• Title/Summary/Keyword: NATM

Search Result 294, Processing Time 0.029 seconds

Deformation Behavior and Reinforcement Design of a Tunnel Excavated in Weak Rock by the NATM (연약암반에 굴착되는 NATM 터널의 변형거동과 보강설계)

  • 서영호;이정인
    • Tunnel and Underground Space
    • /
    • v.3 no.2
    • /
    • pp.132-141
    • /
    • 1993
  • Laboratory and field tests were performed to find out the effectiveness of ground improvement by grouting for an urban subway tunnel that was excavated in weak rock by the NATM. Field measurements were carried out to monitor the behavior of rock mass around the tunnel and to ensure the validity of the current design of the distance form the measuring points to the tunnel face. The final converged displacement and the peroid were predicted using the gamma function. It was found that the ground improvement in terms of reduced permeability and increased stength in the self-supportability of the excavation face enabled the NATM applied in poor gorund. As the result of applying the gamma function to the predicting of displacement, the final displacement including the preceding one and the converged period could be approximately predicted at the early excavation stage.

  • PDF

A Case Study on Construction of a Tunnel Excavated in Silty Ground by the NATM (실트질 지반에 굴착된 NATM 터널의 시공사례 연구)

  • 박종호;윤효석;박종인;이원규
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.139-146
    • /
    • 1999
  • Geological and geotechnical surveys, in general, should precede the excavation to ensure the stability of the tunnel md should be followed up according to the various geological condition during the excavation. However actually the standard support patterns which were decided during the design phases used be insisted for the whole excavation phases in spite of the various geological conditions. When $\bigcirc$$\bigcirc$ tunnel was excavated up to 25m long, the severe displacement was generated in the Portal area of $\bigcirc$$\bigcirc$ tunnel and the tunnel face was pally collapsed. Therefore, this paper present the case study on construction associated with the Umbrella Arch Method used in silty ground by the NATM.

  • PDF

Stress-Pore Pressure Coupled Finite Element Modeling of NATM Tunneling (NATM 터널의 응력-간극수압 연계 유한요소모델링)

  • Yoo, Chung-Sik;Kim, Sun-Bin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.189-198
    • /
    • 2006
  • This paper concerns the finite element (FE) modeling approach for NATM tunneling in water bearing ground within the framework of stress-pore pressure coupled analysis. Fundamental interaction mechanism of ground and groundwater lowering was first examined and a number of influencing factors on the results of coupled FE analysis were identified. A parametric study was then conducted on the influencing factors such as soil-water characteristics, location of hydraulic boundary conditions, the way of modeling drainage flow, among others. The results indicate that the soil-water characteristics plays the most important role in the tunneling-induced settlement characteristics. Based on the results, modeling guidelines were suggested for stress-pore prssure coupled finite element modeling of NATM tunneling.

  • PDF

Waterproof of small NATM Telecommunication Tunnels (소규모 NATM 통신구의 완전방수)

  • Hwang Deok-Il;Kim Jung-Yun;Kang Ho-Kyoung;Lee Jong-Yong
    • 한국터널공학회:학술대회논문집
    • /
    • 2005.04a
    • /
    • pp.202-212
    • /
    • 2005
  • 배수식 방수방식으로 지하 30m에 건설된 NATM터널 통신구를 준공 7년후 완전방수식 방식으로 변경하였다. 터널 라이닝에 30m의 수압을 작용할 경우 발생하는 단면력을 구조검토하고 배근상태가 안전한가 분석하였다. 또한 라이닝의 시공단면을 확인하기 위하여 충격반향기법(Impact-Echo Method)탐사와 GPR탐사, 배근상태를 파악하기 위하여 철근탐지기를 사용하였다. 그 결과 30m 수압에 안전할 것이라는 판단하에 배면주입 방수공법을 적용 통신구를 완전방수 하였다. 그리고 배수식 통신구를 운용하는 비용과 완전방수공사비를 분석한 결과 배출되는 지하수량이 많은 경우 완전방수시공이 경제성이 있다고 분석되었다.

  • PDF

NATM Tunnel Designs in Taiwan High Speed Rail Project (대만 고속전철에 적용한 NATM 터널설계)

  • Kim, Dal-Sun
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.424-430
    • /
    • 2001
  • 현대건설(주)는 사업 주관사로서 해외 업체와 대만고속전철 턴키 공사를 2000 년 1 월에 공동으로 수주하였다. 고속전철의 총 연장 길이는 약 326 km 이며, 정거장 10 개소, Depot 및 야적장으로 구성되어 있다. 이번에 수주한 공구는 2 개의 연속된 공구 (C230, C240) 이며, 본 논문은 총 연장 23.6km 인 C230 공구에 대한 설계 과정을 수록하였다. C230 공구는 NATM 터널 (6.2km), Cut-and-Cover 터널 (0.5km), 교량 (7.8km) 및 토공 구간 (9.1km)으로 구성되어 있다. 전 구간의 지반조건은 "매우" 취약한 매질로 구성되어 있으며, 층리나 절리는 거의 발달되어 있지 않다. 따라서 화약발파에 의한 터널 굴착은 기계식 굴착 (Back-hoe Excavation) 방법에 비하여 현실성이 없는 것으로 분석되었다. 취약한 지반에서 계측 결과를 기준으로 굴착 공간을 안전하게 유지할 수 있는 NATM 보강 설계가 현지 암반조건에 가장 이상적인 방법으로 제시되었다. 특히, NAT설계는 대형 아파트 지역과 파쇄대 및 지하수 침투 예상지역을 통과하기 위하여 계측에 의한 Feed-back 과정을 탄력적으로 적용하도록 계획하였다.

