• Title/Summary/Keyword: New plan site

Search Result 234, Processing Time 0.027 seconds

The Scheme of Making Pension Community Based on the Factual Analysis of Pensions Near Urban Areas of Seoul (수도권 펜션의 실태 분석에 의거한 펜션단지 조성 방안)

  • Kim, In-Ho;Kim, Shin-Won
    • Journal of Korean Society of Rural Planning
    • /
    • v.9 no.1 s.18
    • /
    • pp.27-35
    • /
    • 2003
  • As the modern societies have become complicated and diverse, people's interest in "leisure time" has been higher than ever before, especially in relation to 5 day work a week. The increasing weekend trip and the travlers' demand for the better service and the convenient accomodations gave birth to "Pension" as one of accomodations in Korea. This study focuses on the attempt to plan and design the establishment of the competitive "Pension" which are popular between travelers in their twenties and thirties living in cities. This study also attempts to find the solution of the problems in relation to the actual conditions of the pensions which are built and under construction, and to suggest a new revised concept of pension. The summary is as follows: 1. This study focuses on the special theme of building Mo-Hyun Myon pension community with originality and new style of management. 2. This study includes the introduction of the special agency which makes reservations, promotes, and manages for the convenience of customers and buyers. 3. It pianos to secure the public area for various events and rests. 4. The geographical features of the site where the complex stands will be fully utilized to maximize the beauties of nature.

Examination of Obstacles Impeding the Deployment of New Construction Technologies On-Site and Development of an Activation Strategy (건설신기술의 현장활용 저해요인 분석 및 활성화 방안)

  • Park, Hwan Pyo;Bae, Byung Yun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.4
    • /
    • pp.369-380
    • /
    • 2023
  • The incorporation of innovative technology systems into domestic construction practices has catalyzed an organic evolution of the industry, significantly enhancing the level of domestic construction technology and intensifying competitiveness. In particular, the on-site implementation of these groundbreaking construction technologies has proven effective in diminishing construction costs and accelerating project timelines. Nevertheless, despite a period of 33 years since the inception of this new construction technology system, both the volume of designated construction technologies and their practical application on construction sites remain static. As a consequence, this study introduces a strategic plan to dissect and overcome the barriers faced in the adoption of new construction technology across a multitude of sectors. The chief outcomes encompass the inception of a new construction technology utilization surveillance system, an assessment of distinct technologies, refinement of the post-evaluation system, and the creation of a new technology market system. This systematic enhancement is anticipated to foster the practical application of new construction technologies within the industry.

Planning for the Yeonin Mountain Provincial Park (연인산 도립공원 조성계획)

  • Lee, Jun-Bok
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.35 no.1 s.120
    • /
    • pp.9-19
    • /
    • 2007
  • This plan was submitted as part of an invited competition for the provincial park planning of Yeonin Mountain, which was held by the Gyeonggi Innovation Corporation in November, 2006. The proposed site is located at Seungan-ri, Gapyung-eup, Gapyung-gun, Gyunggi-do and covers about $150,010m^2$. The main goal of this project is to "Suggest a New Park Paradigm" by shedding old ways of thinking about parks through an integrated development concept. Planning was approached as follows: First, providing an unique theme to the support facilities area of Yeonin Mountain Piovincial Park. To achieve this theme, the Seungan support facilities area was designated to be home to a Seven Colored Theme Garden, currently named the Native Wild-flower Garden, while the Baekdun facilities area is to be centered on a Self-loaming Forest Camp, which will give the chance of a hands-on wildlife experience. With these themes, which create recreational goals that will encourage not only tourism but education as well, the foundation was laid for a multi-purpose park paradigm. Second, Developing a Core Facility Zone. To accomplish the development of a core facility zone, park buildings will be arranged in accordance with an integrated building lay-out for easy access and use, and the facilities specified by design for the Seven Colored Theme Garden are provided for the newly prepared site. This will allow focus on the user's viewpoint instead of the view of the planner or of ease of maintenance.

