Research on the constructability of mechanical splices in Nuclear Power Plant in Korea (국내 건설원전의 기계적철근이음 공법 적용성 분석)

  • Bang, Chang-Joon;Lee, Byung-Soo;Jeong, Young-Hwan;Lim, Sang-Joon;Park, Jong-Hyuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.13-14
    • /
    • 2013
  • Mechanical splices has been applied in nuclear power plant according to ASME(American Society of Mechanical Engineering) and ACI(American Concrete Institute) Code requirements. In particular sleeve with ferrous filler metal splices and cold roll formed parallel threaded splices have been used in domestic nuclear power plants. The objective of this study is to find out the constructability of the mechanical splices which had been used in Korea nuclear job site and to review the technical trends in the near future.

  • PDF

Analysis of the Structural Target Performance in order to Apply High-Strength Reinforcing Bars for the Nuclear Power Plant Structures (원전구조물의 고강도철근 적용을 위한 구조적 목표성능분석)

  • Lee, Byung-Soo;Bang, Chang-Joon;Lee, Han-Woo;Lim, Sang-Joon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.195-196
    • /
    • 2012
  • Because of the high level of the safety and durability, a lot of reinforcing bars is placed in the concrete structure of the Nuclear Power Plant. But the overcrowding re-bars cause some problems during the construction as the diseconomy, construction delay, quality deterioration, and so on. These problems can be solved by applying the high-strength reinforcing bars to NPP structure. To achieve this, after analysing the structural target performance like the control of cracks, adherence, shear, torsion, development of reinforcement and earthquake-resistance, the results of the analysis will be reflected in the structural performance evaluation test.

  • PDF

Research Integrated Change Process for Configuration Management of Construction Nuclear Power Plant (건설원전 형상관리를 위한 통합변경프로세스 연구)

  • Park, Youjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.231-232
    • /
    • 2016
  • Configuration Management (CM) is a process of identifying and documenting the characteristics of a Structures, Systems and Components (SSCs), and of ensuring that changes to these characteristics are properly assessed, approved, issued, implemented and verified. There are requirement management, change control, facility configuration information management for CM activities. In order to improve safety of Nuclear Power Plant(NPP), it is necessary to manage change item systematically. Existing CM concept is focused on the NPP in operation. On the other hand, NPP under construction is difficult to efficiently manage the change because of different change process from varoius stake-holders. This research considers method of consolidation change process for NPP to ensure that approved changes are accurately reflected in the design requirements, facility configuration information, and the physical configuration.

  • PDF

Fuel Cost Analysis of CANDU-PHWR Wolsung Nuclear Power Plant Unit 1

  • Lee, Ik-Hwan;Lee, Chang-Kun;Yang, Chang-Guk;Yook, Chong-Chul
    • Nuclear Engineering and Technology
    • /
    • v.9 no.3
    • /
    • pp.151-163
    • /
    • 1977
  • Being based on the Segal method, calculation was carried out for the natural uranium nuclear fuel cost with Zircaloy-4 cladding having design Parameters of Wolsung Nuclear Power Plant, CANDU-PHWR (Unit 1) , currently under construction in Korea aiming at its completion in 1982. An attempt was also made for tile sensitivity analysis of each fuel component; j. e., depreciation of fuel manufacturing plant caused by its life time, its load factor, production scale expansion of plant facilities, variations of construction and operating costs of fuel manufacturing plant, fluctuation of interest rates, extent of uranium ore price increases and effect of learning factor.

  • PDF

Analysis of Korea's nuclear R&D priorities based on private Sector's domestic demand using AHP

  • Lee, Yunbaek;Son, Seungwook;Park, Heejun
    • Nuclear Engineering and Technology
    • /
    • v.52 no.11
    • /
    • pp.2660-2666
    • /
    • 2020
  • Korea successfully achieved energy independence in the shortest period of time from being the poorest country in terms of energy 50 years ago through steady development of nuclear technology. In the past, the nuclear industry has been driven through government-centered policy development, public institution-based research, and industrial facility and infrastructure construction. Consequently, South Korea became a nuclear energy powerhouse exporting nuclear power plants to the UAE, surpassing the level of domestic technological independence. However, in recent years, the nuclear industry in Korea has experienced a decline in new plant construction since the Fukushima accident in Japan, which caused changes in public perspectives regarding nuclear power plant operation, more stringent safety standards on the operation of nuclear power plants, and a shift in governmental energy policy. These changes are expected to change the domestic nuclear industry ecosystem. Therefore, in this study, we investigate the priority of technology development investment from the perspective of experts in private nuclear power companies, shifting the focus from government-led nuclear R&D policies. To establish a direction in nuclear technology development, a survey was conducted by applying an analytic hierarchy analysis to experts who have worked in nuclear power plants for more than 15 years. The analysis items of focus were the 3 attributes of strategic importance, urgency, and business feasibility of four major fields related to nuclear energy: nuclear safety, decommissioning, radioactive waste management, and strengthening industrial competitiveness.

