• 제목/요약/키워드: Offshore Wind Power

검색결과 329건 처리시간 0.027초

6 MW급 해상풍력발전기용 고속축커플링 개발 (Development of High-speed Shaft Coupling for 6 MW Class Offshore Wind Turbine)

  • 박수근;이형우
    • 풍력에너지저널
    • /
    • 제10권4호
    • /
    • pp.20-27
    • /
    • 2019
  • High-speed shaft coupling in a wind power system transmits power and absorbs variations in length and spindle dislocation between the gearbox and generator. Furthermore, the coupling has an insulation function that prevents electrical corrosion caused by the flow of the generator's current into the gearbox and prevents overload resulting from sudden power failure from being transferred to the gearbox. Its design, functions, and part verification are described in the IEC61400 and GL Guidelines, which specify that the part must have a durability life of 20 years or longer under distance variation and axial misalignment between the gearbox and the generator. This study presents the design of a high-speed coupling through composite stiffness calculation, structural analysis, and comparative analysis of test and theory to identify the characteristics of high-speed coupling for a large-capacity 6 MW wind power generator. A prototype was fabricated by optimizing the manufacturing process for each part based on the design, and the reliability of the fabricated prototype was verified by evaluating the performance of the target quantitative evaluation items.

Motion Analysis of A Wind-Wave Energy TLP Platform Considering Second-order Wave Forces

  • Hongbhin Kim;Eun-hong Min;Sanghwan Heo;WeonCheol Koo
    • 한국해양공학회지
    • /
    • 제36권6호
    • /
    • pp.390-402
    • /
    • 2022
  • Offshore wind energy has become a major energy source, and various studies are underway to increase the economic feasibility of floating offshore wind turbines (FOWT). In this study, the characteristics of wave-induced motion of a combined wind-wave energy platform were analyzed to reduce the variability of energy extraction. A user subroutine was developed, and numerical analysis was performed in connection with the ANSYS-AQWA hydrodynamic program in the time domain. A platform combining the TLP-type FOWT and the Wavestar-type wave energy converter (WEC) was proposed. Each motion response of the platform on the second-order wave load, the effect of WEC attachment and Power take-off (PTO) force were analyzed. The mooring line tension according to the installation location was also analyzed. The vertical motion of a single FOWT was increased approximately three times due to the second-order sum-frequency wave load. The PTO force of the WEC played as a vertical motion damper for the combined platform. The tension of the mooring lines in front of the incident wave direction was dominantly affected by the pitch of the platform, and the mooring lines located at the side of the platform were mainly affected by the heave of the platform.

Compensation of Unbalanced PCC Voltage in Off-shore Wind Farms of PMSG Type Turbine

  • Kang, Jayoon;Han, Daesu;Suh, Yongsug;Jung, Byoungchang;Kim, Jeongjoong;Park, Jonghyung;Choi, Youngjoon
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2014년도 전력전자학술대회 논문집
    • /
    • pp.215-216
    • /
    • 2014
  • This paper proposes a control algorithm for permanent magnet synchronous generator with a back-to-back three-level neutral-point clamped voltage source converter in a medium-voltage offshore wind power system under unbalanced grid conditions. The proposed control algorithm particularly compensates for the unbalanced grid voltage at the point of common coupling in a collector bus of offshore wind power system. This control algorithm has been formulated based on the symmetrical components in positive and negative rotating synchronous reference frames under generalized unbalanced operating conditions. Instantaneous active and reactive power are described in terms of symmetrical components of measured grid input voltages and currents. Negative sequential component of ac input current is injected to the point of common coupling in the proposed control strategy. The amplitude of negative sequential component is calculated to minimize the negative sequential component of grid voltage under the limitation of current capability in a voltage source converter. The proposed control algorithm makes it possible to provide a balanced voltage at the point of common coupling resulting in the generated power of high quality from offshore wind power system under unbalanced network conditions.

