• Title/Summary/Keyword: NATM method

Search Result 152, Processing Time 0.022 seconds

Development of High Performance Shotcrete for Permanent Shotcrete Tunnel Linings II(II: Application of high-early strength cement in sump water condition) (Permanent Shotcrete Tunnel Linings 구축을 위한 고성능 숏크리트 개발 II (II: 용수부에서의 조강시멘트 적용))

  • 박해균;이명섭;김재권;안병제
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.10a
    • /
    • pp.695-702
    • /
    • 2002
  • Shotcrete (or Sprayed concrete) has been used as an important support material in New Austrian Tunnelling Method (NATM). Since the mid of 1990, permanent shotcrete tunnel linings such as Single-shell, NMT (Norwegian Method of Tunnelling) has been constructed in many countries for reducing the construction time and lowing construction costs instead of conventional in-situ concrete linings. Among essential technologies for successful application of permanent shotcrcte linings, high performance shotcrete providing high strength, high durability, better pumpability has to be developed in advance as an integral component. This paper presents the Ideas and first experimental attempts to increase early strength and bond strength of wet-mixed Steel Fiber Reinforced Shotcrete(SFRS) in sump water condition. In order to increase early strength, a new approach using high-early strength cement with liquid alkali-free accelerator has been investigated From the results, wet-mix SFRS with high-early strength cement and alkali-free accelerator exhibited excellent early strength improvement compared to the ordinary portland content and good bond strength even under sump water condition.

  • PDF

The Ground Reinforcement on Daylight Collapsed Block in Driving Work at the National Road No. 3 Line (국도 3호선 터널건설 공사 중 붕락구간에 대한 지반보강)

  • 천병식;정덕교;이태우;정진교
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.02a
    • /
    • pp.14-22
    • /
    • 1999
  • Daylight collapse have been occurred by about 6.$^{0}$ m deep at ground surface which connected to the ground surface and excessive overbreak have been occurred by the space and height of 3.$^1$~6.$^2$m at crown head part of the tunnel during tunnelling of lower-half part after completing upper-half part on tunnelling of a phyllite mountain by NATM method at the construction work of two way-double track national road. This study is a successful illustration case of earth improvement by confirming structural safety of the tunnel in a whole through solving the cause of the tunnel collapse and the work have completed successfully through applying such earth strengthening method as cement mortarㆍcement milk injection, S.G.R, steel pipe reinforced multi-step grouting etc.

  • PDF

Development of High Performance Shotcrete for Permanent Shotcrete Tunnel Lining(I : Application of New Type Accelerator for High Strength Shotcrete) (Permanent Shotcrete Tunnel Lining 구축을 위한 고성능 숏크리트 개발( I : 고강도 숏크리트 개발을 위한 새로운 급결제 적용))

  • 박해균;이명섭;김재권;안병제
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.1023-1030
    • /
    • 2002
  • From the early 1980s, the New Austrian Tunnelling Method (NATM) has been developed as a one of the standard tunneling method in Korea. Approximately 10 years ago, wet-mix shotcrete with sodium silicate accelerator (waterglass) was introduced and widely used to tunnel lining and underground support. However, this accelerator had some disadvantages due to the decrease of long-term strength compared to plain concrete (without accelerator) and low quality of the hardened shotcrete. In order to compensate for these disadvantages, recently developed alkali-free accelerator has been successfully demonstrated in numerous projects and applications as a new material to make tunnels more durable and safer. An experimental investigation was carried out in order to verify the strength behavior of wet-mix Steel Fiber Reinforced Shotcrete (SFRS) with alkali-free accelerator. Compressive strength, flexural strength and equivalent flexural strength were measured by testing specimens extracted from the shotcrete panels. From the results, wet-mix SFRS with alkali-free accelerator exhibited excellent strength improvement compared to the conventional shotcrete accelerator.

  • PDF

Design and Construction Problems of Semi-Shield Method (SEMI-SHIELD 공법의 설계 및 시공상 문제점)

  • Kim, Jong-In;Jung, Sung-Nam;Park, Yeong-Geon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1275-1282
    • /
    • 2009
  • The tunnel excavations are used for construction of common utility tunnel, electric tunnel, communication line tunnel, water supply and public sewerage pile line in urban area. The trench cut methods were mainly used in the past, but now, tunneling method is more being used. The tunnel excavation method like as NATM, Messer-Shield, Semi-Shield Methods are being applied to small section tunnel in Korea. The actual construction results of seme-shield method are increasing due to simplified construction process and reduced noise and vibration. And also this method is being used frequently in waterway tunnel and construction of prevention flooding recently. The seme-shield method design guideline is absence except for electric line tunnel construction in Korea, because of the semi-shield method was developed in Europe and Japan. In the prescriptive design, engineer's subjects are tending to intervene, because of absence of standard and specification for details. Therefore, Design and Construction Problems of Semi-Shield Method were described and construction trouble was introduced for exam. These problem and construction troubles have to be examined thoroughly in advance.

