• 제목/요약/키워드: Multipurpose dam inflow

검색결과 28건 처리시간 0.028초

EVALUATION OF THE WATER RESOURCES ASPECT OF THE OPERATING RESULTS OF THE DAECHEONG MULTIPURPOSE DAM

  • Noh, Jaek-young
    • Water Engineering Research
    • /
    • 제5권1호
    • /
    • pp.17-36
    • /
    • 2004
  • This paper evaluated the water resources aspect of the operating results of the Daecheong Multipurpose Dam for the last 21 years. The elements that were evaluated included the amount of water supply from the dam. volume of outflow from the regulating dam, changes in the runoff volume at the dam site and downstream, and variations in the water supply capacity of the Daecheong Multipurpose Dam and the Geum River Barrage Dam situated in the estuary. The rainfall-runoff model was used to evaluate the changes in the runoff volume, and the water balance analysis system was used to evaluate the variations in the dams'water supply capacities. The volume of domestic and industrial water supply from the Daecheong Multipurpose Dam increased to 6.1 times for the last 21 years from 61${\times}$$10^6$$m^3$ in 1981 to 375${\times}$$10^6$$m^3$in 2001. The rate of outflow to inflow of the Daecheong Dam was analyzed 1.30 times in dry season, 1.12 times in semi-dry season, and 0.90 times in rainy season. The volume of inflow to the Geum River Barrage Dam down- stream after the dam's construction increased to 1.25 times in dry season and 1.02 times in semi-dry season and decreased to 0.94 times in rainy season. The water supply capacity of the estuary barrage dam almost did not change in cases with or without the Daecheong Multipurpose Dam, but storages were largely affected by the outflows of the Daecheong Multipurpose Dam.

  • PDF

직상류 계측유량경계조건과 분포형모델을 이용한 대규모 다목적댐 홍수유입량 산정 (Flood Inflow Estimation at Large Multipurpose Dam using Distributed Model with Measured Flow Boundary Condition at Direct Upstream Channels)

  • 홍석현;강부식
    • 대한토목학회논문집
    • /
    • 제35권5호
    • /
    • pp.1039-1049
    • /
    • 2015
  • 대규모 다목적댐 지점의 유입량 산정은 수위-저수용량곡선에 댐 축에서 측정된 수위를 적용하여 시간당 저수량변화를 계산한 후 방류량을 감안하여 산정하고 있으나, 이 방법은 태풍 등 대규모 홍수 시에는 급격한 유입량 증가로 인한 배수위 및 강한 바람 등의 영향으로 저수지내의 수위가 균일하지 않아 유입량 산정 시 오차 원인이 되고 있다. 이 외에 기존 수위-저수용량 곡선 방법에 의한 유입량 계산 시 문제점인 댐건설 이후 유입 퇴사로 인한 저수용량의 변화, 댐 지점에서의 수위관측의 불균일성 등 다양한 불확실성이 존재하므로 이에 대한 오차 규명이 반드시 필요하다. 본 연구에서는 저수지 유입량 분석시 분포형 강우유출모형을 이용한 UBC-3P 기법을 적용하여 모형의 모의능력을 평가하였다. 최종적으로 기존 유역내 유입량 관측치와 비교한 결과 Peak유량과 Total유량에서 결정계수가 0.82~0.99 사이값을 나타내므로 댐 지점에서의 모형의 적합성을 확인하였다.

자유경쟁 시장 내에서 용담다목적댐 발전소의 최적 계약가능 공급량 평가 (Estimation of Optimal Hydro-Power Supply Amount of Yongdam Multipurpose Dam for the Contract on the Free-Competition Market)

  • 유주환
    • 한국수자원학회논문집
    • /
    • 제38권1호
    • /
    • pp.25-35
    • /
    • 2005
  • 요즘 다목적댐의 수력발전을 일으킬 수 있는 수자원은 용수공급이 증가함에 따라서 점점 감소하고 있는 형편이다. 한편 국내 수력 발전량의 거래가 다자간의 시장경제 체제로 형성될 경우, 수력에너지 생산자는 최적 공급량과 공급의 수문학적 신뢰도 수준을 제시해야 한다. 이에 본 연구에서는 금강 수계 내 위치한 용담다목적댐의 수력 발전소에서 공급가능한 발전량과 공급 신뢰도를 평가하기 위하여 저수지 조작 기법으로 선형계획법을 적용하였고 1차원 조사법을 이용하여 유입량의 신뢰도와 수력 발전 공급량의 최적치를 결정하였고 그 주요 결과를 제시하였다.

딥러닝을 활용한 다목적댐 유입량 예측 (Prediction of multipurpose dam inflow using deep learning)

  • 목지윤;최지혁;문영일
    • 한국수자원학회논문집
    • /
    • 제53권2호
    • /
    • pp.97-105
    • /
    • 2020
  • 최근 데이터 예측 방법으로 인공신경망(Artificial Neural Network, ANN)분야에 대한 관심이 높아졌으며, 그 중 시계열 데이터 예측에 특화된 LSTM(Long Short-Term Memory)모형은 수문 시계열자료의 예측방법으로도 활용되고 있다. 본 연구에서는 구글에서 제공하는 딥러닝 오픈소스 라이브러리인 텐서플로우(TensorFlow)를 활용하여 LSTM모형을 구축하고 금강 상류에 위치한 용담다목적댐의 유입량을 예측하였다. 분석 자료로는 WAMIS에서 제공하는 용담댐의 2006년부터 2018년까지의 시간당 유입량 자료를 사용하였으며, 예측된 유입량과 관측 유입량의 비교를 통하여 평균제곱오차(RMSE), 평균절대오차(MAE), 용적오차(VE)를 계산하고 모형의 학습변수에 따른 정확도를 평가하였다. 분석결과, 모든 모형이 고유량에서의 정확도가 낮은 것으로 나타났으며, 이와 같은 문제를 해결하기 위하여 용담댐 유역의 시간당 강수량 자료를 추가 학습 자료로 활용하여 분석한 결과, 고유량에 대한 예측의 정확도가 높아지는 것을 알 수 있었다.