  • PDF

각 컴포넌트 유지보수 주기를 고려한 풍력발전 설비의 유지보수 계획에 관한 연구 (A Study on the Maintenance Plan Considering Maintenance Cycle of Wind Turbine Component)

  • 이윤성;신준현;김진오
    • 조명전기설비학회논문지
    • /
    • 제27권5호
    • /
    • pp.39-45
    • /
    • 2013
  • Wind power is one of the fastest growing renewable energy sources. In these days, wind turbine shifts from onshore to offshore because the offshore wind farm has a abundant wind resource. However, offshore wind turbine is not easy to access, it has a long downtime when the failures of the wind turbine component occur. Therefore, the appropriate wind turbine maintenance plan is required to meet the economic and reliability of the components. This paper proposes the maintenance planning method based on the RCM(Reliability Centered Maintenance) to determine an economical maintenance cycle to satisfy the appropriate reliability of the wind turbine components. In order to compare the proposed method with the conventional RCM method, critical components are selected in the case study because they have a long downtime and a large amount of total cost.

영광 해상풍력단지 발전량 예측에 관한 연구 (The Research on the Yeonggwang Offshore Wind Farm Generated Energy Prediction)

  • 정문선;문채주;정권성;최만수;장영학
    • 한국태양에너지학회 논문집
    • /
    • 제32권3호
    • /
    • pp.33-41
    • /
    • 2012
  • As the wind farms in large scale demand enormous amount of construction cost, minimizing the economic burden is essential and also it is very important to measure the wind resources and forecast annual energy production correctly to judge the economic feasibility of the proposed site by way of installing a Met mast at or nearby the site. Wind resources were measured by installing a 80[m] high Met mast at WangdeungYeo Island to conduct the research incorporated in this paper and offshore wind farm was designed using WindPRO. Wind farm of 100[MW] was designed making use of 3 and 4.5[MW] wind generator at the place selected to compare their annual energy production and capacity factor applying the loss factor of 10[%] and 20[%] respectively to each farm. As a result, 336,599[MWh] was generated by applying 3[MW] wind generator while 358,565 [MWh] was produced by 4.5[MW] wind generator. Difference in the energy production by 3[MW] generator was 33,660 [MWh] according to the loss factor with the difference in its capacity factor by 3.8[%]. On the other hand, 23 units of 4.5 [MW] wind generators showed the difference of annual energy production by 35,857 [MWh] with 4.0[%] capacity factor difference.

메가와트급 부유식 해상풍력발전기용 페어리드 체인 스토퍼의 강도 성능평가를 위한 구조 모형 시험 (Structural Model Test for Strength Performance Evaluation of Fairlead Chain Stopper Installed on MW Class Floating Type Offshore Wind Turbine)

  • 송창용
    • 한국산업융합학회 논문집
    • /
    • 제26권3호
    • /
    • pp.421-431
    • /
    • 2023
  • Recently, the destructive power of typhoons is continuously increasing due to the influence of global warming. In a situation where the installation of floating wind turbines is increasing around the world, concerns about the huge loss and collapse of floating offshore wind turbines due to strong typhoons are deepening. Regarding to the safe operation of the floating offshore wind turbine, the development of a new type of disconnectable mooring system is required. A new fairlead chain stopper considered in this study is devised to more easily attach or detach the floating offshore wind turbine with mooring lines comparing to other disconnectable mooring apparatuses. In order to investigate the structural safety of the initial design of fairlead chain stopper that can be applied to MW-class floating type offshore wind turbine, scale-down structural models were produced using a 3-D printer and structural tests were performed on the models. For the structural tests of the scale-down models, tensile specimens of acrylonitrile butadiene styrene material that was used in the 3-D printing were prepared, and the material properties were evaluated by performing the tensile tests. The finite element analysis of fairlead chain stopper was performed by applying the material properties obtained from the tensile tests and the same load and boundary conditions as in the scale-down model structural tests. Through the finite element analysis, the structural weak parts on the fairlead chain stopper were reviewed. The structural model tests were performed considering the main load conditions of fairlead chain stopper, and the test results were compared to the finite element analysis. Through the results of this study, it was possible to experimentally verify the structural safety of the initial design of fairlead chain stopper. It is also judged that the study results can be usefully used to improve the structural strength of fairlead chain stopper in a detailed design stage.

