• Title/Summary/Keyword: Number of railway

Search Result 582, Processing Time 0.026 seconds

A Study on the Developmental Directions of Transfer Stations with Traffic Cards Data - Focused on Daegu City - (교통카드자료를 이용한 환승정류장의 개발 방향에 관한 연구 - 대구시를 중심으로 -)

  • Kim, Ki-Hyuk;Lee, Seung-Cheol
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6D
    • /
    • pp.539-547
    • /
    • 2012
  • Increasing the mode transfer volume between public transportation modes has known to be necessary for efficiency improvement of public transportation system operation and it is also found to be important to have relevant transfer point selection with reflection of current travel pattern. This study is in regards to providing a selection guideline for the location of transfer point between public transport modes. This case study has been carried out for Daegu Metropolitan City especially for public transportation users behaviour by analysis of daily usage of transportation card to identify the transfer travel pattern. A cluster analysis was applied to categorize the pattern of transfer stop which induces many users and a discriminant analysis also utilized for grouping the stops by number of transfer trip. This research produces the estimation result of transfer volume for urban railway system no.3 in Daegu City which is currently under construction. In addition, the locations of transfer center has also been proposed.

Smoke Control in a Subway Station Platform with Screen Doors - Based on Busan Subway Line 3 - (스크린도어 설치에 따른 지하승강장 제연의 문제점과 대책 - 부산 지하철 3호선을 중심으로 -)

  • Park, Woe-Chul
    • Fire Science and Engineering
    • /
    • v.20 no.1 s.61
    • /
    • pp.50-54
    • /
    • 2006
  • A fire in a subway station platform, completely isolated by screen doors, was numerically simulated to investigate problems in smoke control and find their countermeasures. A part of the platform, $40m{\times}5m$ floor and 3 m high, and a fire of 1 MW were considered, and the smoke extraction system was assumed to start operation at the onset of the fire. For three different values of the exhaust air flow rate, 0.1, 2, and $4m^3/min-m^2$, the distributions of temperature, concentrations of soot and carbon monoxide, and those of visibility were compared. The time-variations of the number of randomly distributed particles in the space were also investigated for the air flow rates to see the efficiency in smoke control. It was shown that smoke control takes time by lack of air supply. It was also confirmed that air supply from the railway to the platform at emergency is needed so that smoke is able to be controlled efficiently, and that opening the doors at the both ends of the platform is desirable until the fire is completely extinguished.

A Flexible Operation Plan of Free Ride System Based on Transport Card Data in Seoul Metropolitan Area (수도권 교통카드자료를 활용한 무임승차제도의 탄력적 운영방안)

  • Lee, Chang Hun;Kim, Sigon;Yun, Gyeong Cheol
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.6
    • /
    • pp.1069-1073
    • /
    • 2016
  • The current free-riding subway system for the elderly over 65 years old has been implemented since in 1980. As the aging population increases, the number of free riders also increases. It results eventually in the increase of subsidy from government. In addition, a transfer between subway and bus is not good enough since the free ride system is applied to only subway not to bus. The aim of this study is to analyze the transport card data to understand the impact of free-riding in the viewpoint of economic issues. It aims also to analyze the transfer patterns between public transport. At the end it compares Korea case with international cases and finds out some issues on free-ride systems. Finally, counter-measures aimed at improving the current free-rider system is suggested.

Design and Analysis of High Gain Beamforming Patch ESPAR Antenna for Railroad Wireless Communication (철도 무선통신을 위한 단일 RF 체인을 사용하는 고이득 빔포밍 패치 ESPAR 안테나 설계 및 분석)

  • Choi, Jinkyu;Jang, Kukhan;Ryu, Heung-Gyoon
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.26 no.8
    • /
    • pp.710-717
    • /
    • 2015
  • In this paper, we design an array antenna structure based on a patch ESPAR(Electronically Steerable Parasitic Array Radiator) antenna with three elements for reliable communication in high-speed railway wireless communication. The ESPAR antenna consists of the active element with a single RF-chain and the parasitic elements surrounding an active element. The ESPAR antenna is capable of beamforming by adjusting the reactance of the parasitic element. We propose a vertical array antenna structure based on the patch ESPAR antenna and simulate it according to the change of the number of antennas and the distance between antenna rows. The simulation results show that we can get the maximum beam gain and highest directivity when the distance between antenna rows is ${\lambda}$.

Parallel Descrambling of Transponder Telegram for High-Speed Train (고속철도용 트랜스폰더 텔레그램의 병렬 디스크램블링 기법)

  • Kwon, Soon-Hee;Park, Sungsoo;Shin, Dong-Joon;Lee, Jae-Ho;Ko, Kyeongjun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.41 no.2
    • /
    • pp.163-171
    • /
    • 2016
  • In order to detect the exact position of high-speed train, it is necessary to obtain location information from the transponder tag installed along the track. In this paper, we proposed parallel descrambling scheme for high-speed railway transponder system, which aims for reducing the processing time required to decode telegram. Since a telegram is stored in a tag after information bits are scrambled by an encoder, decoding procedure includes descrambling of received telegram to recover the original information bits. By analyzing the structure of the descrambling shift register circuit, we proposed a parallel descrambling scheme for fast decoding of telegram. By comparing the required number of clocks, it is shown that the proposed scheme significantly outperforms the original one.