  • PDF

A study on the effect of blasting vibration and the optimal blasting offset according to the depth of tunnel (터널 심도에 따른 발파 진동 영향 및 최적 발파 이격거리 연구)

  • Kong, Suk-Min;Choi, Sang-Il;Kim, Yeong-Bae;Noh, Won-Seok;Kim, Chang-Yong;Lee, Seong-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.483-494
    • /
    • 2022
  • Owing to the saturation of ground spaces in downtown areas, underground spaces are being developed increasingly. Underground spaces are utilized for transportation, water supply and sewerage, communication zones, electric power zones, and various cultural complexes. In Korea, for excavating underground spaces, blasting methods using gunpowder such as the New Austrian Tunneling Method (NATM) are mainly used. However, the blasting method causes vibration and noise during tunnel excavation, generating many complaints from residents in the vicinity of the excavation site. To address this problem, various methods have been developed, and recently, vibration and noise have been reduced using deep excavation. This study predicts blast vibration changes according to the depth, under the same blasting and tunnel conditions, using numerical analysis based on the blast vibration measurement data of the GTX-A route, the tunnel cross-section drawings, and ground investigation reports. Furthermore, the necessary separation distance from densely populated areas such as residential areas is suggested by analyzing the trend of decreasing blast vibration according to the distance from ground surface directly above the blasting location.

A Study on the Evaluation of Environmental Load Based on LCA Using BIM - Focused on the Case of NATM Tunnel - (BIM을 활용한 LCA기반 환경부하평가에 관한 연구 - NATM 터널 사례 중심으로 -)

  • Lee, Yang-Kyoo;Han, Jung-Geun;Kwon, Suk-Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.3
    • /
    • pp.477-485
    • /
    • 2018
  • To control manage environmental load during construction work, it is required to ascertain an accurate quantity for materials those are using during the construction. In construction industrial nowadays, especially on design part, there are lots of mistakes occurred on quantity take-off between plan documents and actual work. That mistakes are caused by omission of design items, overcount because of interference each materials or simple calculate error. Besides, in case of a construction project, engineers are impossible to design perfectly due to a lot of invalid variable in a construction site. Thus, design errors and changes occur frequently in the process of construction work or design due to such unclear elements. And in case of LCA assessment based on 2D design, there is difficult for an engineer who is in charge to calculate the volume of materials manually using drawings and relevant specifications. This study is aimed for examining and verifying a high reliable method of evaluating environmental load which is useful in construction process through comparing LCA analysis. In addition, this study provides the method of calculating the volume of materials and LCA assessment in working on the basis of 2D design, using the specifications which is used for LCA evaluation, and possibility of utilizing the LCA assessment by introducing BIM design technic to improve the former problem through comparing and analyzing the previous method with 3D-based evaluation process.

A Study on Standard Construction Process Management System for Prediction of Proper Construction Period of Subsea Tunnel (해저터널 적정 공사기간 예측을 위한 표준공정관리 체계 연구)

  • Bae, Keunwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.36-47
    • /
    • 2017
  • As a typical domestic subsea tunnel construction the Gadeok subsea tunnel applying the method of immersed tunnel has been completed and the Boryeong-Taean subsea tunnel is under construction using NATM. The high-speed railway subsea tunnels between the Honam and Jeju are under consideration, and the feasibility of constructing subsea tunnels with Japan and China is also under consideration. However, it is difficult to provide the process plan information for the construction work such as the analysis of the feasibility of the subsea tunnel and the prediction of the proper construction period because there is no case of domestic construction for it applying the shield TBM method. Due to economic and other reasons, government organizations are reluctant to apply the shield TBM, and there is lack of data on the construction process management field using the shield TBM method. Therefore, a standard construction process management system for the subsea tunnel is needed to analyze the feasibility of the subsea tunnel and to predict the proper construction period. By presenting the standard construction process management system of subsea tunnels such as WBS, Network Diagram, and construction period calculation model, I hope to contribute technically and economically to future subsea tunnel projects.

