• Title/Summary/Keyword: On-site Field Engineer

Search Result 19, Processing Time 0.023 seconds

Deployment of Appropriate Architectural Construction Engineers to Solve Quality and Safety Problems at Construction Sites (건설현장의 품질·안전문제 해결을 위한 적정 건축시공기술자의 배치 관련 연구)

  • Kim, Hyunjun;Kim, Jin-Dong;Shin, Yoonseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.15-23
    • /
    • 2024
  • Recently, quality problems, such as the collapse of apartment structures under construction, has emerged as a social issue. Although there are various causes of quality problem and the impact of each problem may be different, the problems from the perspective of construction engineer of construction company are investigated. Therefore, this study aim to investigate the adequacy of construction engineer's experience, number of field engineer, timing of engineer deployment at construction sites, etc. in order to resolve quality and safety problems. In this study, a questionnaire survey was conducted targeting construction managers to obtain objective opinions. The results showed that the number of construction engineers in construction companies should be increased and that intermediate construction engineers should be increased to enable practical site management for resolving quality and safety problems. In addition, it was found that there was a need to reduce the number of non-regular employed field construction engineers in construction site and at the same time systematically regulate the number of on-site construction engineers, similar to safety managers and quality managers.

Site Investigations for Design Parameter Determination (설계정수 산정을 위한 지반조사)

  • Cho, Wan-Jei
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.785-789
    • /
    • 2009
  • It is essential to carry out appropriate site investigations for the accurate prediction of the geo-structure. However, the importance of the site investigation is often overlooked due to the time and expense constraints. In this study, several cases of geotechnical design perfromed in United States are introduced with the lessons about how the site investigations are planned, performed and applied for the actual design parameter determination. Based on the case studies presented herein, experienced geotechnical engineer should participate in site investigations from the planning stage through the final boring logs and utilize all the laboratory and field tests to have consistent input parameters for the soil constitutive models. Furthermore, it is also desired to have close relationship between construction industry and the academia to compensate their needs.

  • PDF

A study on exposed aggrigate P.C. in field plant cast - case study for core building, VOTRAKON project - (골재노출 P.C제품의 현지생산에 관한 소고 -보트라콘 프로젝트의 코아빌딩을 중심으로-)

  • 이학영
    • Journal of the Korean Professional Engineers Association
    • /
    • v.19 no.2
    • /
    • pp.34-42
    • /
    • 1986
  • These brief studies and reports of the use of exposed aggrigate precast concrete in practice are combined with a description of some notable co-ordination such as shop drawing, manufacturing and erection in the field construction. Above mentioned exposed aggrigate P. C. means architectural P. C. which was used to the VOTRAKON site in Riyadh, Saudi Arabia. Fabricated P. C. on the site without autoclaving and steam curing plant had been successfully carried out on this project-core building, conference room and others. The project designed by HOPE/VTN international INC. which is located in San Diego, California U.S.A. stands for vocational training and related support facilities contract. We had to submit shop drawings showing complete information for fabrication and installation of P. C. unit reinforcement. Also we should be indicated member dimension and cross section, location size and type of necessary for erection. We can delineate the following characteristic results. One of the most important things how to handle exposed aggrigate P.C. unit as specified was quality assurance and co-ordination for shop drawing, manufacturing and erection.

  • PDF

The Inspection system development & Field experiments on performance evaluation for O & M RBF (기술사마당_기술자료 - 하상여과공법의 유지관리를 위한 조사장치 개발 및 현장 성능평가)

  • Oh, Ki-Sik;Cho, Tae-Ho
    • Journal of the Korean Professional Engineers Association
    • /
    • v.43 no.2
    • /
    • pp.53-59
    • /
    • 2010
  • This research is about the inspection system which is for maintenance of laterals of local RBF(River bed Filtration). Inspection system is designed for local use in order to endure water resistance up to 50m and it also can examine the internal condition and colgging of laterals by moving inside of the laterals about 100m back and forward. We will conduct performance test of inspection system at the lacal RBF site and present its result.

  • PDF

Database Development For Efficient Construction Process Management Using Construction Simulation Technique and Bayesian Approach (건설 시뮬레이션과 베이시안 기법을 이용한 공정관리 데이터베이스 구축)

  • Ko, Yong-Ho;Park, Min-Ha;Han, SeungWoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.94-95
    • /
    • 2014
  • Construction industry has become higher, larger and more complicated. It has been analyzed that the process planning in the construction site has been made by the site engineer experience mostly and some were made based on historical data. However, such plans have been investigated that require numerous revisions during construction which means that the plans made through such methods are not reliable. Numerous studies in this field have been conducted trying to solve such problems developing methodologies to overcome such limitations. It has been analyzed that many studies have focused on suggesting prediction models only that cannot be used for both actual planning prior to construction and process monitoring during construction. Therefore, this study suggests a methodology that effectively manages construction productivity by applying simulation methodology combined with bayesian approach focusing on the high-rise curtain wall operations.