Load Carrying Capacity of Back-to-Back Reinforced Soil Walls (Back-to-Back 보강토 옹벽의 하중지지 특성)

  • Yoo, Chung-Sik;Kim, Sun-Bin
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.12
    • /
    • pp.41-52
    • /
    • 2008
  • This paper concerns the load carrying capacity of back-to-back reinforced soil wall for use in roadway and railway construction. Two test conditions, designed with due consideration of the FHW A design guideline, were first developed and a number of cases having different reinforcement lengths were tested under a surchage loading until failure. The results indicated that for cases in which two sides of reinforcements do not overlap, the wall behavior was similar to those of single wall. For cases in which the reinforcements overlap each other, on the other hand, the load carrying capacity of the wall significantly decreased when reinforced with reinforcement layers having lengths less than 50% of the wall height.

A Comparative Study of the Flexible Moving Block System and the Fixed Block System in Urban Railway (도시철도에 있어 이동폐색방식과 고정폐색방식의 상호비교 연구)

  • Jeong, Gwangseop;Park, Jeongsoo;Won, Jaimu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.723-730
    • /
    • 2006
  • Recently, The flexible moving block system in train operation has been introduced to the worldwide rail transportation markets. This paper is a comparative study of the conventional fixed block systems effects and the flexible moving block system on train operating time saving. Based on the literature review, the new algorithm is developed. It is to calculate the optimum headway time of the train. The proposed algorithm can overcome some of the existing algorithm problems, such as the limits of the data and unaware of the rail characteristic. The total travel time saving effect has been analyzed by applying the skip stop scheduling system to the each block system. The results of this study indicated that the total travel time is approximately 40% decreased and the schedule velocity is approximately 24% improved when the moving block system is applied. The results of this study could be used as a theoretical basis for the selection of rail signal system in Seoul's subway number 2 line.

A Study on the Service Reliability and Power Quality Improvement Using Hybrid Type Capacitor Bank (하이브리드 타입 커패시터 뱅크를 이용한 공급신뢰도 및 전력품질 개선 방안 연구)

  • Lee, Hansang;Yoon, Dong-Hee
    • Journal of IKEEE
    • /
    • v.18 no.3
    • /
    • pp.313-319
    • /
    • 2014
  • The objectives of power system operations are to preserve system stability and reliability as well as to supply proper electric power. For an activation of these objectives, voltage and reactive power should be considered. There are a number of types about reactive power sources, and an insertion of shunt capacitor banks are one of the method to support bus voltage adjacent. This paper includes the design procedure to determine the hybrid type capacitor bank configurations on power system to improve stability and reliability. This procedure includes the capacitor bank capacity calculation, reactor type selection, and reactor capacity calculation. The total capacity calculation of capacitor bank is based on the reactive power margin which is calculated through system studies such as, contingency analysis and Q-V analysis. In the second step, the reactor type and its capacity can be determined through the harmonic analysis. This paper shows that the harmonics are decreased by the proposed hybrid type capacitor bank, especially 5th and 7th harmonics.

A Study on the Improvement for a Defect Diagnosis of Track Circuit on HSL (고속선 궤도회로 결함진단을 위한 개선방안 연구)

  • Park, Ki-Bum;Lee, Tae-Hoon;Lee, Gi-Chun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1656-1664
    • /
    • 2007
  • This paper introduces a study of improvement for a defect diagnosis of the UM71C track circuit using on HSL. The track circuit on HSL has long operation section. Therefore, when the worker maintain, many times and efforts are spent. So, periodically, we have operated a inspection car. However, we don't know exactly the state changed of the inspection data when track circuit has defect. Actually, We fixed a sample area within operation section on HSL and performed the simulations for short circuit current that is reflected characteristic impedance and propagation factor. We compared the measuring data with the result of the simulation. Using verified simulation program, we estimated inspection data as the malfunction number and the change of capacity of compensation capacitor. These study need to secure of the safety as the train operation. Also, It needs to make a criteria of analysis for the maintenance through comparison simulation data and inspection data.

  • PDF

Economic Evaluation on Geosynthetic Reinforced Abutment for Railways (특정형상의 인공자갈이 혼합된 도상자갈층의 지지성능과 응력전달특성)

  • Kim, Dae Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.12
    • /
    • pp.15-20
    • /
    • 2019
  • This paper evaluated the construction costs of 11 design cases to decrease the horizontal forces applied to the abutment. They include two abutment types, which are to improve backfill materials for a reversed T-shaped abutment and geosynthetic Reinforced Abutment for Railways (RAR). The first type of economic analysis was that the internal friction angles of backfill materials were increased from Φ=35° to Φ=40° and 50° for a reversed T-shaped abutment. In addition, the second type was the cases with the design of geosynthetic RAR. When friction angles of 40° or 50° were applied through the improvement of the backfill material, the decrease in construction cost of the abutment was not large (2.0~3.9%), even though the horizontal forces applied to the abutment had decreased to 18~48%. In the case of applying the RAR, however, a maximum 30% cost reduction was evaluated by the decrease in horizontal force to "0" theoretically. The cost reduction resulted from the decrease in wall thickness, base slab size, and number and material change of pile foundation for the abutment.