Since, human error is a major factor contributing to disaster during start-up of operation in Boiler plant. it is necessary to develop an automation system which prevent mode of operation that are known to be dangerous and to bring a loss of energy. The aim of this study is to suggest a model for the computer-aided synthesis of operation sequence as a part of automation system for start-up operation. Synthesis is accomplished by the formation of a hierarchical network of goals which decide sequence of operations. Hierarchical Network is formed by using method which upper goals ( i.e. upper operation al situation) are classified by the function of themselves into lower goals (i.e. lower operational situation). Knowledge for deciding operation sequence is generated by putting In order the knowledge of hazard operation and energy management.
A Microgrid is a private small-scale power system composed of distributed energy resources (DERs), storage devices and loads. And it is expected that the Microgrid will come into wide use in the near future. For this, the establishment of the Microgrid operation methodology is a very important problem. Especially, the Microgrid is greatly different from existing private small-scale power systems because of the multiple participants. Therefore, the Microgrid operation considered various requirements according to multiple participants is more complicated than the operation of existing private small-scale power systems. In this paper, Microgrid operation methodology based on a market environment is suggested. Through case studies, the effectiveness of the suggested methodology is verified.
Purpose of the 765kV trial operation conducted for the first time in our country are performance verification of domestic developed equipment(765kV M.Tr, GIS,etc) and extraction of problem in advance to commercial operation and cultivation of operation ability. The trial operation of 765kV substation was finished successfully under the positive supports of institutes. manufactures. and constructers. It is expected that extraction of problems in advance and accumulation of operation techniques through the trial operation of 765kV substation will be contributed largly to the realization of the without a hitch operation of 765kV system.
Kim, Jae-Sung;Jeon, Chung-Huan;Lee, Eun-Cheol;Ahn, Young-Joon;Kang, Seok-Dong;Ahn, Sung-Yong;Shin, Young-Kyo;Ryu, Jae-Hwa
한국정보디스플레이학회:학술대회논문집
/
한국정보디스플레이학회 2000년도 제1회 학술대회 논문집
/
pp.23-24
/
2000
A new PDP cell structure called CSP (Charge Storage Pad) improves the luminous efficiency by 1.6 times and prevents cross talk between adjacent cells. The CSP, which is a conducting material, is inserted between the dielectric layer and the MgO film in the front plate. This CSP produces a longer time-averaged discharge path to get a high luminous efficiency and confines the discharge to prevent cross talk.
Trains in LRT(Light Railway Transit) system usually have shorter car length than metro's because of their smaller passensers demand. Therefore it is very likely that the load condition of LRT system in abnormal operation, in case of which trains are in close proximity by system broke or train rescue works, could be worse rather than in normal operation, in spite of rare probability of abnormal operation. In this study, the target reliability indexes of several abnormal operations are estimated in accordance with the occurrence probabilities of each abnormal operation case and the reliability index of normal operation presented by the specification. From the indexes, load factors for the abnormal operation cases are estimated and the safety evaluation is performed for Yong-in LRT project.
Distributed generation (DG) systems fall in islanding operation when they still in operation even when the main grid is out of electric power Islanding operation is further classified into intentional islanding and unintentional islanding operations. In intentional islanding operation, the DG backs up critical loads while it separates from the main grid on islanding detection. Intentional islanding operation increases utilization of the DG system during the islanding operation. This paper proposes reasonal inverter topology and its control algorithm for seamless transfer of DG systems in intentional islanding operation.
In order to provide continuous Korea Augmentation Satellite System (KASS) services, the operation organization should continuously and systematically perform operations, maintenance, and technical activities. All subsystems of KASS, all Line Replacement Units (LRUs), and Software Replacement Units (SWRUs) should be operated and maintained continuously. In order to effectively manage these activities, it is necessary to develop an Operation Management Tool (OMT). For this purpose, operation management, operation organization, and operation activities were defined. The defined requirements were divided into general, function, interface, and database for OMT development, and functions and decision-making procedures consisting of site/asset/trouble/work order/schedule management were designed. The OMT developed by reflecting the site and asset information as well as the design content met predefined requirements. The OMT will be actively used in actual KASS operation and will evolve by continuously reflecting the additional requirements of operators. Through this tool, KASS will support continuous service provision.
