• Title/Summary/Keyword: On-site Field Engineer

Search Result 19, Processing Time 0.021 seconds

A Basic Study of Crane Trajectory Distance Calculation for Sustainable PC Members Erection of Large Logistic Building (대형물류센터 PC부재 양중을 위한 크레인 궤적거리 산정 기초 연구)

  • Lim, Jeeyoung;Oh, Jinhyuk;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.77-78
    • /
    • 2023
  • As large logistics buildings have high floor heights and long spans, these buildings are designed as PC structures, and large cranes are used to lift PC members. PC erection planning can generally cause errors depending on the field engineer's experience. To solve this problem, a basic analysis method is needed to establish a systematic PC member erection plan. Crane work can be minimized if the trajectory is easily and quickly calculated according to the location of the crane and applied to the site. Therefore, the objective of this study is a basic study of crane trajectory distance calculation for sustainable PC members erection of large logistic building. In this study, a crawler crane commonly used for lifting PC members is limited. The trajectory distance for the PC erection plan was automatically calculated using the algorithm.

  • PDF

The design of 111m high steel towers with 220kv double circuits crossing 12 km wide Bangladesh River (230KV 2회선승 111M 높이 철탑설계 (I) (강폭 12km인 Bangladesh Jamana강 횡단용))

  • 이재숙
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.4
    • /
    • pp.12-24
    • /
    • 1982
  • East Parts of Bangladesh have been benifited by low cost energy generated by domestic natural gas but West parts where energy generated by imported fuel. Bangladesh Government authority has very much concerned to transmit the low cost electricity to the West from the East for past several years. To solve such concerns, cross-country 230kv double circuits Power transmission line was proposed, however there was a big obstacle for the realization of this line to cross the Jamuna river which has 12 km long width with a deep muddy river bed. A consultant engineering firm named Merz-Mclellan anyway finalized this plan and a world-wide bid was announced on June 31, 1979. Due to the expected difficulty to construct the towers on sea like area, only three construction groups have participated. including a Korean joint venture organization of Samsung-Korean Developement corporation-Kolon Electric Machinery company. After 3 months bid evaluation, contract was awarded to Korean Consosium and KEM Co was in charge of designing steel towers with anchor bolts and base plates beside to electrical engineering field. Then KEM Co have faced and over-comed many unenpected technical difficulties such as forced eccentricity joint on base plate, distorsion issue of 60mm thick plates welding, threading anchor bolts, tad heat treatment of some anchor bolts, disagreement from Consultant Engineer on multiplying factor of leg stresses for 45$^{\circ}$ wind and on reducing O.L.F for wind loads on cables for such 1220km long spans. After spending two years long period for designing and engineering towers, base plates, and anchor bolts, first shipment of tower was finally realized on Nov. 8, 1981 and on the other hand KDD has proceeded concrete caisson work on schedule at Jamuna river site and expected to complete tower erection and stringing of cables within this year of 1982 which was original completion target.

  • PDF

A Study on the Evaluation Method of National Technical Qualification for Soil Environment Based on NCS (NCS 기반 토양환경분야 국가기술자격 실기시험 평가방법에 관한 연구)

  • Lee, Jeong-Kyu;Phae, Chae-gun
    • Journal of Soil and Groundwater Environment
    • /
    • v.22 no.5
    • /
    • pp.98-104
    • /
    • 2017
  • Human Resources Development of Korea has been practicing performance evaluation for occupational qualification licences in environmental sectors that include water, air, and wastes management, but not soil. The purpose of the study was to improve overall quality of the national qualification test in the soil sector to better train applicants based on National Competency Standards (NCS), which is designed to emphasize site-specific conditions and knowledge. This study systematically analysed the current licence test in the soil sector with respect to qualification units, performance criteria, knowledge, techniques, and attitude as described in NCS. Furthermore, test evaluation was conducted to examine the validity of the revised licence test. The test results indicated the revised test method would bring positive outcomes to the related industry. Upon the reviews and amendments by the field experts, the result of this study could serve as a framework to the development of more robust and reliable licence test.

A study on the performance-based design methodology for tunnels through case study on the tunnel built by the prescribed design (사양중심의 터널 설계 사례 연구를 통한 성능기반 터널 설계 방안에 관한 고찰)

  • Hur, Jin-Suk;Kim, Seung-Ryull;Hwang, Je-Don;Seo, Young-Wook;Jung, Myung-Keun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.4
    • /
    • pp.415-429
    • /
    • 2013
  • Performance-based design is becoming a key word for structure design in architectural and civil engineering spheres. In this paper, the need of the performance-based design, especially for tunnels, was enhanced by case study on the largely deformed cut-and-cover arch tunnel built by the prescribed design. In addition, this paper introduces effective method of subdivision on tunnel performance to help field engineer's comprehension. Case study dealing with the issue of typical backwards problem in geotechnical engineering was examined. First of all, the outline of the damaged culvert as well as the surrounding embankment is in detail described. The background, together with the cause of damage, is discussed based on the results of site investigation. Secondly, it was attempted to elucidate the deformation mechanism of the embankment by means of numerical analysis, and the countermeasures are proposed. Finally, the stability of the embankment with the countermeasures was evaluated.

