약/키워드: Onboard signaling system

검색결과 23건 처리시간 0.025초

모델기반 통합 차상신호시스템 개발 (Model-based Development of Integrated Onboard Signaling System)

  • 한재문;김석헌;조용기
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.245-250
    • /
    • 2011
  • ERTMS/ETCS Level 1 ATP, ATC and ATS are Signaling Systems adopted in korea. For operating in three different trackside signaling systems, train must have individual onboard signaling systems, ATP, ATC and ATS. Three signaling systems in one train is the main cause to increase installation and maintenance cost. Also it is need more effort to change a onboard signaling system depend on the trackside signaling system. those things should lead to decrease efficiency of the onboard signaling system. one integrated onboard signaling system for ATP, ATC and ATS is the good solution for those problems. IOSS is an integrated Onboard Signaling System and still developing. In this paper, we introduce the methodology of model-based development of IOSS. IOSS has one superviser process and several functional blocks to process individual signaling system s. Rhapsody which is CASE tool is used to construct the structure and develop the software for IOSS.

  • PDF

차세대 고속철도 통합 차상신호시스템 구조에 대한 고찰 (A study on the integrated onboard signaling system for the next-generation high-speed rail)

  • 방융;김형훈;윤영환;조신영;조용기
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집 특별세미나,특별/일반세션
    • /
    • pp.631-637
    • /
    • 2009
  • The railway signaling systems operated in Korea are ATS system, ATP system for the low speed line and ATC system for the high speed line. The integrated onboard signaling system for the next-generation high-speed rail is progressed as the need for reducing a driver's load and controlling a train properly with the automatic translation of the onboard signaling system according to a trackside signaling system. In this paper the configuration of the integrated onboard signaling system and the interfaces of the subsystems is presented.

  • PDF

Distance to Go System에서 속도제한 구간 진입 시 속도준수를 위한 제동제어 시점에 관한연구 (A Study on the Brake Regulation Point to Obey Velocity Limits for Entering Speed Restriction Regions in the Distance to Go System)

  • 김태규;이종우
    • 한국철도학회논문집
    • /
    • 제18권5호
    • /
    • pp.426-438
    • /
    • 2015
  • 철도에서 신호 장치는 지상신호 장치에서 차상신호 장치로 전환되고 있다. 기관사들은 현재까지의 지상신호 장치나 과거의 차상신호 장치의 경우 차내 신호에 현재속도보다 낮은 속도가 현시되거나 운행선로의 속도가 낮아질 경우 선로변 표지를 기준으로 제동제어 시점을 결정하였다. 그러나 최근 도입된 차상신호 시스템에서는 선로변 표지를 참고하지 못하고 차상신호 현시 값에 의해, 적정 제동시점을 찾기 어려웠다. 본 논문에서는 최근에 철도에서 사용되어지는 차상신호 시스템에서 기관사들의 제동제어 시점 및 방법을 연구하여 신호 system의 제동제어 감속도를 simulation하여 최적 제동제어 시점을 설정하고 그 점을 중심으로 가우시안 분포(Gaussian Distribution)를 이용하여 제동거리의 오차 범위가 안전거리 내에 있음을 증명하고 평가하였다.

통합 열차제어 신호시스템을 위한 단일 레이아웃의 ERTMS 기반 DMI 화면의 설계 및 구현 (DMI Display implemented as single layout based on ERTMS specification for Integrated Onboard Signaling System)

  • 정지찬;김형훈;조용기
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.251-254
    • /
    • 2011
  • This paper describes the design and implementation of the DMI display based on ERTMS specification for the Integrated Onboard Signaling System (IOSS). IOSS is consists of ATS, ATC, and ATP based on ERTMS/ETCS Level 1. We propose an improved DMI display design which has single layout concept for the IOSS. When a train is in the ATS, ATC, or ATP railway section, it is protected by the ATS, ATC, or ATP equipment, respectively. Therefore, DMI should display the different information according to the each signaling system. We design DMI display implemented as single layout for ATP, ATS and ATC information. This single layout display has a well integrated look and feel using the ERTMS specification and layout. This is for the driver to perceive the information easily and not to experience inconvenience resulting from the sense of difference when the train crossed into the different signaling section. Finally, we show the implementation result following this concept.

