Deformation Behavior and Reinforcement Design of a Tunnel Excavated in Weak Rock by the NATM

연약암반에 굴착되는 NATM 터널의 변형거동과 보강설계

  • 서영호 (현대건설(주) 연구소 지반기술부) ;
  • 이정인 (서울대학교 자원공학과)
  • Published : 1993.12.01

Abstract

Laboratory and field tests were performed to find out the effectiveness of ground improvement by grouting for an urban subway tunnel that was excavated in weak rock by the NATM. Field measurements were carried out to monitor the behavior of rock mass around the tunnel and to ensure the validity of the current design of the distance form the measuring points to the tunnel face. The final converged displacement and the peroid were predicted using the gamma function. It was found that the ground improvement in terms of reduced permeability and increased stength in the self-supportability of the excavation face enabled the NATM applied in poor gorund. As the result of applying the gamma function to the predicting of displacement, the final displacement including the preceding one and the converged period could be approximately predicted at the early excavation stage.

Keywords