Evaluation of Current Preparing Status for Experimental Practice by Faculty of Clinical Pharmacy in Korea (임상약학 담당교수에 의한 한국 약학전문대학원의 실무실습준비 현황 평가)

  • Lee, Ok Sang;Lim, Sung Cil
    • YAKHAK HOEJI
    • /
    • v.57 no.3
    • /
    • pp.219-225
    • /
    • 2013
  • The Korean pharmacy education has introduced new curriculum since 2011. In the new curriculum, pharmacy students have been provided strenthen experimental education and clinical pharmacy has been more important than previous curriculum. Thus, faculties in the college of pharmacy should prepare the circumstances correlated with the changed curriculum. To accomplish successful setting, all faculty and practice experts must work together and need financial assisstant from the college. However, there are many different obstacles among 35 colleges of pharmacy in Korea. In order to narrow a gap among students and find the way to overcome it together, we studied the problem of preparation process in Korean colleges of Pharmacy. We studied the process of practical education in college of pharmacy by means of self-reporting questionnaire from November 29th 2012 to December 31th 2012. The questionaire comprised of syllabus related to clinical pharmacy, the number of professor in charge of clinical pharmacy or pharmacotherapeutics, the plan of securing faculties in the field of clinical pharmacy, the budget, site, instrument for preparing experimental education, the lesson time number of experimental education, MOU, education and treatment of preceptor in the practice site and committee of experimental education in the college. Total 21 of 35 colleges participated in this survey. They showed different composition of syllabus, budget, the circumstances of experimental education, the education and treatment of preceptor. Most colleges are unclear the site and preceptor of experimental education and they did not contract the MOU with the sites. 9 of 21 also did not have the committee of experimental education in the colleges. From 2013, some colleges of pharmacy start actual experimental education. Inadequete preparation and different quality of education can make student incomplete pharmacists, so it will be negative effect on public health. To overcome challenge and obtain desirable goal, funding/administrative assistant from the college and networking within 35 colleges of pharmacy are needed.

A Study on the Planning Indicator for Carbon Neutral Green City (탄소중립 녹색도시 구현을 위한 계획지표 설정에 관한 연구)

  • Kim, You-Min;Lee, Joo Hyung
    • KIEAE Journal
    • /
    • v.13 no.2
    • /
    • pp.131-139
    • /
    • 2013
  • The aim of this dissertation is establishing internal indicator list for achieving policy goal of Carbon Neutrality Green City. First of all, it started to construct the basic system of planning indicator based on through comprehension of current studies such as advanced researches, government guidelines and green building certifications. And then it was set up final indicator list through inspecting FGI (Focus Group Interview), Verification of suitability, and Analysis of importance). As a result of this research, the planning indicator divided three steps and there were classified four fields in the top-level; Green Land and Ecology, Green Energy, Green Resource and Transportation, Green Living and Institution. According to the data, it deducted four items (ratio of green land, site plan, heat island and management of climate, base of nature ecology) and twelve index in the field of green land and ecology, three item(energy conservation and self-supporting, energy efficiency, new regeneration energy) and twelve index in the field of green energy and regeneration, five items(water resources utilize and circulation, other resource reduction and circulation, public transportation, green transportation plan) and fifteen index. Totally, Planning Indicators of forty nine were deducted. Therefore, there was the result of importance analysis that the indicators of plan and maintain management as the side of space for carbon neutrality were more appreciated than carbon reduction of individual building.

Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System (인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

A Study on the Efficient Use of Public Facility Site in the 1st Generation New Town: Focused on Pyeongchon New Town (수도권 1기 신도시 공공시설부지의 효율적 이용 방안 연구: 평촌신도시를 중심으로)

  • Kim, Seong-Hee;Kim, Joong-Eun;Shim, Gyo-Eon
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.3
    • /
    • pp.572-583
    • /
    • 2020
  • The purpose of this study is to find out how to effectively utilize the public facilities site that is being used in the new town for the expansion of newly required public facilities, because it is difficult to carry out redevelopment projects in apartment complexes of 1st generation new town due to the rigidity of land use and macroeconomic conditions. This study examined the following three ways to effectively utilize existing public facilities sites for Pyeongchon new town. First, it suggested how to secure the parking lot by deciding multi-dimensional urban planning facility of public facilities such as parks and schools in superblock that lacks parking space of apartment complex. Second, it suggested a plan to accommodate the demands of public facilities required by increasing the building density of existing public buildings in commercial district as an example of the Anyang Tax Office. Lastly, it suggested a way to install additional functions required by users through the reorganization of the existing public facilities and some extensions by examining the Pyeongchon library.