The Investigation and Analysis of Field Condition on the Electrical Shock Hazard of Electrical Facilities Used for Temporary Power Supply at Construction Site (임시전력 건설현장에 사용되는 전기설비의 감전위험에 관한 현장실태 조사 및 분석)

  • Gil, Hyoung-Jun;Lee, Bok-Hee
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.6
    • /
    • pp.197-204
    • /
    • 2004
  • The temporary power installations are to be used for temporarily supplying power during work at construction sites and have a minimum of protective devices to differ from permanent installations. There are many risk factors caused by loose working environments, deterioration of installations at construction sites. To analyze risk factors of temporary power installations, the investigation and the questionnaire were carried out side by side for power receiving system patch and panel boards, and were performed by researcher, the related expert, engineer of Korea Electrical Safety Corporation all over the country. The objects were variable such as an airport, an apartment, a municipal playground As a result, there are many problems such as a bad lock, poor protection of charging department. Solvable methods are improvement of the related regulation safety education, safety check and so on. In the future, the analytical data can be applied to prevent the electrical shock at construction site, and can be used to stabilize electrical installations.

Path Analysis of Factors Limiting Crop Yield in Rice Paddy and Upland Corn Fields (벼와 옥수수 재배 포장에서 경로분석을 이용한 작물 수확량 제한요인 분석)

  • Chung S. O.;Sudduth K. A.;Chang Y. C.
    • Journal of Biosystems Engineering
    • /
    • v.30 no.1 s.108
    • /
    • pp.45-55
    • /
    • 2005
  • Knowledge of the relationship between crop yield and yield-limiting factors is essential for precision farming. However, developing this knowledge is not easy because these yield-limiting factors are interrelated and affect crop yield in different ways. In this study, data for grain yield and yield-limiting factors, including crop chlorophyll content, soil chemical properties, and topography were collected for a small (0.3 ha) rice paddy field in Korea and a large (36 ha) upland corn field in the USA, and relationships were investigated with path analysis. Using this approach, the effects of limiting factors on crop yield could be separated into direct effects and indirect effects acting through other factors. Path analysis provided more insight into these complex relationships than did simple correlation or multiple linear regression analysis. Results of correlation analysis for the rice paddy field showed that EC, Ca, and $SiO_2$ had significant (P<0.1) correlations with rice yield, while pH, Ca, Mg, Na, $SiO_2,\;and\;P_2O_5$ had significant correlations with the SPAD chlorophyll reading. Path analysis provided additional information about the importance and contribution paths of soil variables to rice yield and growth. Ca had the highest direct effect (0.52) and indirect effect via Mg (-0.37) on rice yield. The indirect effect of Mg through Ca (0.51) was higher than the direct effect (-0.38). Path analysis also enabled more appropriate selection of important factors limiting crop yield by considering cause-and-effect relationships among predictor and response variables. For example, although pH showed a positive correlation (r=0.35) with SPAD readings, the correlation was mainly due to the indirect positive effects acting through Mg and $SiO_2$, while pH not only showed negative direct effects, but also negatively impacted indirect effects of other variables on SPAD readings. For the large upland Missouri corn field, two topographic factors, elevation and slope, had significant (P<0.1) direct effects on yield and highly significant (P<0.01) correlations with other limiting factors. Based on the correlation analysis alone, P and K were determined to be nutrients that would increase corn yield for this field. With the help of path analysis, however, increases in Mg could also be expected to increase corn yield in this case. In general, path analysis results were consistent with published optimum ranges of nutrients for rice and com production. We conclude that path analysis can be a useful tool to investigate interrelationships between crop yield and yield limiting factors on a site-specific basis.

Geological Discussion of Monolithic Rock Slide on the Slope of Mt. Seunghag, Dangridong, Busan (부산직할시 승학산 단일암괴 사태사고의 환경지질학적 고찰)