A Study on Improvement of Nuclear Power Plant Construction System According to Data-centric Design Technique Introduction in Korea (데이터 기반 설계기법 도입에 따른 원전 건설관리체계 개선방향 고찰)

  • Lim, ByungKi;Byon, Sujin
    • Journal of Energy Engineering
    • /
    • v.25 no.1
    • /
    • pp.108-112
    • /
    • 2016
  • This study is established the data-centric design concept, which is the latest design technique, by analyzing existing study literature for its application on the nuclear power plant industry in Korea. This study investigated the data-centric design cases in the advanced companies and suggests a data-centric design integrated system framework by analyzing the major functions of the commercial 3D CAD system, which is globally used in the plant architect engineering. In order to apply the data-centric design integrated system framework to the nuclear power plant industry in Korea, the main functions of a nuclear power plant design information integrated system framework, which can manage the design products of each EPC step and the related information in integrated way, is suggested by analyzing the supplier design, field design process and field design drawings, which have close relation with the plant Architect Engineering (A/E). It is expected that the result of this study would contribute in the dramatic enhancement in the job efficiency of nuclear power plant design process in Korea.

Development of Wall-Thinning Evaluation Procedure for Nuclear Power Plant Piping-Part 1: Quantification of Thickness Measurement Deviation

  • Yun, Hun;Moon, Seung-Jae;Oh, Young-Jin
    • Nuclear Engineering and Technology
    • /
    • v.48 no.3
    • /
    • pp.820-830
    • /
    • 2016
  • Pipe wall thinning by flow-accelerated corrosion and various types of erosion is a significant and costly damage phenomenon in secondary piping systems of nuclear power plants (NPPs). Most NPPs have management programs to ensure pipe integrity due to wall thinning that includes periodic measurements for pipe wall thicknesses using nondestructive evaluation techniques. Numerous measurements using ultrasonic tests (UTs; one of the nondestructive evaluation technologies) have been performed during scheduled outages in NPPs. Using the thickness measurement data, wall thinning rates of each component are determined conservatively according to several evaluation methods developed by the United States Electric Power Research Institute. However, little is known about the conservativeness or reliability of the evaluation methods because of a lack of understanding of the measurement error. In this study, quantitative models for UT thickness measurement deviations of nuclear pipes and fittings were developed as the first step for establishing an optimized thinning evaluation procedure considering measurement error. In order to understand the characteristics of UT thickness measurement errors of nuclear pipes and fittings, round robin test results, which were obtained by previous researchers under laboratory conditions, were analyzed. Then, based on a large dataset of actual plant data from four NPPs, a quantitative model for UT thickness measurement deviation is proposed for plant conditions.

Analysis on Virtual reality-based information requirements for Nuclear power plant operation and maintenance (원전 가상현실기반 운영/정비를 위한 정보요건 분석)

  • Lee, Won-Hyung;Kim, Woo Jung;Byon, Sujin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.276-277
    • /
    • 2013
  • Complex facilities and major equipment in nuclear power plants check to use analog measuring device. Operating and maintenance using 3D data for geometric information management method, which is a virtual reality technology development is urgently needed. Therefore, this paper defines the information requirements for the implementation of a virtual reality-based technology in nuclear power plant. Furthermore developing owner requirements for applying the virtual reality-based technology is purpose.

  • PDF

A Study on the Cost Estimate System Development Method for Nuclear Power Plant Construction Projects

  • Lee, Sang Hyun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.133-137
    • /
    • 2017
  • Nuclear power plants in Korea are usually built based on a duplicated model; so the project cost data of the preceding unit can be used as reference when estimating the project cost for the succeeding unit. However, since the contracting method is oriented towards the price, empirical factors such as making top-down estimations using the reverse calculation method based on the completion cost of the preceding unit is dominant. In order to develop a project cost database to resolve such problems, the detailed cost boundary of the project cost data must be categorized by project and by system. This study proposes a method to connect the code of account with the base quantities and the IAEA account, and proposes a database structure for the development of a project cost estimation system. The estimation system developed in the future is expected to utilize the proposed project cost data structure.

  • PDF