본 연구에서는 댐군을 연계운영할 경우 발생하는 효과를 이수측면에서 평가할 수 있는 방법을 개발하여 한강수계 댐군 운영 실적의 평가에 적용하였다. 개발된 평가방법에서는 용수공급과 유황개선 부분에서 연계운영의 효과를 평가하기 위하여 평가지점에서 필요수량에 대한 충족률과 유황안정도를 평가지표로 사용하였다 발전 부분에서 연계운영의 효과는 댐군에 의해 생산된 총발전량을 평가지표로 사용하였다. 실제 운영실적은 공칭공급량을 공급하는 단독운영과 최적화 모형에 의한 평가지표들과 비교하여 평가되었다. 한강수계의 2001년부터 2004년까지의 실제 연계운영 실적을 단독운영과 최적화 모형의 결과와 각 연도별로 비교해 보면, 용수공급 측면에서 필요수량 충족률은 단독운영은 $94.36{\sim}99.68%$, 실제운영은 $97.16{\sim}99.90%$, 최적화 모형은 4개년 모두 100.0 %를 나타냈다. 댐 운영 방법별로 하상계수와 유황계수를 사용하여 유황안정도를 평가해 보면, 유황이 단독운영 보다 실제운영과 최적화 모형이 더 안정적인 결과를 나타냈다. 실제 총발전량을 다른 운영방법의 결과와 비교해 보면, 최적화 모형은 실제 총발전량 보다 $-3.47{\sim}6.54%$ 증가된 결과를 나타냈으며, 단독운영은 실제 총발전량 보다 $12.68{\sim}38.94%$ 감소된 결과를 나타냈다.
The changes of serum glutamic oxaloacetic transaminase [SGOT], serum glutamic pyruvic transaminase [SGPT], serum lactic dehydrogenase [LDH] and serum creatine phosphokinase [CPK] were examined during and after the open heart surgery. In the total of 52 patients with heart diseases including 40 cases of congenital heart anomalies and 12 cases of acquired valvular heart diseases who undergone open heart surgery under cardiopulmonary bypass. The results obtained are as follows: 1. The average value of SGOT before surgery was 30.27 [ 18:86 units. The enzyme was reached to the maximum of 139.88 [ 89.43 units on the 1st day after the operation [p< 0.05], the enzyme activity was gradually decreased from the 3rd day after the operation, returned to the normal range on the 7th day after the operation. 2. The average value of SGPT before surgery was 14.36 [ 7.45 units. The enzyme was reached to the maximum of 34.67 [ 27.64 units on the 2nd day after the operation, but it was valueless statistically, the enzyme activity was gradually decreased from the 3rd day after the operation, returned to the normal range on the 5th day after the operation. 3. The average value of LDH before surgery was 263.07 * 86.66 units. The enzyme was reached to the maximum of 662.29 * 303.60 units on the 2nd day after the operation [p < 0.05], the enzyme activity was gradually decreased from the 5th day after the operation, returned to the normal range on the 7th day after the operation. 4. The average value of CPK before surgery was 141.35 * 43.44 units. The enzyme was reached to the maximum of 377.42 [ 222.02 units on the 1st day after the operation [p < 0.05], the enzyme activity was gradually decreased from the 5th day after the operation, returned to the normal range on the 7th day after the operation. 5. In the relationships of the serum enzymes and duration of the extracorporeal circulation, the values on the group over 90 minute of the extracorporeal circulation were increased than on the group below 90 minute of the extracorporeal circulation, but it was valueless statistically.
Many production methods are tried to enhance the productivity efficiency. Parallel connected floating cranes are one of the examples to lift mega-blocks quickly and efficiently. However, a general operation manual to operate parallel connected floating cranes and a method to consider risks during lifting operation are not confirmed. And if each floating crane is operated by itself, it is very hard to cooperate. Therefore, Synchronized operation system is installed to control parallel connected floating cranes simultaneously and to be informed of each floating cranes data. And weighting factor is calculated by considering all hazards during the operation and the general operation manual is confirmed based on the factor. This paper introduces the procedure for lifting operations by parallel Connected Floating Cranes using synchronized operation system, and its applications to lifting operation of a heavy cargo such as barge lifting test, floating dock installation and 900 ton goliath crane replacement operation, etc.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.