• Title/Summary/Keyword: N and P Removal

Search Result 998, Processing Time 0.025 seconds

Development of high-hydrophilic Biofilter for Decentralized Regions and Rural Communities (분산지역의 생활하수 처리를 위한 고친수성 Biofilter 개발)

  • Kwon, Tae-Young;Yoon, Chun-Gyeong;Jung, Kwang-Wook
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.4
    • /
    • pp.678-686
    • /
    • 2006
  • The feasibility of the high-hydrophilic biofilter was examined for application in rural wastewater treatment in Korea. The intermittent trickling biofiter was developed for wastewater treatment of media and examined instantaneous wetting water and immersional wetting water. Melamin foam absorbed 120 times it's weight in water and maintained wetting status than other materials. These characteristics are improvement for application in rural areas showing large variance of amount of influent. The biofilter process was effective in treating organic pollutants; mean removal efficiencies of $BOD_5$ and TSS were above 80%. The average SS concentrations of effluent was showed below $10mg/L^{-1}$ and meet guidelines in special regions, however, the average concentration of $BOD_5$ was about $20mg/L^{-1}$. The removals of T-N and T-P were relatively less effective and removal efficiencies were below 40%. It might meet the guidelines for T-P because of low levels of influent T-P concentration. However, the T-N concentration were too high and further treatment is required. The effluent concentration of $NH_4-N$ showed a significant reduction rate about 43.8%, but part of $NH_4-N$ was transformed to $NO_2-N$ and $NO_3-N$ inside the biofilter through nitrification process. The effluent concentration of org-P was removed about 78.8% of influent concentration by filtration. Considering stable performance and effective removal of pollutant in wastewater, low maintenance, and cost-effectiveness, the hydrophilic biofilter system was thought to be an effective and feasible alternative for decentralized rural areas.

Removal of Nitrogen and Phosphorus from Municipal Wastewater by a Pilot-scale BNR Process (파이롯트 규모의 BNR 공법에 의한 도시하수의 질소 및 인 제거)

  • Kim, Young-Chur
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.21 no.5
    • /
    • pp.589-599
    • /
    • 2007
  • This study was conducted to investigated the removal efficiency of BOD and nutrient for the treatment of low strength municipal wastewater by a biological nutrient removal system. In this experiment, the effect of operating parameter including HRT of 7.0hr, BOD/TN ratios of 2.62~4.08, internal recycle of 50~300%, and return sludge of 50~100%, were studied during winter season. Efficiencies of organic matter and T-P removal and denitrification were not significantly affected by the change of temperature in winter season. However, the specific nitrification rate and nitrification efficiency decreased at low temperature. Besides, denitrification efficiencies increased with increasing BOD/TN ratios. It was also found that the internal recycle and return sludge ratio below 50% is required for the effective denitrification of low strength municipal wastewater. With operating mode 4 of the optimum, the effluent BOD, T-N and T-P concentration were obtained to average 5.8, 14.6, and 0.84 mg/L, respectively. The temperature-activity coefficient (${\theta}$) of specific nitrification rate, specific denitrification rate and specific phosphorus uptake rate were obtained 1.044, 1.017, 1.028, respectively.

Comparison of CAD/CAM abutment and prefabricated abutment in Morse taper internal type implant after cyclic loading: Axial displacement, removal torque, and tensile removal force

  • Yi, Yuseung;Heo, Seong-Joo;Koak, Jai-Young;Kim, Seong-Kyun
    • The Journal of Advanced Prosthodontics
    • /
    • v.11 no.6
    • /
    • pp.305-312
    • /
    • 2019
  • PURPOSE. The purpose of this study was to compare computer-aided design/computer-aided manufacturing (CAD/CAM) abutment and prefabricated abutment in Morse taper internal connection type implants after cyclic loading. MATERIALS AND METHODS. The study was conducted with internal type implants of two different manufacturers (Group Os, De). Fourteen assemblies were prepared for each manufacturer group and divided into 2 groups (n=7): prefabricated abutments (Os-P, De-P) and CAD/CAM abutments (Os-C, De-C). The amount of axial displacement and the removal torque values (RTVs) were measured before and after cyclic loading (106 cycles, 3 Hz with 150 N), and the tensile removal force to dislodge the abutments was measured after cyclic loading. A repeated measures ANOVA and a pattern analysis based on the logarithmic regression model were conducted to evaluate the effect of cyclic loading on the axial displacement. The Wilcoxon signed-rank test and the Mann-Whitney test was conducted for comparison of RTV reduction% and tensile removal forces. RESULTS. There was no significant difference between CAD/CAM abutments and prefabricated abutments in axial displacement and tensile removal force; however, significantly greater RTV reduction% after cyclic loading was observed in CAD/CAM abutments. The correlation among the axial displacement, the RTV, and the tensile removal force was not significant. CONCLUSION. The use of CAD/CAM abutment did not significantly affect the amount of axial displacement and tensile removal force, but presented a significantly greater removal torque reduction% than prefabricated abutments. The connection stability due to the friction at the abutment-implant interface of CAD/CAM abutments may not be different from prefabricated abutment.

