• Title/Summary/Keyword: On-Site Construction

Search Result 3,683, Processing Time 0.029 seconds

A Preliminary Studty on the Efficient Management Manpower Staffing According to the Building Size -Focused on Office Buildings- (건축규모에 따른 관리인력의 효율적 배치에 관한 기초연구 -오피스 건물을 중심으로-)

  • Lee, Won-Suk;Kim, Shin-Eun;Kim, Sun-Kuk;Lee, Dong-Hoon;Won, Il-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.191-194
    • /
    • 2010
  • Construction companies are now trying a variety of cost-cutting strategies in the midst of recent slump of construction market. Notably, contract workers and local hires are accounting for increasing portion of management manpower as a part of their cost-reduction drive. However, construction site manpower researches to date have focused primarily on productivity analysis of site laborers, with little attention to the productivity of site management resources. This study aims to analyze the staffing status of office building construction site management manpower in reference to project size. Conclusions herein will provide basic inputs for subsequent attempts to build a model to enable efficient staffing of construction site management manpower.

  • PDF

ENHANCEMENT OF AVAILABILITY OF 4D SIMULATION BASED ON BUILDING INFORMATION MODEL TECHNOLOGY

  • Jong Jin Park;Eon Yong Kim;Hyun Cho;Han Jong Jun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.579-586
    • /
    • 2009
  • 4D simulation integrates the 3 dimensional model of a building with the construction schedule, and it leads to the possibility of virtually checking the construction process and the building itself in advance. However, the existing problem of 4D simulation is the difference between the demands of architects, engineers, and construction site workers in 4D simulation. This study suggests the possible way to enhance the availability of 4D simulation, considering more the practical demands from the construction site. In order to conduct this study, we build a 3D BIM model of a business-residential complex and link the model with the pre-defined construction schedule in order to make a 4D simulation. This study concludes with the optimized 4D simulation methodology based on BIM model considering the demands in perspective of the construction site. It would contribute to the harmonic collaboration among architects, engineers, and labors in the construction site when using 4D simulation based on BIM model.

  • PDF

Robust Real-time Object Detection on Construction Sites Using Integral Channel Features

  • Kim, Jinwoo;Chi, Seokho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.304-309
    • /
    • 2015
  • On construction sites, it is important to monitor the performance of construction equipment and workers to achieve successful construction project management; especially, vision-based detection methods have advantages for the real-time site data collection for safety and productivity analyses. Although many researchers developed vision-based detection methods with acceptable performance, there are still limitations to be addressed: 1) sensitiveness to the shape and appearance changes of moving objects in difference working postures, and 2) high computation time. To deal with the limitations, this paper proposes a detection algorithm of construction equipment based on Integral Channel Features. For validation, 16,850 frames of video streams were recorded and analyzed. The results showed that the proposed method worked in high performance in terms of accuracy and processing time. In conclusion, the developed method can help to understand useful site information including working pattern, working time and input manpower analyses.

  • PDF

Comparative analysis of fugitive dust management system at construction site by major cities

  • Noh, Hyun Jun;Yu, Jung Ho
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.297-300
    • /
    • 2017
  • Particulate Matter(PM) is one of the most critical pollutant which can cause a fatal disease if the human body inhales. Construction is the business that emits the most fugitive dust. It is therefore necessary to manage construction site. South korea government focuses on the fugitive dust control measures defined in regulation being implemented properly. However the number of civil complaints related to fugitive dust emitted from construction site is the most in korea. So it is necessary to check from the management system aspect. This paper compares and analyzes the fugitive dust management system which applied to the construction site of major cities in three countries, and finds out what needs to be supplemented by the domestic management system.