VHF 대역 통신에 대한 해상풍력 발전단지의 영향성 분석 (Effect Analysis of Offshore Wind Farms on VHF band Communications)

  • 오성원;박태용
    • 해양환경안전학회지
    • /
    • 제28권2호
    • /
    • pp.307-313
    • /
    • 2022
  • 지구 온난화와 기후변화에 대응하기 위해 국제적으로 재생 에너지의 개발이 확대됨에 따라 풍력발전의 비중도 점차 늘어가고 있다. 태양광발전에 비해 24시간 생산이 가능하지만 대형 풍력발전기를 대규모로 설치하기 때문에 주변의 레이더나 통신 장비들의 동작에 간섭을 일으키는 지에 대한 분석이 필요하다. 본 연구에서는 해상풍력 발전단지 외해를 항해하는 선박이 VHF 대역으로 조난 통신을 송신할 경우, 육지의 기지국에서 신호를 수신할 수 있는지를 분석하였다. 대상지역 주변의 수치지형도, 풍력발전기 캐드 모델, 풍력발전단지 배치도를 바탕으로 주변 해역 및 발전단지를 수치해석이 가능하도록 모델링하였다. 광범위한 지역에 대한 전파 분석에 적절한 고주파 해석기법 중 PO, SBR 기법을 적용한 전용 프로그램으로 전자파 간섭 여부를 분석하였다. 해상풍력 발전단지 외곽에서 송신한 VHF 대역 전자파에 대해 육상 기지국에서는 약간의 수신전력 저하는 있지만 기준치 이상의 전력을 수신하였다. 선박과 육상 기지국 사이의 가시선을 완전히 가리는 경우에 수신 전력의 저하가 발생하였으나, VHF대역이 파장이 길어 회절이나 반사 등의 효과로 육상 기지국까지 충분한 전파가 도달하는 것으로 판단된다.

HeMOSU-1호 관측풍속의 불확실성을 고려한 서남해안의 풍력 발전량 예측 (Prediction of Wind Power Generation at Southwest Coast of Korea Considering Uncertainty of HeMOSU-1 Wind Speed Data)

  • 이기남;김동현;권오순
    • 신재생에너지
    • /
    • 제10권2호
    • /
    • pp.19-28
    • /
    • 2014
  • Wind power generation of 5 MW wind turbine was predicted by using wind measurement data from HeMOSU-1 which is at south west coast of Korea. Time histories of turbulent wind was generated from 10-min mean wind speed and then they were used as input to Bladed to estimated electric power. Those estimated powers are used in both polynominal regression and neural network training. They were compared with each other for daily production and yearly production. Effect of mean wind speed and turbulence intensity were quantitatively analyzed and discussed. This technique further can be used to assess lifetime power of wind turbine.

위성 관측 자료를 이용한 서해 해상 풍력자원 평가 (The Estimaion of Wind Energy Resources through out the QuikSCAT Data)

  • 장재경;유병민;유기완;이준신
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2009년도 춘계학술대회 논문집
    • /
    • pp.486-490
    • /
    • 2009
  • In order to investigate the offshore wind resources, the "QuikSCAT Level 3" data by the QuikSCAT satellite was analyzed from Jan 2000 to Dec 2008. QuikSCAT satellite is a specialized device for a microwave scatterometer that measures near-surface wind speed and direction under all weather and cloud conditions. Wind speed measured at 10 m above from the sea surface as extrapolated to the hub height by using the power law model. It has been found that the high wind energy prevailing in the south sea and the east sea of the Korean peninsula. From the limitation of seawater depth for piling the tower and archipelagic environment around the south sea, the west and the south-west sea are favorable to construct the large scale wind farm. Wind map and monthly variation of wind speed are investigate at the positions.

  • PDF