Validity evaluation of wastewater treatment system applying advanced treatment processes (고도처리공법이 적용된 하수처리시설에서의 공법적용의 적정성 평가)

  • Ahn, June-Shu;Park, Tae-Sool;Cho, Jung-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.10
    • /
    • pp.4055-4068
    • /
    • 2010
  • In this study, validity of wastewater treatment system with advanced treatment processes was evaluated by studying its operational conditions by applying the advanced treatment to the wastewater treatment system which was operating for last several years. Study indicated a fair result for the removal efficiencies of BOD, T-P, and T-N for each unit operation. BOD removal efficiencies for primary clarifier, bioreactor, final effluent are 35, 87, and 48 % respectively. T-P(T-N) removal efficiencies for primary clarifier, bioreactor, final effluent are 18(23), 40(38), and 25(25) % respectively. Further investigation of bioreactor showed that various microorganism such as bacteria, protozoa, and metazoa is present in the bioreactor, and the main function of the media, adhesion (adsorption) of microorganism onto the media, is stabilized. Final effluent quality was lower than the regulation, and BOD, COD, SS, T-N, T-P were 5.5, 9.9, 4.6, 11.8, 0.99 mg/L respectively.

The Characteristics of SBR Treatment with Different Types of Piggery Wastewater (축산폐수성상에 따른 SBR 처리특성)

  • Jun, Byong-Hee;Poo, Kyung-Min;Kim, Yang-Hoon;Im, Jeong-Hoon;Kim, Chang-Won
    • Journal of Korean Society on Water Environment
    • /
    • v.18 no.4
    • /
    • pp.435-440
    • /
    • 2002
  • A pilot scale SBR (effective volume, $20m^3$) for the treatment of piggery wastewater treatment was performed with three different kinds of wastewater; fermenter effluent, scraper type and slurry type. The react phase in SBR was performed by sub-cycle operation consisting of repeated short cycle of anoxic-aerobic step. The fermenter effluent was characterized by the rapid nitrification and $NO_X-N$ accumulation due to depletion of organic matter in wastewater. The scraper type wastewater showed appropriate nitrogen removal efficiency, however, a poor response capacity for high loading rate often resulted in increased nitrogen concentration in effluent. Moreover, severe P release was the most serious problem in scraper type wastewater. SBR treated slurry type wastewater with high nitrogen removal efficiency to satisfy effluent quality requirement. It was thought that high concentration of organic matter in slurry made it possible to uptake P during SBR operation, where P concentration of 140mgP/l was decreased to 8mgP/l. As results, SBR was suitable to treat slurry type wastewater which has been discharged to the ocean till now.

Study on the Performance of Constructed Wetland System for Sewage Treatment (인공습지 오수처리시설의 처리성능에 관한 연구)

  • 윤춘경
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.42 no.4
    • /
    • pp.96-105
    • /
    • 2000
  • Field experiment was performed from August 1996 to December 1999 to examine the performance of constructed wetland system for wastewater treatment in rural area. The constructed wetland system was installed in Konkuk University and the effluent from septic tank of school building was used as an influent to the treatment basin. The treatment basin was composed of sand bed with planted reed. From August 1996 to June 1998 the hydraulic loading rate was fixed with about 15.63cm/day and theoretical detention time was 1.38 days, and from July 1998 to December 1999 the hydraulic loading rate was about 6.25cm/day and theoretical detention time was 3.5days. It worked continuously even during winter time, and the sewage flowed without freezing even when average daily air temperature was below -1$0^{\circ}C$. Average removal rate of BOD , COD, and SS was about 70%, T-P removal rate was about 50.8% , and T-N removal rate was 23.9%. The reason for poor T-N removal might be due to high influent concentration and short retention times. At the later years BOD and COD removal rates were increased , and SS and T-P removal rates did not change significantly , but T-N removal rates were decreased. The effluent of the wetland system often effluent water quality standards for sewage treatment plant, therefore, further treatment would be required if the effluent need to be discharged to the public water. Wetland system involves relatively large land area and could be suitable for rural area. Therefore, utilization of reclaimed sewage for agricultural purpose or subsequent land treatment is recommended as a ultimate disposal of sewage for agricultural purpose or subsequent land treatment is recommended as a ultimate disposal of sewage in rural area.

