• 제목/요약/키워드: Obstructed building

검색결과 9건 처리시간 0.025초

오피스 건물에서 인접건물이 자연채광 성능에 미치는 영향 (A Study of the Daylighting Performance in Obstructed Office Building in Urban Area)

  • 박웅규;기현주;정찬울;송두삼
    • 한국태양에너지학회 논문집
    • /
    • 제34권5호
    • /
    • pp.101-108
    • /
    • 2014
  • The performance of the daylighting in buildings depends on building site and shape. As an energy saving design strategy, daylighting is a key issue in green building design. In this paper, the influence of the adjacent or obstructed building on daylighting performance of the office building in urban area was analyzed. A typical office building about 20 storeys with obstructed buildings has been modeled and simulated using Radiance. The parametric simulations have been performed to analyze the influence of the daylighting performance (illuminance, luminance) of the analyzed office. The results show that the possibility of the glare was decreased when the obstructed building is located in south, also the illuminance level was significantly decreased. When the obstructed building is located in north, the changes of the illuminance level and luminance possibility were somewhat small compared to the unobstructed condition. The daylighting performance of the analyzed building was most affected by the obstructed building in winter season.

A Study on Fire Spread between Office Room and Atrium in the Atrium Building

  • Lee, Su-Kyung;Kim, Jong-Hoon;Ko, Han-Mog
    • 한국화재소방학회:학술대회논문집
    • /
    • 한국화재소방학회 1997년도 International Symposium on Fire Science and Technology
    • /
    • pp.345-352
    • /
    • 1997
  • We could analyse the fire behavior using the developed software for fire safety assessment in a large space such as atrium. But Korean building law hasn't admitted the result of fire risk assessment in atrium. In the legislation fire resistant wall or shutter must be required between atrium and office rooms, That has obstructed development of building design and fire protection technique in Korea. From this point of view, we made scenarios of fire spread between atrium and office rooms, and then computed fire spread and fire phenomena using FASTLite and Breakl. In this study, we can decide that fire compartmentalization between atrium and office rooms doesn't require in Atrium building if the material and fire protection system were reliable. Consequently, Korean Fire Protection Regulations have to consider in direction of increasing freedom of building.

  • PDF

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF

현륭원(顯隆園)의 입지선정과 원침계획에서 정조(正祖)의 역할 (King Jeongjo's Role in Selecting the Site and Planning the Tomb of Hyeonryungwon)

  • 김동욱;우희중
    • 건축역사연구
    • /
    • 제17권5호
    • /
    • pp.23-37
    • /
    • 2008
  • Hyeunryungwon is a tomb for Crown Prince Sado, who was the father of King Jeongjo, the twenty second king of Joseon dynasty. The tomb had been originally in the Eastern part of Seoul, but was relocated in 1789 to the downtown Suwon, which was renowned as a good tomb site among the Royal family at that time. King Jeongjo looked through the records from the previous generations for the ideal location and direction for the tomb. He personally studied Feng Shui theory and designated its location and direction. He ordered for lavish decorations for the stone adornments of the surroundings of the grave mound, which was against the regulations of the royal family. He found his reasons in the precedent that allowed sumptuous decoration. However, for the arrangements of Jeongjagahk(T shaped building) and other attached facilities, he made unusual choice that other precedent royal tombs did not have. Instead of following the conventions that Jeongjagak should be facing south of a grave mound, he put it on the right side of grave mound. Also conventionally, Subokbang(a place where guards can stay) and Suragan(a kitchen that prepares food for sacrificial rites) should be facing symmetrically, but they too, were on the same side with Jeongjagak. It was a measurement that the grave mound of Hyeunryungwon can have a full view without being obstructed by other facilities and it was also personally ordered by King Jeongjo. The distinguishing features of Hyeunryuwon was motivated by King Jeongjo's filial affection, and his academic pursuit of precedent royal tombs initiated the unconventional and innovative challenges.

