An Experimental Study on Performance of neater Stops at Construction joints in Tunnel (터널 시공이음부에서의 방수재 역할에 대한 실험연구)

  • 백송훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.217-223
    • /
    • 1999
  • Mostly, water leakage took place in construction joints. In case of cable tunnels constructed by open-cut method, waterstops have been used to prevent the water leakage. But, we haven't any experience to install the waterstops in NATM cable tunnels. So, it is necessary to develope the waterstops and test the performance of it in laboratory. We manufactured cable tunnel lining quarter scale model by pouring concrete, and installed the waterstops. After filling the inside of concrete lining about two-third with water, we put the air pressure on the water, In addition, it is also carried out water leakage test for concrete lining model without waterstops. As a result, we confirmed the performance of waterstops and its adaptability. It is also tested that the performance of rubber gaskets used in concrete segments of Shield tunnelling. In addition, we determined the allowable infiltration rate for cable tunnel with non-drainage system.

  • PDF

A Case Study on the Reinforcement Method of Subway Tunnel (도심지 지하철 터널의 지반보강공법 시공사례 연구)

  • 천병식;여유현;최현석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.201-208
    • /
    • 1999
  • The NATM(New Austrian Tunnelling Method) has been used for tunnelling since 1980's. But Collapses of tunnel under construction take place frequently, especially at urban areas because of adjacent buildings, underground conduits and traffic loads. This paper is a case study on the reinforcement method of subway tunnel at urban areas. In this study, ground inspection, geological investigation, laboratory test and numerical analysis by means of FDM program were carried out. The tunnel excavation was stopped because of over excessive brake of tunnel crown and shotcrete was installed to prevent deformation of adjacent ground as the temporary method. From the result of field survey and geological investigation, it is found that the soft weathered soil was distributed to the ground of tunnel invert unlike original investigation. The results of the analysis and the study show that the SGR(Space Grouting Rocket) method and Umbrella method can be applied for the stability of tunnel excavation and in addition the reinforcement of concrete lining is required for long-term stability of tunnel.

  • PDF

A Case of Blasting Vibration Reduction in the Tunnel Construction under a Residential Area (주거지역 터널공사에서의 발파진동 저감사례)

  • Kang, Jin-Ook;Lee, Hyun-Koo;Lee, Myong-Choul
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.05a
    • /
    • pp.175-180
    • /
    • 2007
  • This paper presents a case study on blasting vibration reduction in NATM(New Australian Tunnelling Method) tunnel construction carried out under a congested residential area. In NATM tunnel constructions, blasting is an essential process, thus vibration phenomenon is inevitable. Therefore, the vibration reduction was tried to avoid expected complaints from the public living in the area. Test blastings were performed to get the constants for an estimation formula of vibration velocity. Then the influence area was approximated using the estimation formula, and construction methods for the vibration reduction were sought based on the results.

  • PDF

Ground Behavior and Reinforcing Methods of NATM Tunnel through Deep Weathered Zone (NATM 터널의 대심도 풍화대층에서의 지반거동 및 보강방법)

  • Sung, Hwa-Don;An, Jung-Whan;Chun, Byung-Sik
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1782-1788
    • /
    • 2007
  • This study analyzed ground settlement and ground stress depending on tunnel excavation and the ground reinforcing grouting methods for double line road tunnel through deep weathered zone. Diameter of double line road tunnel was approximately 12m and umbrella arch method and side wall reinforcing grouting were applied. The ring-cut split excavation method and CD-cut excavation method for excavation method were applied. Analysis of failure rate and vertical stress ratio show that the tunnel for which the height of the cover(H) was higher than four times the diameter, it can be considered a deep tunnel. Comparisons of various excavation and ground reinforcement methods were showed that CD-cut method results in lower surface and crown settlement, and lower failure rate than where using Ring-cut split method. In addition the side wall reinforcing grouting resulted in reduction of tunnel displacement and settlement.

  • PDF

Tunnel Deformation in Shallow Unconsolidated Ground by Using Strain-Softening Model (변형연화모델을 이용한 미고결 지반의 터널변형)

  • Seo, In-Shik;Kim, Byung-Tak
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.10 no.2
    • /
    • pp.81-88
    • /
    • 2007
  • In case of an urban tunnel, the displacement of ground base controls the tunnel design because it is built on shallow and unconsolidated ground many times. There are more insufficiency to describe the ground movement which coincides in the measured result of the situ because the design of an urban tunnel is dependent on the method of numerical analysis used to the existing elastic and elasto-plastic models. We studied about the prediction for the ground movement of a shallow tunnel in unconsolidated ground, mechanism of collapse, and settlement. Also this paper shows comparison with the existing elastic and elasto-plastic model using the unlinear analysis of the strain-softening model. We can model the real ground movement as the increasement of ground surface inclination or occurrence of shear band by using strain-softening model for the result of ground movement of an urban NATM tunnel.