Participatory Design Process for the Utilization of the Military Relocation Site - The Case of the Idea Competition for the Fukaya Communication Site in Yokohama - (군기지 이전지 활용에 관한 참여설계과정 - 요코하마 후카야 통신소 이전지 아이디어 공모사업 사례 -)

  • Park, Ji-Hyun;Son, Yong-Hoon;Tsuge, Kiharu
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.3
    • /
    • pp.10-25
    • /
    • 2011
  • Since 1950, the city of Yokohama has been demanding the return of US. military base sites in Yokohama. Yokohama has established a systematic utilization plan for these relocation sites. The Fukaya communication site is one of former US. military bases verified for return in 2004. The Fukaya communication site is distinctively circular in shape and is entirely national land. Yokohama took an idea competition to its citizens to create a new park at the relocation of the Fukaya communication site, involving lots of citizen opinion in its utilization goals. This study determined the process of the idea competition at the Fukaya communication site in encouraging civic participation and analyzing citizen demands for the utilization of the relocation site. Through the idea competition, Yokohama city was able to obtain several ideas on the new park from various angles such as the function and shape of the urban open spaces. Citizens showed great interest in creating a park as green infrastructure on the Fukaya communication site. In addition, beyond utilization as an urban open space, many ideas suggested new lifestyles for the region in connection with the natural environment in the vicinity. Yokohama city tried to share the process and results of the idea competition with as many citizens as it could through a variety of means such as Participation, Judging, Support, Observation and Understanding. The case study on the idea competition at the Fukaya communication site is a good example of community design practice in public projects, and is full of suggestions for military bases in Korea, which has just established the plan of utilizing relocation sites as parks. Based on this case study, it can be concluded that it is important to make a systemic form for utilization planning with a clear process, open information and partnership in a variety of participatory design processes in order to ensure maximum civic utilization of relocation sites.

A Survey Study on the Status and Standards of School Area (초.중등학교 교지(校地) 면적 및 관련 기준(基準)에 관한 조사 연구)

  • Lee, Hwa-Ryong;Dong, Jae-Wook
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.17 no.3
    • /
    • pp.3-11
    • /
    • 2010
  • This survey study aims to explore the school area standards for elementary, middle and high schools. Traditionally the school site has been recognized as a space of teaching and learning for students. Though its functions and needs have recently been changing from the areas for physical education and training to for various activities such as recreation, play, communication, informal and social areas etc. Moreover the school site is also a critical component of community life. Many communities have a significant shortfall in the amount of park and open space land available and accessible for use. In this viewpoint the standards of school facilities should develop a comprehensive approach to insure that students and residents are provided the opportunity to engage in appropriate types and amounts of everyday's activities during the school day and after school. In doing so, it surveys the school areas of the existing schools and the new schools built in Dongtan City. Finally, it points out the problems of government's regulation for school facilities and proposes the adequate directions for school area standards. This study would help to plan the optimum size of school area and ground and the reasonable expenditure for school facilities.

A Study on the Selection of New Town Area Using GIS -in Mongolia - (GIS를 이용한 신도시개발 가능지역 선정 연구 -몽골지역을 대상으로-)

  • Choi, Byoung-Gil;Na, Young-Woo
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.28 no.2
    • /
    • pp.273-280
    • /
    • 2010
  • This study aims to research into a plan for the spatial design on the major facilities in new-town region in Mongolia by using the spatial analytical technique in GIS. In case of Mongolian region, the demand for new-town development is rapidly increasing around Ulaanbaatar, where is the capital. On the other hand, the adequately relevant ground or the spatial-design technique is failing to be applied. This study extracted the region available for developing new down by using spatial analytical technique in GIS, and researched into the spatial-design plan for housing complex, filtration plant, sewage disposal plant, power plant, general park, crematory. The housing complex in the targeted region could be known to be adequate to be positioned around watercourse and road. It could be known to be adequate for filtration plant, which is the source of drinking water, to be located in the upper-stream region of a river, which is secured good quality of water, and for sewage disposal plant to be located in the lower-stream region available for minimizing occurrence of contamination. It is judged to be required for a proposed site of power plant to be located in the upper-stream region, for the park unit, which is space of the living culture, to be repaired and expanded the existing facilities, and for traffic network to be expanded through predicting demand along with new-town development. It is judged to be probably needed to be reflected even the flexible aspect for changing design through surveying the feasibility and economic efficiency on the future spatial design.