  • PDF

Productivity management methodology development using Bayesian Approach (베이시안 접근법을 이용한 생산성 관리 방안 제시)

  • Ko, Yong-Ho;Lee, Tae-Hee;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.21-22
    • /
    • 2013
  • Construction industry has become higher, larger and more complicated. Construction projects demand precise planning and management prior and during actual operation. However, it has been analyzed that the process planning in the construction site has been made by the site engineer experience mostly that usually results in unreliable results. Numerous studies in this field have been conducted trying to solve such problems developing methodologies to suggest quantitative results. It has been analyzed that many studies have focused on limited data only and neglected suggesting an appropriate methodology for changing data applications. Therefore, this study suggests a methodology that effectively manages construction productivity by applying bayesian approach focusing on the high-rise curtain wall operations.

  • PDF

Study on the Impact Coefficient of the Lifting System (조금구의 충격계수에 관한 연구)

  • 하대환
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.3
    • /
    • pp.64-67
    • /
    • 2001
  • In resent the weight of structure is heavier and bigger than before. Engineers use many heavy equipments to erect buildings and bridges. The heavy equipment is very useful to lift any weight. But most engineers do not know the impact of the weight when the equipment lifts the weight. In this study one researched into the impact of the weight in the crane work which lifts the weight in the construction site. Also along the number of pulley sheave the impact of the weight was researched. From the impact field test the impact coefficient of a single pulley sheave crane was 0.65 and the four pulley sheaves crane was 0.13. The result shows that the impact coefficient of a single pulley crane is more than 5 time of the impact coefficient of the four pulley sheaves crane and that engineers must consider the impact effect of the crane work in the construction site.

  • PDF

Evaluation of Degree of Compaction of Railroad Trackbed Fills Using Elastic Wave Velocities (탄성파 속도를 이용한 철도 토공노반의 다짐도 평가)

  • Kim, Hak-Sung;Jung, Young-Hoon;Gang, Dong-Yeob;Lee, Seong-Hyeok
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1650-1658
    • /
    • 2011
  • The quality control of compaction fills has been commonly performed via the field density measurement and plate load tests. However, the engineer frequently encounters difficulties in actually controling the quality due to the uncertainty in the field density measurement as well as the plate load tests. To overcome these difficulties, Park et al. (2009) proposed an alternative quality control method based on the measurement of the compressive wave velocities. In this study, the compressive wave velocities measured in the full-scale model test site were analyzed. Direct arrive seismic tests were performed after the completion of each trackbed layer. To identify a relationship between elastic wave velocities and degree of compaction, laboratory compaction tests were conducted.

  • PDF

An Experimental Study on Bond Strength of Corroded Bars Before and After Placement (콘크리트 타설 전과 후에 부식된 이형철근의 부착강도에 대한 실험적 연구)

  • Kim, Dae-Il;Chung, Lan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10a
    • /
    • pp.705-710
    • /
    • 2000
  • Recently, use of sea-sand as fine aggregates in reinforced concrete structures is increasing because of lacking of supply due to destructive of environment caused by obtaining and exhausting of resource. It rise up issue, some field reconstruction, interrupted construction works occurring to the trouble on the site because sometimes engineer does not agree to use of corroded bar, even slighly corroded. This study investigates the properties of bond strength and the structural behavior of corroded bars before and after placement. The purpose of the study is to present the database estimating degree of damaged bond strength according to corrosion level and deciding on whether using corroded bars or not.

  • PDF

A Study on the Damage and Problem of Domestic Animals by Noise and Vibration at Construction Site (건설소음진동으로 인한 가축피해현황 및 문제요인고찰)

  • 박찬헌
    • Journal of the Korean Professional Engineers Association
    • /
    • v.33 no.3
    • /
    • pp.30-34
    • /
    • 2000
  • In recent years, disputes are on the increase that noise and vibration by construction equipments and blasting do damage to livestock farming families around construction sites in the construction of a road or a railway. Therefore, the following ways of improvement were presented in solving the existing problems of livestock disputes. $.$ To minimize the damage of livestock farming families by effect assessment of noise and vibration in the region expected to be damaged before the start of construction $.$ To maintain a thorough management system that can reduce noise and vibration during construction work $.$ To apply an adequate measurement method of noise and vibration taking field conditions into consideration

  • PDF