  • 김항묵
    • Journal of the Korean Professional Engineers Association
    • /
    • v.17 no.3
    • /
    • pp.6-21
    • /
    • 1984
  • A rock slide in amount of 100 tons in weight happened at 7: 10 a.m., 4th October 1982, on the southwestern ridge of Mt. Seunghag, Busan City. The original rock mass of the rock slide is located 850m west from the Dangri Crushed Stone Quarry. The geology of the area consists of agglomerate, andesite, andesitic tuff, and shale hornfels of the Cretaceous Yucheon Group. The rock blocks were first shifted along the steep joint plane on an andesite outcrop at the site and then to the eastern foot of the mountain slope where some private houses are placed. The mountain slope is covered with thick superficial soil. A slided monolithic-block with 83 tons in weight from the rock slide met with an accident of striking against a house with a tremendous force, to which much damage was done as much as its half was destroyed. The rock-slided block pierced the board-floored room only posited at the center and by the bedroom of the house making a pass like a bullet hole, and hence cut a big pine tree with 24 centimeters in diameter at a distance of 26 meters down the house. However nobody was killed or injured in the stricken house, though seven family members were stayed therein at the very time of accident. They really met a rare opportunity in an unhappy disaster. Measurements of the rock slide were made in the course of the field survey. The monolithic mass was transported by way of saltation, rolling, and sliding to a distance of 300 meters down along the slope dipping 30$^{\circ}$ east. It took about 16 seconds front tile outcrop to the terminal. The acceleration value of the monolithic rock slide is 2.35m/sec$^2$.

  • PDF

Technique to Evaluate Safety and Loaded Heavy Equipment Grade in RC Building during Demolition Work (RC건축물 해체공사의 안전성 평가기법 및 탑재장비 등급 제안)

  • Park, Seong-Sik;Lee, Bum-Sik;Kim, Hyo-Jin;Sohn, Chang-Hak
    • Land and Housing Review
    • /
    • v.2 no.2
    • /
    • pp.195-204
    • /
    • 2011
  • During mechanical demolition of RC structures, weights of dismantling equipment and demolition waste of building are applied to unexpected load which did not be considered during the design of structural member. Nevertheless, the loading of dismantling equipment and dismantling process are mainly dependent on field managers' field workers' or experiences without considering safety of structural member by a structural engineer. It is urgently required that reflecting actual circumstance of mechanical demolition, safety evaluation method to evaluate the safety and the guideline for appropriate capacity of structural member to support dismantling equipment weight, be provided. Through site investigation and questionnaire on field workers, this paper proposed demolition waste load, load factor, strength reduction factor, and so on. These are essential to safe evaluation of a building, ready to demolition. Considering actual circumstance of mechanical demolition, safety evaluation method of building and design method of slab and beam was suggested to a dilapidated building. An capability to loading of dismantling equipment was proposed, applied to RC slab and RC beam. Therefore, the suggested safety evaluation method and the guideline for an capability to loading of dismantling equipment weight can reasonably evaluate the capacity of structural member in demolition and use effectively as increasing efficiency and improving safety of demolition through proper management of dismantling equipments.

A Study on the Selection Method of Foundation Type in the Underground Parking Lot of Apartments (공동주택 지하 주차장 기초형식 선정방법에 관한 연구)

  • Im, Nam-Gi;Lee, Yeong-Do;Bae, Yong-Hwan
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.3
    • /
    • pp.109-116
    • /
    • 2004
  • Normally easy task of plat in urban architecture is that using underground full of activities for increase building site efficiency. Especially for using underground space for the parking lot. Also utilize underground is more increase for fulfill requirement in modern society considered with environmental friendly architecture. The primary objective of this study is to apply analyzed formal foundation type for selecting the optimum type of parking lots considered with structural stability, economical efficiency, construction efficiency, construction duration. This study aim to on criteria decided through the questionaries for the selection considered with in the scale of second stories parking lots underground, parking volume is 80 and reinforced concrete structure. The bearing capacity is 6~8m and downward from surface, healthy ground bearing capacity is 40 t/m2. This study comparative analysis and discuss economical efficiency, construction efficiency, construction duration based constructivist stability which applied Single foundation, Mat foundation, Drop Mat foundation. The result of this study is as follows: First, the result of economical efficiency is that on the basis of single foundation, Drop Mat foundation is 1.88, Mat foundation 2.04 as a comparative analysis on the basis of total construction cost included material cost, labor coast and machinery cost. Second, the result of construction efficiency order is single foundation, Drop Mat foundation, Mat foundation as a comparative analysis on the based connected characteristics. Third, the result of construction duration is that on the basis of Mat Foundation, Drop Mat foundation is 1.33, single foundation is 1.87 as a comparative analysis Critical Path. Forth, Each foundational type characteristics order through the matrix method is that overall each formal type of foundation contraries at economical efficiency and construction efficiency, construction duration. Also expect contradiction between engineers and owners due to engineer pursuit construction duration and ewer to begin with economical efficiency. Fifth, The selection of suitable foundation formal type needs that based consider project characteristic and field condition as according to above result of a comparative analysis. As a result, a comparative analysis economical efficiency, construction efficiency, construction duration of Mat foundation, Drop Mat foundation, single foundation with 3Bay reinforced structure underground parking lots on the healthy ground.