  • PDF

차상 신호시스템 국산화 개발 및 적용 (The localization development and application of onboard signaling system)

  • 김경식;강덕원;이종성;박종천
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.1227-1232
    • /
    • 2004
  • This on-board signaling system has been designed with a priority on safety. The system has been devised for both safety, and also the efficiency of train operation. The Importance of signaling system is gradually being recognized with the continuous rise of operating speed and transporting density. Until now, the adaptation of signaling system was totally dependent on foreign signaling companies, as it was difficult to be accessed by domestic technology. But, successful commercial operation of the ATC/ATO system, which is adopted in the development of Kwangju Line No.1, heralds the use of domestic technology, which will be the basis of all future domestic signaling systems.

  • PDF

한국형 틸팅열차 차상신호장치 신뢰성관리에 대한 연구 (A Study on the Reliability Management of Onboard Signaling Equipment for the Korean Tilting Train)

  • 신덕호;백종현;이강미;김용규
    • 한국철도학회논문집
    • /
    • 제12권6호
    • /
    • pp.852-858
    • /
    • 2009
  • 본 논문은 기존선을 고속으로 운행하기 위해 개발된 한국형 틸팅열차 차상신호장치의 신뢰성관리방안에 대한 연구이다. 기존선 자동열차방호(ATP) 및 자동열차정지(ATS)구간을 운행하는 틸팅열차의 안전한 운행을 위해, 선행 열차위치 및 선로환경에 따라 부여된 이동권한 및 제한속도를 기준으로 제동곡선을 생성하여 기관사 실수 및 장애로부터 열차의 안전을 확보하는 차상신호장치의 신뢰성관리방안을 제시한다. 또한 제시된 방안을 기준으로 열차제어시스템의 신뢰도를 예측하고, 검증하는 방안을 국제규격인 IEC 62278(EN 50126)을 기준으로 수행한 사례를 제시한다.

기존선 속도향상을 위한 ETCS Level 1 구축방안 연구 (A study of eatablishing ETCS Level 1 to speed up conventional lines)

  • 윤용기;정락교;김채덕
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.666-670
    • /
    • 2011
  • ATS(Automatic Train Stop)s are is effected by track environment, signal distance and train braking distance. So onboard signaling systems such as ATP(Automatic Train Protection) are installed on conventional lines by some train operation companies. With the mixed signalling, the onboard signaling system is overlaid on a conventional line with ATS, it is possible to run the line with conventional trains and ATP trains and to use the advantages of ATP(higher speed or more trains on the line). This paper includes guidelines a mixed signalling(ETCS and ATS) system architecture, operation concepts and infill balise installation.

  • PDF

KTX 안전장치의 운영 최적화에 관한 연구 (차상신호 및 속도계장치를 중심으로) (A Study on the Operating Optimum of Safety System in KTX)

  • 유병관;김대식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1922-1929
    • /
    • 2008
  • In order to install ATP system for KTX safety running, a study has been done to examine measures to ensure the interface between KTX and ATP system. Although onboard signaling system is efficient and has been verified both at home and abroad, alternatives for optimum installation shall be adopted so as to show designated performance taking into account the given peripheral device. A solution to interface between beacon and onboard system shall be presented especially for the KTX, which runs on both high speed and conventional line (ATP-ATS). Furthermore, the method for controlling the braking process and recorder shall be studied.

  • PDF

철도신호제어용 소프트웨어 신뢰도 모델링에 관한 연구 (A Study on the Reliability of Software for Railway Signalling Systems)

  • 이재호;박영수
    • 한국철도학회논문집
    • /
    • 제9권5호
    • /
    • pp.601-605
    • /
    • 2006
  • Reliability of the Railway signaling system which is safety critical is determined by reliability of hardware and software. Reliability of hardware is easily predicted and demonstrated through lots of different studies and environmental tests, while that of software is estimated by the iterative test outcomes so estimates of reliability will depend on the inputs. Combinations of inputs to and outputs from the software may be mostly combinatoric and therefore all the combinations could not be tested. As a result, it has been more important to calculate reliability by means of a simpler method. This paper identifies the reliability prediction equation applicable to reliability prediction for railway signaling system software, and performs the simulation of onboard equipment of automatic train control for high speed train to review reliability prediction and validity.