  • PDF

A Study on the Proper Transfer Distance for Minimizing Air Flotation Loss of Backfilling Material of NATM Composite lining Tunnel in the Model Test (충진 모형실험을 통한 NATM Composite 라이닝 터널 뒤채움재의 기포손실 최소화를 위한 적정 이송거리 고찰)

  • Ma, Sang-Joon;Choi, Hee-Sup;Lee, Heung-Soo;Kim, Kyung-Duk
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1555-1558
    • /
    • 2008
  • In this paper, result of whole test, When the Transfer Distance is increasing, Strength of Backfilling Material of NATM Composite lining Tunnel due to increasing Gravity was increased, but that is higher the Air Flotation than increasing Strength. So, That was predicted a drop of Permeability. And Performing the placing Lightweight Foamed Mortar, we think that it's performance in drain material was lost. Therefore We conclude that Proper Transfer Distance that taking Permeability through minimizing of Air Flotation Loss and getting the Need Strength is 50m.

  • PDF

A knowledge-based study on design of NATM lining for subsea tunnels (지식기반 개념을 이용한 해저터널의 NATM 터널의 라이닝 설계)

  • Sin, Chunwon;Woo, Seungjoo;Yoo, Chungsik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.2
    • /
    • pp.195-211
    • /
    • 2016
  • This paper concerns a study of a knowledge-based NATM tunnel lining design for subsea tunnels. Concept for tunnel automation designing system, the development of Artificial Neural Network based technology of the tunnel design system, the learning process and verification of the technology forecasting member forces were described. The design system is the series of process which can predict segmental lining member forces by ANN(artificial neural network system), analyze suitable section for the designated ground, construction and tunnel conditions using a FEM(finite element analysis). The lining member forces are predicted based on the ANN quickly and it helps designers determine its segmental lining dimension easily.

Development and Application of Large-diameter Cut-hole Exploration System for Assessment of the Geological Condition beyond NATM Tunnel Face (NATM 터널의 굴착면 전방 지질 평가를 위한 대구경 심발공 탐사 시스템 개발 및 적용 사례)

  • Kim, Minseong;Jung, Jinhyeok;Lee, Jekyum;Park, Minsun;Bak, Jeonghyeon;Lee, Sean Seungwon
    • Tunnel and Underground Space
    • /
    • v.31 no.1
    • /
    • pp.1-9
    • /
    • 2021
  • Recently, the development of underground space has been accelerated with rapid urbanization, and it is significantly important for safe construction to accurately understand the geological conditions of the section when excavating rocks. In this paper, a boring alignment tracking and geological exploration system have been developed to identify the geological conditions beyond the excavation face by utilizing a MSP method that bores a large empty hole to reduce blast-induced vibration. The major advantage of the proposed exploration system is that we can obtain the ground condition of 50 m ahead of the excavation face through exploration along blast cut-holes drilled for the NATM tunnel construction. In addition, we introduce several case histories regarding the assessment of the geological conditions beyond the tunnel face by monitoring the inside of large empty holes using the proposed hole exploration system.

A Study on Quantity of Shotcrete Sprayed in a NATM Tunnel Based on Field Measurements (현장 실측자료 분석을 통한 NATM 터널의 숏크리트 투입량에 관한 연구)

  • Lee, Cheol Ju
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.9
    • /
    • pp.47-54
    • /
    • 2011
  • This study has analysed overbreaks, shotcrete rebound and the ratio between the actual quantity of shotcrete sprayed compared to designed quantity measured during a NATM tunnel construction. Based on the measurements of size of the excavated tunnel faces, an average overbreak was about 28.5 cm, which is about 260% of allowable overbreak. The measured shotcrete rebound was about 7.2% in average which is about half the allowable rebound(15%). In addition, due to overbreaks and rebound the actual quantity of shotcrete used in the tunnelling work was about 116.5 % of the designed value. It has been found from the field measurements that the quantity of shotcrete showed some relation with rock mass rating(RMR) and the standard guideline of tunnel supports, but the size of overbreak showed less correlation with RMR and the standard guideline of tunnel supports. Hence, the current tunnel design specifications stating the size of overbreak based entirely on the standard guideline for tunnel supports should perhaps be reestablished. The insight into the design guideline regarding overbreak and actual quantity of shotcrete will be reported and discussed.

Prediction of Deformation Behavior of a Shallow NATM Tunnel by Strain Softening Analysis (연화모델을 이용한 저토피 NATM 터널의 변형거동의 예측)

  • Lee, Jae-Ho;Shinich, Akutagawa;Kim, Young-Su
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.9
    • /
    • pp.17-28
    • /
    • 2007
  • Urban tunnels are usually important in terms of prediction and control of surface settlement, gradient and ground displacement. This paper has studied the application of strain softening analysis to predict deformation behavior of an urban NATM tunnel. The applied strain softening model considered the reduction of shear stiffness and strength parameter after yielding with strain softening effects of a given material. Measurements of surface subsidence and ground displacement were adopted to monitor the ground behavior resulting from the tunneling and to modify tunnel design. The numerical analysis results produced a strain distribution, deformational mechanism and surface settlement profile, which are in good agreement with the results of case study. The approach of strain softening modeling is expected to be a good prediction method on the ground displacement associated with NATM tunneling at shallow depth and soft ground.