Design on the large section of station tunnel under shallow overburden (저토피고 대단면 정거장터널의 설계)

  • Jeong, Yun-Young;Choi, Hae-Joon;Kim, Byung-Ju;Yu, Bong-Won;Kim, Yong-Il;Oh, Sung-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.2
    • /
    • pp.171-182
    • /
    • 2007
  • For minimizing the effect on the focus of civil traffic and environment conditions related to the excavation at the traffic jamming points, an underground station tunnel was planned with 35.5 m in length and bigger area than $200\;m^2$ in sedimentary rock mass. It faced the case that the overburden was just under 13 m. Not based on a pattern design but on the case histories of similar projects and arching effect, the design of large section tunnel under shallow overburden was investigated on three design subjects which are shape effect on the section area, application method of support pressure, and supporting and tunnel safety. According to the mechanical effect from section shape, a basic design and a preliminary design was obtained, and then supporting method of large section was planned by the supporting of NATM and a pipe roof method for subsidence prevention and mechanical stability. From the comparative study between both designs, it was found that the basic design was suitable and acceptable for the steel alignment of tunnel lining, safety and the design parameter restricted by the limit considered as partition of the excavation facilities. Through the analysis result of preliminary design showing the mechanical stability without stress concentration in tunnel arch level, it also was induced that shape effect of the large section area and yielding load obtained from deformation zone in the surrounding rock mass of tunnel have to be considered as major topics for the further development of design technique on the large section tunnel.

  • PDF

Evaluation of Radon Exposure During Highway Tunnel Construction by New Austrian Tunneling Method (NATM 공법에 의한 고속도로 터널 공사 중 라돈 노출 평가)

  • Ye-Ji Yu;Hyoung-Ryoul Kim;Mo-Yeol Kang;Sangjun Choi
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.33 no.2
    • /
    • pp.115-125
    • /
    • 2023
  • Objectives: This study was conducted to measure the level of radon in the air at a highway tunnel construction site in a gneiss area using the New Austrian Tunneling Method (NATM) and to evaluate exposure levels by occupation. Methods: Radon concentrations in the air were measured using E-PERM at points 300 m, 600 m, and 900 m from the tunnel entrance during the excavation and waterproofing work inside the tunnel. In addition, radon concentrations were measured during external excavation to compare with the inside of the tunnel. Personal exposure levels for major occupations including tunnel workers, construction equipment operators, waterproofers, shotcrete workers, and safety and health managers who participated in the construction were estimated using radon concentration measured in the work process area and working hours by occupation. Results: As a result of a total of 77 radon measurements, the geometric mean (GM) concentration was 71.1 Bq/m3, and the maximum concentration was 127.3 Bq/m3, which was below the indoor air quality criteria. Radon concentration by process decreased in the order of the tunnel excavation process (GM= Bq/m3, GSD=1.2), waterproofing process (GM=73.35 Bq/m3, GSD=1.2), and outside excavating process (GM=45.28 Bq/m3, GSD=1.2). Processes inside the tunnel were significantly higher than outside excavating processes (p<0.05). There was no statistically significant difference in radon concentration measured inside by distance from the tunnel entrance, but the innermost point of the tunnel, 900 m (GM=79.24 Bq/m3, GSD=1.27), measured the highest. Conclusions: The occupation with the highest individual exposure to radon was tunnel worker (64.16 Bq/m3), followed by construction equipment driver (64.04 Bq/m3) and waterproofer (63.13 Bq/m3).

Decreasing Effects of Vibration by Drill and VBast Method with Bi-directions using TBM Pilot Tunnels (파이롯트 터널을 이용한 이방향 천공 발파공법의 진동 저감효과)

  • 이찬우;유진오;이경원;배규진
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1995.04a
    • /
    • pp.22-27
    • /
    • 1995
  • 본 연구로부터 얻어진 결론은 다음과 같다. 1. 본 연구에서는 TBM에 의한 파이롯트 터널의 효율성을 극대화한 이방향 천공 발파공법을 개발, 현장실험을 통하여 그 효용성을 입증하였다. 2. NATM 공법에 의한 발파보다 TBM을 이용하여 파이롯트 터널을 굴착하여 확대발파할 경우 상당한 지반진동 경감효과를 얻을 수 있을 것으로 판단된다. 3. 이방향 천공 발파공법의 현장시험 결과, 측정된 지반 진동치는 20% 이상의 진동 경감효과가 있는 것으로 분석되었다. 4. 기존공법과 신공법의 상대비교를 위한 수치해석 결과, 신공법의 방사상 방향 발파는 기존공법의 종방향 발파에 비하여 관심의 대상이 되는 발파공 직상부에서 진동치가 크게 경감되었다.

  • PDF