• Title/Summary/Keyword: Offshore Wind Power Development Project

Search Result 14, Processing Time 0.031 seconds

Study on Present Status and Future Direction of Korean Offshore Wind Power (한국의 해상풍력 현황과 발전방향에 관한 연구)

  • Sung, Jin Ki;Lee, Tae Jin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.3
    • /
    • pp.312-321
    • /
    • 2013
  • In this study, we review the status of Southwest sea 2.5GW offshore wind project and expected various problems. And we suggest government policies for offshore wind industrialization. Especially, we would like to mention the necessity of offshore wind development in order to diversify power sources and guarantee energy security in Korea. And we would like to mention necessity and direction to make offshore wind into growth engine industry thorough fusion between industries and energization for the existing industry such as civil, shipbuilding, steel, etc. that was headed into downturn.

A Study on the Problems and Improvement measures of Investigation of Fishing Damages Caused by Offshore Wind Power Development (해상풍력 발전사업에 따른 어업피해조사 문제점 및 개선방안에 대한 연구)

  • Youn-Suk Nam;Hyun-Gi Choo;Geo-Hyun Ryu
    • The Journal of Fisheries Business Administration
    • /
    • v.54 no.2
    • /
    • pp.91-107
    • /
    • 2023
  • Offshore wind power development has been promoted in countries around the world to cope with global warming. Despite its many advantages, offshore wind power affects the marine environment during construction and operation. As a result, the reduction of fishing areas, changes in the habitat of marine animals, damage to fishing gear, and impeding the safety of fishing activities are occurring. If the offshore wind power generation project is carried out, a fishing damage investigation is nescssary. There are only four fishing damage investigations related to offshore wind power, which are being conducted similarly to the existing fishing damage investigation related to offshore construction. Therefore, this study reviewed and analyzed the report on fisheries damage investigation related to offshore wind power conducted in Korea and suggested problems and improvement measures accordingly.

Assessment of Possible Resources and Selection of Preparatory Sites for Offshore Wind Farm around Korean Peninsula (국내 해역의 해상풍력 가능자원 평가 및 예비부지 선정)

  • Kim, Ji-Young;Kang, Keum-Seok;Oh, Ki-Yong;Lee, Jun-Shin;Ryu, Moo-Sung
    • New & Renewable Energy
    • /
    • v.5 no.2
    • /
    • pp.39-48
    • /
    • 2009
  • Recently, developing the offshore wind farm in Korean peninsula is widely understood as essential to achieve the national target for the renewable energy. As part of national plan, KEPRI (Korea electric power research institute) is performing the front running project for the offshore wind farm development that is dedicated to investigate the possible resources based on the economy considering current technological status. It also includes the selection of the first sea area among candidates and optimal design of the offshore wind farm, etc. In this paper the interim results of the project are summarized that the possible capacity for the offshore wind farm can be estimated conservatively around 18 GW regarding the wind power class, sea depth and social constraint. The five western sea areas near Taean, Gunsan, Gochang, Yeonggwang, Sinan were chosen for the candidating sites. Detailed analysis for these sites will be conducted to finalize the first-going offshore wind farm in Korea.

  • PDF

A Study on Siting of HVAC Offshore Substation for Wind Power Plant using Submarine Cable Cost Model (해저케이블 비용 모델을 이용한 HVAC 해상변전소 적정 위치 선정에 관한 연구)

  • Won, Jong-Nam;Moon, Won-Sik;Huh, Jae-Sun;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.4
    • /
    • pp.451-456
    • /
    • 2013
  • Development of the technologies for offshore wind power is proceeding actively and the installation capacity is continuously increasing because of its many advantages in comparison with the land wind power. Accordingly, project for Southwestern 2.5GW offshore wind power plant is in progress in Korea. Design of electric power systems for offshore wind power plant is very important due to its high investment and operational costs. Hence, it needs to be designed in order to minimize costs. This way can be employed in determining the installation location of offshore substation for HVAC wind power plant. According to the offshore substation site, MV inter-array cable and HV export cable lengths vary and they change a total cost regarding submarine cable. This paper represents cost models with variables which are MV inter-array cable and HV export cable lengths to locate the offshore substation for HVAC wind power plant. It is classified into submarine cable installation cost, reactive power compensator installation cost, ohmic losses, and unsupplied energy cost. By minimizing a total cost, an appropriate installation site of the offshore substation is determined.

A Study on Implications and Improvement Plans for the Developing Consultation Guidelines for Environmental Assessment of Offshore Wind Power Development Projects (해상풍력 개발사업의 환경성 평가 협의 지침 개발에 관한 시사점 및 개선안 연구)

  • Haemi, Lee;Junho, Maeng
    • Journal of Environmental Impact Assessment
    • /
    • v.31 no.6
    • /
    • pp.449-464
    • /
    • 2022
  • This study reviewed the development process of the consultation guideline for the environmental assessment of offshore wind power. Based on this, implications and improvement plans for a future revision of the guidelines. Domestic and foreign case studies reviewed the consulting cases on domestic offshore wind power development projects, environmental location consulting cases, and guidelines related to overseas offshore wind power and analyzed location characteristics and significant environmental issues by project. Major environmental issues related to offshore wind power include birds, noise and vibration, marine animals and plants, marine physics, marine water quality and sediments, marine landscapes, and other auxiliary facilities installed on land. Implications and improvements for revising the consultation guidelines for evaluating offshore wind environments require data and clear guidelines at the central government level to determine areas where offshore wind projects can be located. In a situation where the importance of cumulative impact assessment is emphasized, guidelines for cumulative impact assessment methodologies for each item that reflect the domestic situation should be prepared for a cumulative impact assessment on offshore wind power environmental issues. In addition, when revising the consultation guidelines, empirical research cases should be reflected through the accumulation of environmental surveys and monitoring data of offshore wind farms by sea area.

