• 제목/요약/키워드: On-Site Process

검색결과 2,484건 처리시간 0.031초

Opportunities for construction site monitoring by adopting first personal view (FPV) of a drone

  • Kim, Seungho;Kim, Sangyong
    • Smart Structures and Systems
    • /
    • 제21권2호
    • /
    • pp.139-149
    • /
    • 2018
  • Understanding the current status of a construction project is necessary to achieve successful on-site management. Real-time information delivery is a major concern for construction industry practitioners in order to expedite decisions and discussions. We propose the use of a first personal view (FPV) system of a quadcopter drone as a tool for monitoring on-site status and communicating between construction participants. The most important function of the drone FPV system is its ability to visually monitor construction site situations in real time. An on-site management system process is developed, verified, and applied to several construction work tasks after determining factors that affect efficient construction management. The proposed system is expected to assist the construction manager in achieving high efficiency.

실무 3D 스캐닝 및 BIM 활용을 위한 발주자 - 실무자 간 협업프로세스 모델 (A collaborative process between employers and practitioners for utilization of BIM and 3D scanning)

  • 김도영
    • 한국BIM학회 논문집
    • /
    • 제11권2호
    • /
    • pp.33-42
    • /
    • 2021
  • In construction sites, policies are changing considering the convergence of 3D scanning and BIM. In order to respond to this, it is urgent to develop guidelines for systematic collaboration methods that take into account the perspectives of practitioners. By participating in the delivery process using 3D scanning technology, tasks such as ordering, field scanning are defined in terms of mutual communications. Also, the collaboration process is about communications between off-site and on-site, such as feed-back using data and documents. In the future, we will propose guidelines based on such collaborative process models.

국내 건설 현장관리업무의 개선방안에 관한 연구 (A study on the Improvement Plan of Construction Site Management In Korea)

  • 김진호
    • 한국건축시공학회지
    • /
    • 제2권4호
    • /
    • pp.137-144
    • /
    • 2002
  • In the modern age. Building is getting higher and larger according to owner and social demands. Now when we are facing the need of the cost down and the reduction of economic loss. In this paper, the characteristics of the present conditions of site management were investigated with the field survey. And The Purpose of this study is to suggest the rational plans of construction planning in site management. The method of site management. however depends on experience of a construction manager. in order to solve this situation, it is necessary to create a method of site management that is adequate for the condition of construction. By cultivating excellent sub contractors, we can expect precise construction with a few experts. improvement in qualify of construction from standardization, computerization of each process. And the expectancies of this paper are that it can be used as efficient data for improvement of system to systematize site management work in Korea.

사용자(使用者) 참여(參與)에 의한 주거단지(住居團地) 건축(建築)에 대(對)한 조사(調査) 연구(硏究) (A Study on the Housing Development Building by User's Participation)

  • 오영식;최효승
    • 한국농촌건축학회논문집
    • /
    • 제4권1호
    • /
    • pp.37-44
    • /
    • 2002
  • There are some studies about user's participation to reflect their desire and value on the planning of house by this time. These were constitution of unit space focused on the apartments, which is mostly theoretical. However, till completion of a construction work, it goes through various processes of some steps such as, buying building site, site planning, architectural planning and construction. In architectural planning process, it takes time for continuous discussion and revision between architects and users. Also changes of plan must of necessity be so because of in or outside conditions. So, right user's participation has its meaning that they take part in each step and portion of process faithfully on whole architectural processes. In this case, tenants of single house were decided and they already buy building site and lay out rules jointly. With this circumstance I've researched a kind of test the reflection on various desires and its acceptance in each steps through completion of a construction work, which is based on their participation.

  • PDF

안티 사이트에서의 소비자 신뢰, 소비자만족 및 재방문의사에 대한 분석 (An analysis of consumers자 reliability and satisfaction for anti-site and willingness to revisit it)

  • 허경옥
    • 가족자원경영과 정책
    • /
    • 제7권1호
    • /
    • pp.77-89
    • /
    • 2003
  • This study examines factors to influence consumers’reliability, and satisfactions for consumer anti-site, and willingness to visit that site again among consumers utilizing anti-sites. According to the results of this study, first, male, consumers utilizing electronic commerce were more likely to visit anti-site. Consumers were more likely to write their own message and reply other consumers’message in anti-site when they have purpose to complain about their dissatisfaction regarding the process of purchase behavior. Second, consumer's satisfaction is higher in cases of consumers having higher recognition of necessity of anti-site, visiting not required to affiliate the members of anti-site, and being reliable sites. Third, consumers were more likely to use anti-site again when they had higher recognition in the necessity of anti-site and were more satisfied. Finally, in order to facilitate the utilization of anti-sites, those solutions include systematic classification and management of writings listed in the site, active management of the site managers, solutions for criticisms on the writings listed and lack of objectivity of information provided, and active searches for solutions rather than listing of writings on discontents and resistance.

  • PDF

The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique

  • Chang, SooWon;Yi, June-Seong;Son, JeongWook
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권1호
    • /
    • pp.40-46
    • /
    • 2015
  • This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.

