• Title/Summary/Keyword: Nam river watershed

Search Result 95, Processing Time 0.034 seconds

Selection of Priority Management Target Tributary for Effective Watershed Management in Nam-River Mid-watershed (남강 중권역의 효율적인 유역관리를 위한 중점관리 대상지류 선정)

  • Jung, Kang-Young;Kim, Gyeong-Hoon;Lee, Jae-Woon;Lee, In Jung;Yoon, Jong-Su;Lee, Kyung-Lak;Im, Tae-Hyo
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.4
    • /
    • pp.514-522
    • /
    • 2013
  • The major 24 tributaries in Nam-River mid-watershed were monitored for discharge and water quality in order to understand the characteristics of the watershed and to select the tributary catchment for improving water quality. According to the analytical results of discharge and water quality monitoring data of 24 tributaries, the mean value of discharge below $0.1m^3/s$ was 62.5% among the monitored tributaries and it mostly exceeded the water quality standards of Nam-river mid-watershed ($BOD_5$ = 3 mg/L, T-P = 0.1 mg/L over). According to the stream grouping method and the water quality delivery load density ($kg/day/km^2$) based on the results of tributary discharge and water quality monitoring, the tributary watersheds for improving the water quality were selected. In the Nam-River mid-watershed, tributaries in the GaJwaCheon, HaChonCheon catchment (Group D, $BOD_5$ = 3 mg/L over) and in the UirYeongCheon, SeokGyoCheon catchment (Group A, T-P = 0.1 mg/L over), which have a small flow (and/or large flow) and a high concentrations of water pollutants. The various water quality improving scheme for tributaries, in accordance with the reduction of potential point source pollution by living sewage and livestock wastewater, should be established and implemented.

A Study on Instream Flow for Water Quality Improvement in Lower Watershed of Nam River Dam (남강댐 하류유역 수질개선 필요유량 산정에 관한 연구)

  • Kim, Gyeong-Hoon;Jung, Kang-Young;Lee, In-Jung;Lee, Kyung-Lak;Cheon, Se-Uk;Im, Tae-Hyo;Yoon, Jong-Su
    • Journal of Korean Society on Water Environment
    • /
    • v.30 no.1
    • /
    • pp.44-59
    • /
    • 2014
  • Despite the implementation of TMDL, the water quality in lower watershed of Nam river dam has worsened continuously since 2005. Multifarious pollution sources such as cities and industrial districts are scattered around it. Nam river downstream bed slope is very gentle towards the downstream water flow of slows it down even more, depending on the water quality deterioration is accelerated eutrophication occurs. In this study, the mainstream in lower watershed of Nam river dam region to target aquatic organic matter by phytoplankton growth contribution was evaluated by statistical analysis. and statistical evaluation of water quality and the accuracy of forecasting, model calibration and verification procedures by completing QUALKO2 it's eutrophic phenomena that occur frequently in the dam outflow through scenarios predict an increase in water quality management plans to present the best should.

A Study on BASINS/WinHSPF for Evaluation of Non-point Source Reduction Efficiency in the Upstream of Nam-Han River Watershed (BASINS/WinHSPF를 이용한 남한강 상류 유역의 비점오염원 저감효율평가)

  • Yoon, Chun-Gyeong;Shin, Ah-Hyun;Jung, Kwang-Wook;Jang, Jae-Ho
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.6
    • /
    • pp.951-960
    • /
    • 2007
  • Window interface to Hydrological Simulation Program-FORTRAN (WinHSPF) developed by the United States Environmental Protection Agency (EPA) was applied to the upstream of Nam-Han river watershed to examine its applicability for loading estimates in watershed scale and to evaluate non-point source control scenarios using BMPRAC in WinHSPF. The WinHSPF model was calibrated and verified for water flow using Ministry of Construction and Transportation (MOCT, 3 stations, 2003~2005) and water qualities using Ministry of Environment (MOE, 5 station, 2000~2006). Water flow and water quality simulation results were also satisfactory over the total simulation period. But outliers were occurred in the time series data of TN and TP at some regions and periods. Therefore, it required more profit calibration process for more various parameters. As a result, all the study was performed within the expectation considering the complexity of the watershed, pollutant sources and land uses intermixed in the watershed. The estimated pollutant load for annual average about $BOD_5$, T-N and T-P respectively. Nonpoint source loading had a great portion of total pollutant loading, about 86.5~95.2%. In WinHSPF, BMPRAC was applied to evaluate non-point source control scenarios (constructed wetland, wet detention ponds and infiltration basins). All the scenarios showed efficiency of non-point source removal. Overall, the HSPF model is adequate for simulating watersheds characteristics, and its application is recommended for watershed management and evaluation of best management practices.