  • PDF

A Study on the Effect of Chemical Pretreatment for Livestock Wastewater on the Linked Treatment of Sewage (축산폐수 처리 시 화학적 전처리가 연계처리에 미치는 영향 연구)

  • Han, Jun-Suk;Han, Gee-Bong
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.18 no.1
    • /
    • pp.89-97
    • /
    • 2010
  • In this study, to investigate the effect of chemical pretreatment for livestock wastewater, laboratory scale test for ozonation and linked treatment of sewage were conducted. and the results were obtained as follows. The ozonation of livestock wastewater showed the COD removal rate per hour to be 17%, 78% and 62% at each pH 4, 7 and 10, respectively. With transformation of NBDCOD to biodegradable BDCOD by ozonation, the ratio of SCODcr/TCODcr was increased from 26% to 38%. Accordingly, pretreatment of livestock wastewater affected to the biological post treatment process to elevate removal efficiency by transformation of nonbiodegradable mass to biodegradable mass. As the results of linked treatment of pre-ozonated livestock wastewater and sewage in the MLE process, the treatment efficiencies of TCODcr 93.8%, T-N 74.3%, T-P 89.7%, SS 97.5% were earned at 100% of internal recycle rate. When the internal recycle rate was increased to 150%, the treatment efficiencies of TCODcr 94.5%, T-N 54.5%, T-P 70.8%, SS 98.5% were earned. Also the removal efficiencies of TCODcr 92.6%, T-N 83.1%, T-P 81.9%, SS 98.5% were earned as the internal recycle rate was increased to 200%. Especially, nitrogen removal efficiency in the linked treatment showed 74.3%, 54.5%, 83.1% at 100%, 150% and 200% of internal recycle ratio, respectively, which revealed the tendency of higher removal efficiency than that of sewage treatment.

Performance of Chlorella vulgaris for the Removal of Ammonia-Nitrogen from Wastewater

  • Choi, Hee-Jeong;Lee, Seung-Mok
    • Environmental Engineering Research
    • /
    • v.18 no.4
    • /
    • pp.235-239
    • /
    • 2013
  • In the present investigation, the efficiency of Chlorella vulgaris (C. vulgaris) was evaluated for the removal of ammonia-nitrogen from wastewater. Eight different wastewater samples were prepared with varied amounts of $NH_4-N$ concentrations from 15.22 to 205.29 mg/L. Experiments were conducted at pH $7.5{\pm}0.3$, temperature $25^{\circ}C{\pm}1^{\circ}C$, light intensity $100{\mu}E/m^2/s$, and dark-light cycles of 8-16 hr continuously for 8 days. From the results, it was found that $NH_4-N$ was completely removed by C. vulgaris, when the initial concentration was between 5.22-25.24 mg/L. However, only 50% removal was obtained when the $NH_4-N$ concentration was 85.52 mg/L, which further decreased to less than 32% when the $NH_4-N$ concentration exceeded 105.43 mg/L. The further influence of nitrogen on chlorophyll was studied by various $NH_4-N$ concentrations. The maximal value of chlorophyll a (Chl a) content was found to be 19.21 mg/L for 65.79 mg/L $NH_4-N$ concentration, and the maximum specific $NH_4-N$ removal rate of 1.79 mg/mg Chl a/day was recorded at an $NH_4-N$ concentration of 85.52 mg/L. These findings demonstrate that C. vulgaris could potentially be employed for the removal of $NH_4-N$ from wastewater.

A Study on Optimum HRT Combination for Efficient Nitrogen Removal at WWTP in Winter Days (동절기 하수처리장에서 효율적인 질소제거를 위한 최적 HRT조합 도출에 관한 연구)

  • Gil, Kyung-Ik;Lee, Un-Gil;Rho, Hae-Yeon
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.3
    • /
    • pp.165-169
    • /
    • 2008
  • It has been reported that most wastewater treatment plants have difficulties in nitrogen removal during winter season due to declined activity of nitrifiers in the condition of low temperature. This study was conducted in order to find out optimum operating condition for efficient nitrogen removal in low temperature. A series of operating conditions with various HRTs of each tank were simulated using the GPS-X program. The optimum HRT combination for effective nitrogen removal was 0.3 hr/0.5 hr/1.36 hr/4.84 hr(PreAx/An/Ax/Ox) with 51.4% of T-N removal efficiency and 57.3% of $NH_4^+$-N removal efficiency.

Nutrients Removal Efficiency by Vegetation Density on Constructed Wetland from Small Watershed (소수계 유역 인공습지에서 식생 밀도 차이에 다른 영양염류 제거효율)

  • Ko, Jee-Yeon;Kang, Hang-Won;Lee, Jae-Sang;Kim, Chun-Song;Sakadevan, K.;Bavor, H.J.
    • Korean Journal of Environmental Agriculture
    • /
    • v.22 no.4
    • /
    • pp.266-272
    • /
    • 2003
  • This study was conducted to evaluate effects of 2 constructed wetlands with different vegetation states (plumpton park wetland and Woodcroft park wetland) for reducing non-point source pollution from small watershed consisted of residential and agricultural area in suburban district of Sydney, Australia. The total nitrogen and phosphate removal efficiency of Plumpton park constructed wetland, composed of stable and dense vegetation, were 38.3% and 26.2% and Woodcroft park constructed wetland having still poor vegetation due to the short time to settle down transplanted plants after construction, showed relatively low removal efficiency of 20.2% and 14.0%. The removal efficiency of inorganic nutrients such as $NH_4-N$, $NO_3-N$, $PO_4^{-3}$ were higher than total nitrogen and phosphate because plants and microorganisms in rhizosphere of constructed wetlands took up inorganic nutrients shortly. According to the type of wetland inflow, the nutrients removal efficiency of storm water flow was lower than base flow.