  • PDF

A Case-Control Study on the Predictors of Neonatal Near-Miss: Implications for Public Health Policy and Practice

  • Johnson, Avita Rose;Sunny, Sobin;Nikitha, Ramola;Thimmaiah, Sulekha;Rao, Suman P.N.
    • Neonatal Medicine
    • /
    • 제28권3호
    • /
    • pp.124-132
    • /
    • 2021
  • Purpose: Neonatal near miss (NNM) allows for the detection of risk factors associated with serious newborn complications and death, the prevention of which could reduce neonatal mortality. This study was conducted with the objective of identifying predictors for NNM in a tertiary hospital in Bangalore city. Methods: This was an unmatched case-control study involving 120 NNM cases and 120 controls. NNM was determined using Pileggi-Castro's pragmatic and management criteria. Data was collected from in-patient hospital records and interviews of postpartum mothers. Multiple logistic regression of exposure variables was performed to calculate adjusted odds ratio (AOR) with 95% confidence interval (CI). Results: Significant predictors were maternal age ≥30 years (AOR, 5.32; 95% CI, 1.12 to 9.29; P=0.041), inadequate antenatal care (ANC) (AOR, 8.35; 95% CI, 1.98 to 51.12; P=0.032), <3 ultrasound scans during pregnancy (AOR, 12.5; 95% CI, 1.60 to 97.27; P=0.016), maternal anaemia (AOR, 18.96; 95% CI, 3.10 to 116.02; P=0.001), and any one obstetric complication (hypertensive disorder in pregnancy, diabetes in pregnancy, preterm premature rupture of membranes, prolonged labour, obstructed labour, malpresentation) (AOR, 4.34; 95% CI, 1.26 to 14.95; P=0.02). Conclusion: The predictors of NNM identified has important implications for public health policy and practice whose modifications can improve NNM. These include expanding essential ANC package to include ultrasound scans, ensuring World Health Organization recommendations of eight ANC visits, capacity building at all levels of health care to strengthen routine ANC and obstetric care for effective screening, referral and management of obstetric complications.

모듈러 건축물의 특성을 반영한 공공발주 방식의 개발 (Development of Project Delivery System in Public Sector for Modular Building)

  • 남성훈;김경래
    • 한국건설관리학회논문집
    • /
    • 제17권4호
    • /
    • pp.49-56
    • /
    • 2016
  • 최근 모듈러 건축물 관련 연구가 활발하게 진행되고 있으나, 실제 건설산업에서 모듈러 건축물을 활용한 건축공사의 발주는 아직 활성화되지 못하고 있다. 이에 대한 여러 가지 원인들이 분석되고 있으나 그 중 중요한 것은 모듈러 건축물은 기존 현장중심의 건설생산체계를 공장제작-운송-현장설치 새로운 체계로의 전환을 요구하고 있다는 것이다. 하지만 국내 공공공사의 기존 발주방식은 전기통신공사업 등 개별법에서 분리발주를 의무화하고 있기 때문에 모듈러 건축물 장점을 살릴 수 있는 새로운 건설생산체계를 수용하기 어렵다. 따라서 기존 발주방식은 모듈러 건축물을 현장중심의 공사로 분리발주(건축 토목, 전기, 통신, 소방 등) 계약할 수밖에 없고, 건축 토목공사의 계약 범위 안에서 모듈러 유닛을 물품으로 구매할 수밖에 없기 때문에 이러한 분리발주로 인한 모듈러 건축물의 공장제작 비율을 저하시키고 공사비 상승, 품질저하 등의 문제를 발생시켜서 모듈러 건축물의 장점을 발휘하지 못하도록 하는 장애요인이 된다. 본 논문에서는 모듈러 건축물에서 요구하는 새로운 건설생산체계를 적극적으로 수용할 수 있는 새로운 발주방식을 개발하여 제안하고자 한다.