Development of Flood Map Using Geographic Information System (GIS기반 홍수예측지도의 개발)

  • Kim Sang-Ho;Kim Han-Joong;Lee Nam-Ho;Kim Seong-Joon
    • Proceedings of the KSRS Conference
    • /
    • 2006.03a
    • /
    • pp.36-40
    • /
    • 2006
  • The objective of the study is to develop a GIS-based flood map. Hydraulic model (HEC-RAS) is linked with hydrologic model (HEC-HMS) for flood map. Geospatial data processors, HEC-GeoHMS and HEC-GeoRAS, are used for operating HEC-HMS and HEC-RAS. HEC-HMS was calibrated and validated at the Hwa-Ong watershed. HEC-HMS was used for calculating runoff from the Hwa-Ong watershed which consisted of Nam-Yang, Ja-An, U-Eun river sub-watersheds, and HEC-RAS was applied and validated for river flow routing at the Hwa-Ong watershed. The simulated results from HEC-HMS and HEC-RAS were reasonably good compared with the observed data. HEC-RAS and HEC-HMS were applied to simulate flooding from probability rainfall at the Hwa-Ong watershed, and the simulated result was used to develop a flood map. Flood map developed in this study will be used for mitigating and predicting the flood damages.

  • PDF

Effect of Change in Hydrological Environment by Climate Change on River Water Quality in Nam River Watershed (기후변화에 따른 남강유역의 수문환경의 변화가 하천수질에 미치는 영향)

  • Kang, Ji Yoon;Kim, Young Do;Kang, Boo Sik
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.8
    • /
    • pp.873-884
    • /
    • 2013
  • In Korea, the rainfall is concentrated in summer under the influence of monsoon climate. Thus, even a small climate change can be significant problems in water resources. As a result, a lot of attention has been focused on climate changes and a number of researches have been conducted in a manner commensurate with the attention to the climate change. This study is intended to forecast the changes in the flow and water quality of the Nam river resulting from the future climate changes in the Nam river basin using a watershed and water quality model. An SWAT model, as a watershed hydrologic model, was established after estimating a climate scenario using an artificial neural network method, and the established model was verified and adjusted using date from the Ministry of Environment to evaluate the applicability of the model. As a consequence, $R^2$ showed more than 0.7 in the simulation test, which satisfies the minimum required level. Results from the SWAT model and the future Namgang dam discharge calculated by HEC-ResSIM is used as input date for QUALKO. The results showed a huge variation in BOD depending on the annual flow of the river, which recorded a maximum difference of 2 mg/L between a rainy season and a dry season. It can be deduced that because rainfall and the runoff of a basin significantly account for the water quality of a river, higher water concentrations are recorded in a dry season in which the flow is not as much as that in a rainy season. It also can be said that water should be reserved in advance to secure water in the Nam river downstream for a dry season and be controlled in an effective and efficient manner to provide better water quality.

Operation of Seom River Experimental Watershed in 2007 (2007년 섬강 시험 유역의 운영)

  • Lee, Min-Ho;Choi, Hung-Sik
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.699-702
    • /
    • 2008
  • In this study, it has observed the precipitation and stage data at each point every ten minutes for gaining the sustainable, reliable and high-quality hydrological data through operating the experimental watershed in mountainous areas such as Gyecheon located in the upstream of Seom river that is the tributary of Nam-Han river. And it has regularly surveyed the runoff and verified the reliability of data using the uncertainty analysis at the gaging station. So, this study has developed the stage-discharge curve(rating curve) and these results are expected to be used as fundamental data for analyzing the circulation of water through surveying evapotranspiration, soil moisture and level of groundwater in watershed.

  • PDF

Analysis of Specific Contaminated Status and Pollutant Loads Contribution Rate of the Tributaries in Gumho and Nam River Basin (금호강, 남강 중권역 지류·지천의 상세오염 현황 및 오염기여율 조사)

  • Na, Seungmin;Kwon, Heongak;Kim, Gyeong Hoon;Shin, Dongseok;Im, Tae Hyo
    • Journal of Wetlands Research
    • /
    • v.18 no.4
    • /
    • pp.363-377
    • /
    • 2016
  • This study was investigated the pollutant load, contamination properties, pollution condition of the fine parts of tributary, the influence of Nakdong river watershed and etc. in the tributaries. The contaminated tributaries were that among the Kumho and Nam river or were too far from site of water quality monitoring stations, regularly. As a result, the water quality level was almost similar between Nam and Kumho River, except for certain parameter including TN(Total Nitrogen), Chl-a(Chlorophyll-a) and SS(Suspended Solid) in which Kumho river were 20~120%. The point discharge load(kg/day) and load density ($kg/day/km^2$) of tributaries were different the pollution level according to the flow-rate ($m^3/sec$) and stream influence area($km^2$), and the difference of these was observed highly at Nam river. Specific contamination investigation of tributaries in Nam and Kumho river watershed was conducted from two to nine points of the fine parts of tributaries depending on the confluence sites and shapes. This result observed high at the Dalseocheon and Uriyeongcheon, respectively. Beside, the pollutant load contribution rate of Nakdong watershed was high about 10% at the Dalseocheon and Uiryeongcheon. This was due to the differences of the environments about the industrial complex, metropolis residence property, agricultural cultivation, livestock pen and the downstream of non-point source.