  • PDF

A Basic Study on Change Aspect of Displacement and Stress in NATM Tunnel Excavation (터널굴착 중 발생하는 변위 및 응력의 변화양상에 대한 기초적인 연구)

  • Jeong In Cheol;Park Jong Kwan;Lee Jun Seok;Lee Seung Do
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.860-865
    • /
    • 2005
  • In Korea, NATM (New Austrian Tunneling Method) has widely been used in order for constructing tunnels. The major support materials of the method are the shotcrete and rock bolt together with the arch-shaped tunnel section, which ensure the inherent strength of the rock masses. One of the most important features of the method is the feedback system between tunnel analyses and measurements, such as tunnel displacement and support stresses. This study, therefore, attempts to examine the difference in displacement and stresses between numerical results. and measurements in order for more practical design and construction of tunnels.

  • PDF

Field Measurements of Ground Movements Around Tunnel (현장계측에 의한 터널주변지반의 변위연구)

  • 홍성완;배규진
    • Geotechnical Engineering
    • /
    • v.1 no.2
    • /
    • pp.41-54
    • /
    • 1985
  • Generally, ground settlements and lateral displacements are accompanied by underground excavation associated with open-cut or tunnling. These ground movements cause a harmful influence upon nearby super.structures and sub-structures. Occasionally, the ground movements may pose serious problems as the function of the nearby structures may be disrupted. Therefore, prior to the subway construction in an urban area, it is necessary to identify the causes of ground settlements and estimating the extent St the magnitude of ground movements since any potential damage to the nearby structures such as gas lines, water mains, high buildings and cultural assets must be assessed. The research was performed mainly on ground movements such as surface settlements, lateral displacements, subsurface settlements and crown settlements to predict the maximum settlement and settlement zone, and to identify the causes of ground settlements in NATM sections of Busan subway. As a result, it was found that lateral distribution of settlements could be approximated reasonably by a Gaussian normal probability curve and longitudinal distribution of settlements by a cumulative Gaussian probability curve, and that the early closure of temporary invert was very important to minimize ground settlements.

  • PDF

Characteristics of Tunnel Convergence Behaviour based on Variation of Rock Mass Rating (암반 등급 변화에 따른 터널 내공 변위 거동 특설)

  • Kim, Kwang-Yeom
    • The Journal of Engineering Geology
    • /
    • v.18 no.4
    • /
    • pp.545-553
    • /
    • 2008
  • Face mapping and displacement monitoring during tunnel construction are the most influential information for the stability assessment of ground and around structures. Especially, the result of face mapping and displacement analysis is essential to the excavation and support design in NATM which is based on the drilling and blasting. However, there have not been so many studies to put those useful information into practice for decision-making process during construction. The study reviewed the tunnel behaviour based on the RMR rating and displacement monitoring when the geological condition of rock mass varies inevitably. The study analysed the crown settlement using convergence equation in order to compensate the disparity induced by the location and time of measurement and found a distinct relation between the geological condition and the line of influence. As a result of analysing the various parameters related to the tunnel convergence according to the geological condition, the study suggested the basic knowledge about the relation between face mapping and displacement behaviour of tunnel.

The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project (근로시간 단축에 따른 터널 공사의 표준 공기 및 공사비 영향 분석)

  • Park, Taeil;Kim, Kyunghoon;Shin, Eun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.37-43
    • /
    • 2019
  • After the new standards for labor hours has been released, various problems come up in construction field, such as income reduction of employees, extension of construction period and increased construction cost. Although it is expected that the impact of the new standard on the construction industry is more worse than other industries form the view of productivity, not much works have been done to identify those impacts. Thus, this research proposes the standard construction processes, excavation cycle, and unit construction period for NATM tunnel project based on 'Construction Standard Production Rates.'The study also investigated the impact of reduced labor hours on the management of work crews, construction periods and costs of tunnel projects. The results showed that under the 52 labor hour standard, the construction periods for the excavation work and whole project was increased by 20% and 8.9%, respectively, but the construction costs for the excavation work and whole project was decreased by 1.4% and 0.6%, respectively.

Study on a rational repair and reinforcement by analysis of crack density in OO subway (지하철 터널 균열밀도 분석을 통한 합리적인 보수보강 방안 연구)

  • Yoon Tae-Gook;Shin Yong-Suk;Ahn Sang-Ro;Lee Song
    • 한국터널공학회:학술대회논문집
    • /
    • 2005.04a
    • /
    • pp.262-269
    • /
    • 2005
  • The priority order about a rational repair and reinforcement is generally decided by subjective decision of engineer. An appearance investigation by tunnel scanner that is widely used in foreign nation was carried out to decide about a rational repair and reinforcement through systematic and objective analysis in box and NATM tunnel. We have decided on the order of priority of an rational repair and reinforcement through the crack density analysis by span, distance and location with the result of tunnel scanner.

  • PDF