도시 산림습지 내 양서류 서식처 조성방안 연구 (Planning for Amphibians Habitats in Urban Forest Wetlands, Korea)

  • 허명진;한봉호;곽정인
    • 한국환경복원기술학회지
    • /
    • 제20권6호
    • /
    • pp.1-19
    • /
    • 2017
  • This study set out to identify problems with amphibian habitation by the wetland types and improve their habitation environment in urban forest wetlands, thus creating a habitat for amphibians. Study site include forest swamps in Jatjul Park as well as Yeoji neighborhood Park in Guro-gu, and in Choansan neighborhood Park in Dobong-gu. The forest swamp in Jatjul Park gets its water from Mt. Maebong and it is a former escalated farmland-turned wetland. The swamp area is $2,500m^2$, a forest zone and a landscape planting site are 83.27% and 6.70% each. Target species Seoul pond frogs are inseparable from rice fields because they live in a short radius of and lay eggs in or near paddy fields, and Rana nigromaculata have similarities with Rana plancyi chosenica in choosing their habitats. There was need for paths that would lead to other paths so amphibians would spread to other parts of the forest and for measures to secure open water. Modifying a variety of routes for water, human and animals along with building a buffer to keep the core habitation zones were required. The forest swamp in Yeonji neighborhood Park used to be a water reservoir on the foot of Mt. Gunji. The swamp area is $1,980m^2$, a forest zone and farmland account for 80.61% and 4.88% each. Non-point pollutants from upstream along run into the subject forest marsh, bare ground on the around swamp and steep stone embankments obstructed amphibians. Target species was Bufo gargarizans that live in forests and edges of hills and spawn in deep water. The forest swamp in Choansan neighborhood Park gets its water from Mt. Choan and it is close to its water source that it is a mountain stream forest wetland. The basin and the swamp are $35,240m^2$ and $250m^2$ in size respectively. A forest zone accounts for 90.20%, high stone embankments laid in refurbishing the valley obstruct amphibians and there is water shortage in times of droughts. Target species were Rana coreana, Rana dybowskii and Hynobius leechii that live in mountain valleys, streams and wetlands and lay eggs in forest marshes and rocks in valleys. Looking into the three swamps of amphibian habitation, I came to conclusions that those wetlands were suitable for their amphibians but man-made facilities blocked their corridors leading to other corridors and even killed off target species in some parts of those swamps by destroying those parts. Amphibians live in water, on ground and underground at different stages of life. Hence, we should take this fact into consideration when planning their habitats and design core habitation zones, buffers zone and use zones accordingly. Buffer zones ought to be between core habitation zones and surrounding trees. Aiming at protecting core habitation zones, buffers should be in harmony with habitation zones. Use zones should be minimized in size and not in direct contact with core habitation zones.

반사판의 폭 조절이 가능한 서랍형 타입의 가동형 광선반 개발 연구 (Development of a Movable Drawer Type Light-Shelf with Adjustable Depth of the Reflector)

  • 김다솜;이행우;서장후;김용성
    • 설비공학논문집
    • /
    • 제28권9호
    • /
    • pp.343-349
    • /
    • 2016
  • Due to the recent increase in lighting energy consumption in buildings, there are a growing number of studies seeking solutions this problem. The effectiveness of light-shelves as natural lighting systems to solve this problem has been recognized, and various studies regarding such systems are being carried out currently. However, the lighting efficiency of light-shelves decreases if illumination intensity is low-such as at night time, and it also obstructs the views of building occupants. Therefore, the purpose of this study is to examine a movable drawer type light-shelf which allows for the width of the reflector to be adjusted and verify its performance through a simulated test-bed. The following conclusions were reached. 1) The purpose of this study is to solve the problem previously associated with the light-shelf system- of obstructed views-by responding to external environments and minimizing the width of the light-shelf at night time when the efficiency of the light-shelf declines. 2) The proper variables of the movable drawer type light-shelf which enables the width adjustment of the reflector were ascertained in this study according to four solar terms : a width of 0.6 m at an angle of $20^{\circ}$, a width of 0.4m with an angle of $20^{\circ}$, and a width of 0.1 m with an angle of $20^{\circ}$ were determined for the summer solstice, fall/spring equinoxes, and winter solstice respectively; revealing that width adjustment of the light-shelf is a significant factor. 3) The movable drawer type light-shelf which enables${\backslash}$width adjustment of the reflector suggested in this study can reduce the lighting energy consumption by 18.7% and 14.3% in comparison to previous light-shelves with a fixed width of 0.3 m and 0.6m, indicating that it is effective for saving energy.

