• Title/Summary/Keyword: On Line Maintenance

Search Result 629, Processing Time 0.03 seconds

A Study on the Fault analysis of train control system by CAMS (CAMS에 의한 고속선 열차제어시스템 장애 분석에 관한 연구)

  • Kim, Yong-Kyu;Baek, Jong-Hyun;Ryu, Sang-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1436-1441
    • /
    • 2006
  • In this paper, Computer-aided Maintenance Equipments, which are being used in High Speed Line Train Control System, are applied to analyze failures in train control systems, resulting in long time delays of trains. It can be expected to extend and apply CAMS(Computer Aided Maintenance System) in the hereafter efficient operation and maintenance of high speed railway train control systems, by comparison between the analysis result of fundamental causes, from high speed railway train control system failure occurred during the operational process, and predictive result of failure causes, based on the recording data of CAMS when failures were occurred.

  • PDF

Continuous On-line Estimation of Cell Growth and Substrate Consumption Using a Computer-coupled Mass Spectrometer (Computer-coupled Mass Sepctrometer를 이용한 세포증식과 기질소모의 연속적 On-line추정)

  • 남수완;김정희
    • KSBB Journal
    • /
    • v.4 no.2
    • /
    • pp.118-122
    • /
    • 1989
  • From the on-line mass spectrometric analyese of the exhaust gaseous composition of fermentor and the material balance equations for oxygen and carbon dioxide, oxygen uptake rate (OUR) and carbon dioxide evolution rate (CER) were calculate using a personal computer (IBM PC-AT) interfaced to a quadrupole mass spectromter. The calculate OUR and CER were used for the indirect estimation of cell and substrate concentrations during the batch culture of Candida utilis. For the estimation of sustrate concentration, the yield model of Pirt was applied. It was found that the cell and substrate (glucose) concentration could be ssatisfactorily estimataed and the results showed the more accurate estimations of both fermentation state variables when OUR data were used than CER data.

  • PDF

Analysis of Current Collect Performance Depending on Installation Condition of Overhead Contact Line in Suseo High Speed Line (수서고속철도 전차선로의 설치조건의 따른 집전상태 분석)

  • Na, Kyung-min;Park, Young;Lee, Kiwon;Cho, Yong Hyeon;Kwon, Sam-young;Park, Chulmin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.4
    • /
    • pp.727-732
    • /
    • 2017
  • This paper describes the dynamic characteristics depending on installation condition between a pantograph and an OCL (Overhead Contact Line) on a new high speed line in Korea. The current collection performance between the pantograph and the OCL was tested during train operation from Suseo to Jije stations. The current collection performance is evaluated based on the duration of an arc by using an arcing measurement system. The system consists of an optical sensor for measuring the duration of an arc and a camera for monitoring current collection performance. An arcing duration is defined as a percentage of arcing in international standards. This test aims to analyze the locations of repetitive arcing depending on installation conditions of OCLs on a new high speed line in order to use the result as reference data for correct construction and maintenance.

A Case Study of On-line PD Measuring System on the Stator Winding for High Voltage Rotating Machine (고전압회전기 고정자권선 운전중 부분방전진단시스템의 현장적용사례 연구)

  • Oh, Bong-Keun;Kang, Dong-Sik;Lim, Kee-Joe
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2010.06a
    • /
    • pp.109-109
    • /
    • 2010
  • On-line partial discharge(PD) diagnostic system is the most prominent systems to diagnose insulation condition for the high voltage rotating machines. Partial discharge measuring system(PDMS) series with ceramic coupler(PD detecting sensor) installed hydro generator and high voltage motor have been measured the PD data for many years. The trend of PD magnitude in the on-line PD system increased for some machines. These machines showed a same result in the conventional off-line PD test and PD magnitude decreased after stator winding insulation cleaning. This case study show that PDMS has been proved to be good results by comparing PD magnitude with on-line and off-line PD test and it is important to plan the maintenance project for the hydro generator stator winding because PD value was decreased after insulation cleaning.

  • PDF

A New Slab Track System (새로운 슬래브궤도 시스템)

  • 강보순
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.213-218
    • /
    • 2002
  • A new German high speed railway slab track was investigated. The construction objective was to provide a durable and maintenance free track system consisting of precast concretepanels of consistently high quality and highest achievable accuracy in track geometry. The System on the basis of precast panels similar to the slab track system constructed on the line Dachau- Karlsfeld in 1997.

  • PDF

Study on the Appropriateness of Track Maintenance Works through the Evaluation of Trackbed Conditions (도상 및 노반상태 평가를 통한 궤도유지보수작업의 적정성 연구)

  • Kim, Dae-Sang;Kwon, Soon-Sup;Lee, Su-Hyung;Hwang, Seon-Keun;Park, Tae-Soon
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.3
    • /
    • pp.334-341
    • /
    • 2008
  • Ballast track needs maintenance works because it is supported by the compressible trackbed and subgrade layers. Maintenance works are essential to secure riding comfort and extend the life cycle of it. The necessities of maintenance works are determined from track irregularities measured by EM120. Track irregularities is the results of the track deformation. Therefore, it is natural to evaluate the cause of it. This paper focuses on the points the track irregularities come from the trackbed and the subgrade. Nondestructive techniques, such as Ground Penetrating Radar (GPR) and Portable Falling Weight Deflectometer (PFWD) are applied to evaluate the trackbed conditions, ballast layer thickness and vertical track stiffness, in the test section 500m long of Gyungbu line. The trackbed investigation results are compared with the track irregularities measured by EM120 and maintenance works. Conclusively, it was found that some maintenance works were unnecessary on the test section.