Water Quality Prediction and Forecast of Pollution Source in Namgang Mid-watershed each Reduction Scenario (남강중권역 오염부하 전망 및 삭감 시나리오별 하류 수질예측)

  • Yu, Jae Jeong;Shin, Suk Ho;Yoon, Young Sam;Kang, Doo Kee
    • Journal of Environmental Impact Assessment
    • /
    • v.21 no.4
    • /
    • pp.543-552
    • /
    • 2012
  • Namgang mid-watershed is located in downstream of Nakdong river basin. There are many pollution sources arround this area and it's control is important to manage a water quality of Nakdong river. A target year of Namgang mid-watershed water environment management plan is 2013. To predict a water quality at downstream of Namgang, we have investigated and forecasted the pollutant source and it's loading. There are some plan to construction the sewage treatment plants to improve the water quality of Nam river. Those are considered on predicting water quality. As results, it is shown that the population is 343,326 and sewerage supply rate is 79.2% and the livestock is 1,662,000 in Namgang mid-watershed. It is estimated that the population is 333,980, the sewerage supply rate is 86.9% in 2013. The milk cow and cattle were estimated upward and the pigs were downward by 2013. The generated loading of BOD and TP is 75,957 kg/day and 4,311 kg/day, discharged loading is 18,481 kg/day and 988 kg/day respectively in 2006. It were predicted upward the discharged loading of BOD and TP by 4.08% and 6.3% respectively. The results of water quality prediction of Namgang4 site were 2.5 mg/L of BOD and 0.120 mg/L of TP in 2013. It is over the target water quality at that site in 2015 about 25.0% and 9.1% respectively. Consequently, there need another counterplan to reduce the pollutants in that mid-watershed.

Web-based GIS for Real Time Hydrologic Topographical Data Extraction for the Geum River Watershed in Korea (Web기반 GIS를 이용한 금강유역의 실시간 수문지형인자 추출)

  • Nam, Won-Ho;Choi, Jin-Yong;Jang, Min-Won;Engel, B.A.
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.49 no.5
    • /
    • pp.81-90
    • /
    • 2007
  • Watershed topographical information is required in hydrologic analysis, supporting efficient hydrologic model operation and managing water resources. Watershed topographical data extraction systems based on desktop GIS are abundant these days placing burdens for spatial data processing on users. This paper describes development of a Web-based Geographic Information Systems that can delineate the Geum River sub-basins and extract watershed topographical data in real time. Through this system, users can obtain a watershed boundary by selecting outlet location and then extracting topographical data including watershed area, boundary length, average altitude, slope distribution about the elevation range with Web browsers. Moreover, the system provides watershed hydrological data including land use, soil types, soil drainage conditions, and NRCS(Natural Resources Conservation Service) curve number for hydrologic model operation through grid overlay technique. The system operability was evaluated with the hydrological data of WAMIS(Water Management Information System) with the government operation Web site as reference data.

Evaluation of SWAT Model Applicability for Runoff Estimation in Nam River Dam Watershed (남강댐 상류 소유역의 유출량 추정을 위한 SWAT 모형의 적용성 평가)

  • Kim, Dong-Hyeon;Kim, Sang-Min
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.58 no.4
    • /
    • pp.9-19
    • /
    • 2016
  • The objective of this study was to evaluate the applicability of SWAT (Soil and Water Assessment Tool) model for runoff estimation in the Nam river dam watershed. Input data for the SWAT model were established using spatial data (land use, soil, digital elevation map) and weather data. The SWAT model was calibrated and validated using observed runoff data from 2003 to 2014 for three stations (Sancheong, Shinan, Changchon) within the study watershed. The $R^2$ (Determination Coefficient), RMSE (Root Mean Square Error), NSE (Nash-Sutcliffe efficiency coefficient), and RMAE (Relative Mean Absolute Error) were used to evaluate the model performance. Parameters for runoff calibration were selected based on user's manual and references and trial and error method was applied for parameter calibration. Calibration results showed that annual mean runoff were within ${\pm}5%$ error compared to observed. $R^2$ were ranged 0.64 ~ 0.75, RMSE were 2.51 ~ 4.97 mm/day, NSE were 0.48 ~ 0.65, and RMAE were 0.34 ~ 0.63 mm/day for daily runoff, respectively. The runoff comparison for three stations showed that annual runoff was higher in Changchon especially summer and winter seasons. The flow exceedance graph showed that Sancheong and Shinan stations were similar while Changchon was higher in entire fraction.