  • PDF

Contractors' Perception towards Safety and its Consequences on Construction Workers in Cape Coast Metropolis

  • Mustapha, Zakari
    • The Korean Journal of Food & Health Convergence
    • /
    • v.5 no.6
    • /
    • pp.11-16
    • /
    • 2019
  • The construction environment has been declared as a hazard prone area due to high number of accident and death. The study aims to identify influential factors that contribute to poor safety practices and its consequences on construction workers in Cape Coast Metropolis. Seventy respondents were taken as the sample size for the study. Descriptive analysis was used to analyze the data obtained from the field. Findings show that poor site management, working without safety gadgets, failure to use their Personal Protective Equipment (PPE) and negligence of workers were the main causes of accidents on sites. Poor site management had the highest ranking among the seven variables. Effects of poor safety practices on building construction site and delays in work execution were due to injury of workers, extra cost due to payment of compensation to injured victims, not motivated due to injury of worker and declined reputation of firm. Management team should motivate workers for safe work done, provide adequate PPE for their workers on site and have documented health and safety policy on site. Site authorities and management team should be on site regularly to ensure proper safety practices on construction site.

A Study on Development of Remote Site Monitoring System in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구)

  • Ok, Hyun
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.

A Basic Study on Quantification Risk Model of Human Accidents on Exterior Construction Site in South Korea (국내 건설현장 내·외부 인명사고 리스크 정량화 모델 개발 기초연구)

  • Oh, Jun-Seok;Ha, Sun-Geun;Kim, Tae-Hee;Jeon, Sang-Sub;Kim, Ji-Myung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.132-133
    • /
    • 2018
  • Many studies regarding construction safety management have been conducted. However, it is insufficient to research on external construction site. As a result, ordinary people around the construction site have injured and have a negative view when they think construction industrial since it has regarded having an overfull industrial accidents on media. To break the stereotype and prevention of accident on construction industry have been emphasized at this point in time, it is necessary to establish a comprehensive safety management system which is considered not only internal safety management but also external safety management. Therefore, the objective of this study is to develop the human accident risk quantification model by utilizing the third party payout data which occurred by incomplete safety management on external construction site. This study is conducted as a basic study for developing safety management manuals on internal·external construct site. In the future, it is expected to be used as a reference.

  • PDF

Survey on the Occurrence of Fine (Scatter) Dust at the Construction Site and the Effectiveness of Countermeasures (건축공사 현장의 미세(비산)먼지 발생현황과 대책별 효과에 관한 설문조사)

  • Han, Jae Goo;Kim, Young Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.299-300
    • /
    • 2021
  • In this study, a questionnaire survey was conducted on the occurrence of fine dust at the construction site and the effectiveness of countermeasures. Based on the results of the survey, it is intended to be used as basic data for establishing a method to reduce fine dust in construction sites.

  • PDF

A Study on the Technique of Construction Site Management based on UAV and USN (UAV와 USN 기반의 건설현장관리기법 연구)

  • Yeon, Sang-ho
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.1
    • /
    • pp.457-467
    • /
    • 2019
  • In recent years, various methods have been attempted to visually manage the construction site efficiently, and in particular, there has been a tendency to use a UAV or a drone in the air rather than a land on a construction site, Can be visually photographed and recorded or analyzed. In this study, the unmanned aerial photographs were taken at least three times and the USN sensors were simultaneously operated on the main structure at the time of shooting, The goal of this research was to make the image information and environmental information of the construction site available for efficient construction management by matching. As a result, not only professional engineers at construction sites but also administrative managers can visually confirm the detailed situation of the site at the time of the construction site and the completion status, and can help decision making in appropriate budget input and appropriate resource support The experts in each field discussed the safety management of the construction site, the prevention of disaster and various factors of change which can be changed by natural environment factors.

Preliminary study for Vertical Dynamic Site Layout Planning of High-Rise Building Construction (고층공사 가설시설물의 동적수직배치 최적화를 위한 기초연구)

  • Pyo, Kiyoun;Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.39-40
    • /
    • 2018
  • The goal of site layout planning(SLP) is to maximize the productivity and efficiency of the construction by reducing travel distance and material handling cost and manpower. However, SLPs are static layout schemes, which cannot be reorganized during the construction process to correspond with errors, phase transition, changing working environments on the site. To solve this problem, researches on dynamic site layout planning(DSLP) are emerging. This preliminary study clarifies characteristics of temporary facility's variables to develop the vertical DSLP algorithm of high-rise building construction.

  • PDF