주물공장의 빅데이터 수집을 위한 IoT 기반 디바이스 활용 기술 (IoT-Based Device Utilization Technology for Big Data Collection in Foundry)

  • 김문조;김동응
    • 한국주조공학회지
    • /
    • 제41권6호
    • /
    • pp.550-557
    • /
    • 2021
  • 4차 산업혁명의 도래에 따라 주물공장에서도 사물인터넷(Internet of things, IoT) 기반의 공정 스마트화에 대한 관심이 높아지고 있다. 주물공장에서 자동 수집 되고 있는 공정데이터들도 일부 있으나 노후된 생산설비의 제한된 기능, 작업자 노하우 기반의 공정 설계 등의 이유로 여전히 많은 공정데이터가 수기로 관리되고 있다. 특히, 공정데이터의 빅데이터화에 대한 중요도를 인지함에도 불구하고 시스템 구축 비용 부담으로 인해 선뜻 도입을 어려워하는 기업들이 많다. 본 연구에서는 IoT 기반 디바이스를 제작하고 원심주조공정 현장에 직접 적용함으로써 제작 디바이스의 현장 활용성을 살펴보았다. 원심주조공정에 대해 취득하고자 하는 공정 인자로 작업현장의 온도 및 습도, 용탕 온도, 금형 회전속도를 선정하였다. 데이터 취득 인자별로 요구되는 상세 제품규격과 비용을 고려하여 센서를 선정하였으며, IoT 기반 디바이스 제작을 위해 무선통신이 가능한 NodeMCU 보드를 활용하여 회로를 구성하였다. 구성한 회로는 PCB 기판으로 제작하여 각 공정 인자별 디바이스의 설치 환경을 고려하여 작업 현장에 설치하였으며, 현장 실증을 통해 적용 가능성을 확인하였다. 현장 적용 이후, 작업자의 안전에 대한 만족도가 상승하였으며, 공정 관리 측면에서 효율성이 증가했음이 확인되었다. 더불어 지속적으로 데이터를 수집하면 추후 공정데이터-품질데이터의 연계가 가능할 것으로 기대된다. 본 연구에서 제작한 IoT 디바이스는 데이터 수집에 대한 적절한 신뢰도를 확보하면서도 비용이 저렴하여, 주물공장별로 현장 상황을 고려하여 도입 여부를 검토해볼 수 있을 것으로 생각된다.

블랙 숄즈 모델을 이용한 잠재적 풍력발전 위치의 경제적 가치분석 (The Economic Value Analysis of the Potential Wind Farm Site Using the Black-Scholes Model)

  • 심재훈
    • 산업경영시스템학회지
    • /
    • 제45권4호
    • /
    • pp.21-30
    • /
    • 2022
  • To mitigate the environmental impacts of the energy sector, the government of South Korea has made a continuous effort to facilitate the development and commercialization of renewable energy. As a result, the efficiency of renewable energy plants is not a consideration in the potential site selection process. To contribute to the overall sustainability of this increasingly important sector, this study utilizes the Black-Scholes model to evaluate the economic value of potential sites for off-site wind farms, while analyzing the environmental mitigation of these potential sites in terms of carbon emission reduction. In order to incorporate the importance of flexibility and uncertainty factors in the evaluation process, this study has developed a site evaluation model focused on system dynamics and real option approaches that compares the expected revenue and expected cost during the life cycle of off-site wind farm sites. Using sensitivity analysis, this study further investigates two uncertainty factors (namely, investment cost and wind energy production) on the economic value and carbon emission reduction of potential wind farm locations.

비전 프로세싱 인공지능 기술을 활용한 건설현장 감리 (Improving Construction Site Supervision with Vision Processing AI Technology)

  • 이승빈;박경규;서민조;김시욱;최원준;김치경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.235-236
    • /
    • 2023
  • The process of construction site supervision plays a crucial role in ensuring safety and quality assurance in construction projects. However, traditional methods of supervision largely depend on human vision and individual experience, posing limitations in quickly detecting and preventing all defects. In particular, the thorough supervision of expansive sites is time-consuming and makes it challenging to identify all defects. This study proposes a new construction supervision system that utilizes vision processing technology and Artificial Intelligence(AI) to automatically detect and analyze defects as a solution to these issues. The system we developed is provided in the form of an application that operates on portable devices, designed to a lower technical barrier so that even non-experts can easily aid construction site supervision. The developed system swiftly and accurately identifies various potential defects at the construction site. As such, the introduction of this system is expected to significantly enhance the speed and accuracy of the construction supervision process.

  • PDF

Application of Parameters-Free Adaptive Clonal Selection in Optimization of Construction Site Utilization Planning

  • Wang, Xi;Deshpande, Abhijeet S.;Dadi, Gabriel B.
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권2호
    • /
    • pp.1-10
    • /
    • 2017
  • The Clonal Selection Algorithm (CSA) is an algorithm inspired by the human immune system mechanism. In CSA, several parameters needs to be optimized by large amount of sensitivity analysis for the optimal results. They limit the accuracy of the results due to the uncertainty and subjectivity. Adaptive Clonal Selection (ACS), a modified version of CSA, is developed as an algorithm without controls by pre-defined parameters in terms of selection process and mutation strength. In this paper, we discuss the ACS in detail and present its implementation in construction site utilization planning (CSUP). When applied to a developed model published in research literature, it proves that the ACS are capable of searching the optimal layout of temporary facilities on construction site based on the result of objective function, especially when the parameterization process is considered. Although the ACS still needs some improvements, obtaining a promising result when working on a same case study computed by Genetic Algorithm and Electimze algorithm prove its potential in solving more complex construction optimization problems in the future.