A study on energy saving effectiveness of railway electrification using operation data (운영실적을 이용한 철도전철화에 따른 에너지 절감효과 분석)

  • Jung, Ho-Sung;Jang, Dong-Uk;Kwon, Sam-Young;Han, Moon-Seob;Kim, Jin-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.899-904
    • /
    • 2007
  • Improvement projects has been progressed for railway electrification and double track line in the conventional line as well as high speed line for the high speed and large transportation capability of railway. Especially, many variable operation plans are possible such as interaction between high speed line and conventional line and operation of tilting train due to the electrification of the conventional line. Railway electrification is more energy efficient and environmentally-friendly, but it has some problems such as an enormous initial construction and maintenance costs and electrical accidents. Therefore, the more intensive research will be progressed about railway electrification effectiveness for the continuous electrification project. So, we analyzed railway electrification effectiveness about the energy side using annual operation data of electric car and diesel car. The energy side was divided into energy costs and national energy consumption for analyzing electrification effectiveness about entire line and specific line. We verified advantage of energy costs and national energy consumption in this paper and this result will contribute to the progress of the continuous electrification project and the more efficient operation ways in electrification line

  • PDF

Prediction and Measurement of Induction Phenomena in the 765 kV Double Circuit Transmission Line operated with two voltage grades (765 kV 송전선로에서의 이종 전압등급 병행 운전시의 유도현상 예측 및 실측 결과)

  • Kwak, J.S.;Kang, Y.W.;Shim, E.B.;Jeon, M.R.;Woo, J.W.;Bang, H.G.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.208-211
    • /
    • 2003
  • The western route of KEPCO's 765 kV transmission line has been tentatively operating as 345 kV voltage before commercial operation. KEPCO decided to operate the 765 kV line for commercial operation after completing the test operation of 765 kV substation in 2002. In the process of energizing the line as 765 kV voltage, double circuit transmission line will be operated with two voltage grades of 765 kV and 345 kV. As the earthing switches are installed on both ends of the line, electrostatic induction voltage and electromagnetic induction current were calculated prior to the line energizing in order to confirm the ratings. The induced voltage and current are important for the maintenance of the parallel circuit. This paper presents the simulation results of electrical phenomena such as electrostatic induction voltage and electromagnetic induction current from the parallel line. The transmission line was modeled by EMTP (Electro-Magnetic Transient Program). The simulation results were compared with the measured results at the field.

  • PDF

A Proposal of Durability Prediction Models and Development of Effective Tunnel Maintenance Method Through Field Application (내구성 예측식의 제안 및 현장적용을 통한 효율적인 터널 유지관리 기법의 개발)

  • Cho, Sung Woo;Lee, Chang Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.5
    • /
    • pp.148-160
    • /
    • 2012
  • This study proposed more reasonable prediction models on compressive strength and carbonation of concrete structure and developed a more effective tunnel safety diagnosis and maintenance method through field application of the proposed prediction models. For this study, the Seoul Metro's Line 1 through Line 4 were selected as target structures because they were built more than 30 years ago and have accumulated numerous diagnosis and maintenance data for about 15 years. As a result of the analysis of compressive strength and carbonation, we were able to draw prediction models with accuracy of more than 80% and confirmed the prediction model's reliability by comparing it with the existing models. We've also confirmed field suitability of the prediction models by applying field, the average error of an estimate on compressive strength and carbonation depth was about 20%, which showed an accuracy of more than 80%. We developed a more effective maintenance method using durability prediction Map before field inspection. With the durability prediction Map, diagnostic engineers and structure managers can easily detect the vulnerable points, which might have failed to reach the standard of designed strength or have a high probability of corrosion due to carbonation, therefore, it is expected to make it possible for them to diagnose and maintain tunnels more effectively and efficiently.

Monitoring of Cleanliness Level in Hydraulic Systems: Obtaining Reliable On-Line data

  • Hong, Jeong-Hee;Day, Mike
    • Journal of Drive and Control
    • /
    • v.9 no.2
    • /
    • pp.28-38
    • /
    • 2012
  • Monitoring of system cleanliness levels and counting of particulate contaminant are fundamental to achieving hydraulic system reliability as any departure from the specified cleanliness level is often a precursor to future failures. On-line monitoring of cleanliness levels has the advantage of giving data both very quickly and accurately as environmental influences are eliminated. In this way, corrective actions can be promptly implemented. Most on-line instruments are sensitive to system conditions to a greater or lesser extent, but Automatic Particle Counters (APCs) working on light extinction principles are especially sensitive to the presence of optical interfaces caused by such conditions as fluid mixtures, emulsions, free water and air bubbles. These conditions give erroneous data and can result in drawing incorrect conclusions, wasting maintenance time and ultimately, reduced user confidence in cleanliness monitoring. This paper describes such conditions and shows how the correct selection of the analysis technique can result in reliable cleanliness level data.