A study on Design of Generation Capacity for Offshore Wind Power Plant : The Case of Chonnam Province in Korea (해상풍력 발전용량 설계에 관한 연구 : 전남사례를 중심으로)

  • Jeong, Moon-Seon;Moon, Chae-Joo;Chang, Young-Hak;Lee, Soo-Hyoung;Lee, Sook-Hee
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.13 no.3
    • /
    • pp.547-554
    • /
    • 2018
  • Wind energy is widely recognized as one of the cheapest forms of clean and renewable energy. In fact, in several countries, wind energy has achieved cost parity with fossil fuel-based sources of electricity generation for new electricity generation plants. Offshore wind energy development promises to be a significant domestic renewable energy source for the target of korea government 3020 plan. A pivotal activity during the development phase of a wind project is wind resource assessment. Several approaches can be categorized as three basic scales or stages of wind resource assessment: preliminary area identification, area wind resource evaluation, and micrositing. This study is to estimate the wind power capacity of chonnam province offshore area using three basic stages based on the six meteorological mast data. WindPRO was used, one of a well-known wind energy prediction programs and based on more than 25 years of experiences in development of software tools for wind energy project development. The design results of offshore wind power generation capacity is calculated as total 2.52GW with six wind farms in chonnam offshore area.

Suitability Review on Development Plans of Offshore Wind Farm Based on National Wind Map and Geographic Information (국가바람지도 및 국가지리정보에 의한 해상풍력단지 개발계획의 적합성 검토)

  • Kim, Hyun-Goo;Hwang, Hyo-Jung;Song, Kyu-Bong;Hwang, Sun-Young;Yun, Jin-Ho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.534-535
    • /
    • 2009
  • The objective of this research aims preliminary assessments of the proposed plans of offshore wind farm development based on the recently established national offshore wind map and suitability assessment system of offshore wind farm. Incheon Mueodo, Busan Dadaepo-Gadukdo, Sinangun Haeodo have been assessed considering geographic constraints such as water depth, offshore distance, national park, grid connection, and meteorological constraint such as wind power density and wind direction. According to the assessment, Mueodo plan has a weak point in grid connection and several geographic limitations are involved in Haeodo plan while Dadaepo-Gadukdo seems the most possible plan among the review cases. Because of limited assessment in this research, more detail and further consideration are necessary to make a decision of a feasibility project at proposed sites.

  • PDF

System Improvement Measures for Rational Procedures of Offshore Wind Power Generation Projects : Focusing on Permits (해상풍력 발전사업의 합리적 절차를 위한 제도개선 방안 : 인허가를 중심으로)

  • Seok-Kyu Kang;Jeong-Gab Moon;Mun-Kwan Jo
    • The Journal of Fisheries Business Administration
    • /
    • v.54 no.2
    • /
    • pp.59-76
    • /
    • 2023
  • This study is to propose ways to improve the system for rational procedures for offshore wind power generation projects. The results of this study are summarized as follows. In order to quickly distribute and develop offshore wind power projects, the permitting period should be shortened through special laws, the government actively intervenes to support the formation and operation of privat-public councils to ensure residents' acceptance. In this way, it can be competitive in the future energy market. Above all, a special law (proposal) related to offshore wind power currently pending in the National Assembly should be passed as soon as possible. Finally, the government and local governments that manage public waters should provide active administrative support based on system improvement measures in consideration of these permits, and the project's main body should minimize damage to the marine environment and ecosystem. Through these subject-specific roles, offshore wind power generation will be able to reduce carbon emissions and help establish a sustainable energy production system.

Site Development of Offshore Wind Power in Korea - Comparison between Jeju, Buan, and Ulsan (한국의 해상풍력 공간개발정책 비교 연구 - 제주, 부안, 울산을 중심으로)

  • Ryeon-Woo, Kim;Changmo, Ann;Dong-Hyeon, Im;Jibum, Chung;Hyomin, Kim
    • New & Renewable Energy
    • /
    • v.18 no.4
    • /
    • pp.22-37
    • /
    • 2022
  • Large-scale offshore wind power is emerging as a viable solution to achieve carbon neutrality and solve climate change. As power generation complexes require ample space for construction, they create conflicts with residents near the construction site. To resolve the issue with residents, Korea, along with other countries, has developed policies that focus on influencing public perception. However, as the contents of such policies changed several times in a short period in Korea, they were differently applied depending on the timing of the project. This study examines how Korean offshore wind power site development policies, particularly the ones focusing on swaying public perception, were applied differently by regions.

The Characteristic of the Hub Construction Wind Power Industry of the West-South Seashore with Favorable Products (서남해안 풍력산업 허브 구축사업의 유망 상품의 특성)

  • Cha, In Su;Kim, Taehyung;Lee, Ki Bong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.179.1-179.1
    • /
    • 2010
  • This paper has represented about the wind power industry of the west-south seashore with leading industry development for Honam Economic Region. These projects have composed of wind power industry of the west-south seashore, offshore wind turbine(2MW, 3MW) and onshore wind turbine(3kW, 5kW, 10kW), 11 projects, during 3 years- with honam leading industry development for economic region. The contents of these project are 3 favorable products and 3 business support projects. The favorable products are the MW offshore wind system with Outer-rotor type PMSG, the 3MWoffshore wind system with adaptation type of west-south sea, the hybrid generator system with wind turbine technology basis.

  • PDF