감염병의 예방 및 관리에 관한 법률상 역학조사와 관련된 형사법적 쟁점 (Criminal Law Issues in Epidemiological Investigations Under the INFECTIOUS DISEASE CONTROL AND PREVENTION ACT)

  • 장준혁
    • 의료법학
    • /
    • 제23권3호
    • /
    • pp.3-44
    • /
    • 2022
  • 2020. 2.경 대한민국에서 코로나19 감염증의 대유행이 시작될 당시 문제가 되었던 대구 지역 A종교단체의 역학조사 방해 사건을 중심으로 면밀히 검토한 결과, 역학조사관이 특정 단체에게 명단 제출을 요구하였을 때, 이에 불응하거나 편집된 누락 명단을 제출한 행위에 대하여 역학조사에 해당하지 아니한다는 취지로 선고된 사례가 있는 반면, B열방센터 행사 출입자명단 미제출 사건의 경우 '출입자 명단' 등을 요구받았음에도 정당한 이유 없이 거부한 사실에 대하여 '출입자 명단의 제공은 역학조사에 수반되는 역학조사 간의 연결 과정을 형성하는 핵심적 사실행위로, 이를 거부하는 것도 역학조사 거부, 방해행위에 해당'하므로 적법하게 명단을 요구할 수 있어 처벌이 가능하다는 사례도 있다. 교인명단 제출요구가 역학조사에 해당하는지 여부와 관계없이 교인명단 제출 거부 또는 누락 행위가 곧 역학조사 거부·방해행위에 해당하는 경우도 있는데, 역학조사와 직접 관련성, 역학조사를 위한 것임이 외부적으로 표시되어 인식되었는지 여부, 명단의 역학조사 외의 목적으로 전용될 가능성 등을 종합적으로 고려하여 역학조사에 수반되는 사실행위를 방해함으로써 결과적으로 역학조사가 거부 내지 방해되는 결과가 발생한 경우에는 역학조사 방해가 된다는 하급심 판결의 논리가 설득력이 있다. 역학조사 결과 확인된 각 감염병환자등이나 접촉자 등에 대해 설문조사나 인체검체 채취 및 시험과 같은 역학조사가 실시되지만, 개별적인 사람에 대해 실시되는 역학조사가 서로 독립하여 존재할 수 없으며 역학조사의 연결 과정을 확인하고 추적하는 과정이 역학조사에 필수적으로 수반되며 이러한 연결고리를 확인하는 과정을 누군가 고의로 방해하거나 거부하게 되면, 역학조사가 직접적이고 현실적으로, 광범위하게 방해되는 결과가 발생하기 때문이다. 이 글에서는 주로 ① 감염병예방법상 역학조사와 정보 제공 요청은 차이점이 있으나 정보 제공 요청의 경우에도 역학조사에 해당되는 영역이 있다는 점, ② 코로나19의 의학적 특성과 역학조사의 연속성을 감안하면 역학조사관의 명단요구 행위가 역학조사에 해당할 여지가 있다는 점, ③ 특정한 경우에는 역학조사 방해죄가 위계공무집행방해에 해당할 수 있다는 점, ④ 2020. 9. 29.부터 감염병예법상 정보제공요청을 거부하는 경우에 징역형 또는 벌금형의 처벌규정이 신설되어 운용되고 있다는 점 등을 지적하여, 향후 감염병예방법의 적용 및 역학조사 실무 운용에 있어 도움이 되고자 한다.