Hydrological Stability Analysis of the Existing Soyanggang Multipurpose Dam

  • Ko, Seok-Ku;Shin, Yong-Lo
    • Korean Journal of Hydrosciences
    • /
    • 제7권
    • /
    • pp.37-49
    • /
    • 1996
  • This study aims at suggesting an alternative to improve flood controling capacity according to the cument design criteria for the existing Soyanggang Multi-purpose Dam which was constructed 20 years ago as the largest dam in Korea. The peak inflow of the adopted probable maximum flood (PMF) at the time of construction was 13,500 $m^3$/s. However, the newly estimated peak inflow of the PMF is 18,000 $m^3$/s which is 1.34 times bigger than the original one. This is considered to be due to the accumulation of the reliable flood and storm event records after construction, and due to the increasing tendency of the local flood peaks according to the influence of world-wide weather change. The new estimation of the probable maximum precipitation (PMP) was based on the hydro-meteorological method suggested by the guideline of the World Meteorological Organization (WMO). The unit hydrograph which was applied for the estimation of PMF was derived through linear programming algorithm by minimizing the sum of absolute deviations of the calculated and recorded flood hydrographs. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared : (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing spillway, (3) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang dam, (4) raising the existing dam crest. The preliminary evaluation of these alternatives resulted in that the second alternative is most economic and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multipurpose dam, a detailed study of an additional spillway tunnel has to be followed.

  • PDF

퍼지제어모형을 이용한 다목적 댐의 홍수조절모형( I ) - 단일댐의 운영모형 개발 - (Multipurpose Dam Operation Models for Flood Control Using Fuzzy Control Technique ( I ) - Development of Single Dam Operation Models -)

  • 심재현;김지태;허준행;김진영
    • 한국방재학회 논문집
    • /
    • 제4권1호
    • /
    • pp.33-40
    • /
    • 2004
  • 본 연구에서는 치수방재 효과를 향상시키기 위한 단일댐운영 모형을 개발하였으며, 제어기법은 퍼지제어 기법을 사용하였다. 본 모형은 저수지 수위와 유입량을 기준으로 제어규칙을 설정하였으며 방류량을 결정하는 제어기준에 따라 Fuzzy I, II, III의 세가지 모형을 개발하였다. Fuzzy I 모형은 6개의 제어규칙에 의해 홍수조절만을 고려한 것이고, Fuzzy II 모형은 I 모형의 치수효과를 가지면서도 홍수후의 저수위를 상승시켜 이수적인 효과도 얻기 위한 모형이며, Fuzzy III 모형은 적응제어모형으로 제어규칙을 9개로 세분화하여 치수효과와 이수효과를 동시에 거둘 수 있도록 한 모형이다.

용수수요를 고려한 DAWAST 모형 (Return Flows Considered DAWAST Model)

  • 노재경;이진영;진용신
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2003년도 학술발표논문집
    • /
    • pp.503-506
    • /
    • 2003
  • The DAWAST model was originally developed to consider daily variation in the unsaturated soil water storage and it is a conceptual lumped model. Return flows from agricultural, domestic and industrial water were included to the original result of model simulation to calibrate model parameter. Daily inflow to the Daechung multipurpose dam was applied to verify the DAWAST model considered return flows. Simulation results were comparable to the inflows of dam operation reasonably.

  • PDF

다목적댐유역에서의 증발산 보완관계가설 검증 (Validation of Complementary Relationship Hypothesis for Evapotranspiration in Multipurpose Dam Basins)

  • 김지훈;강부식;김진겸
    • 대한토목학회논문집
    • /
    • 제37권3호
    • /
    • pp.549-559
    • /
    • 2017
  • 잠재증발산($ET_P$)과 실제증발산($ET_A$) 사이의 보완관계 가설을 국내 다목적댐 유역에 적용하여, 각 유역의 기상 수문 관측자료를 기반으로 잠재 및 실제 증발산사이의 보완관계 성립을 검증하고자 하였다. 연단위 실제증발량($ET_A$)은 총강수량과 총유출량의 차이로서 간접추정하였으며, 가용수분량은 연강수량으로 대체하여 사용하였다. 이때, 팬증발량 보정에 사용된 팬계수(kp)는 홍수기 및 비홍수기로 구분하여 $ET_{pan}$과 FAO Penman-Monteith 식으로 계산된 증발량($ET_{PM}$)의 비를 통해 산정하였다. 각 다목적댐 유역에서 관측자료 기반의 독립적으로 계산된 $ET_P$$ET_A$를 통해 보완관계를 산정한 결과, 대부분의 유역에서 가용수분량이 증가할수록 $ET_P$는 감소함과 동시에 $ET_A$는 증가하는 일반적인 보완관계의 패턴을 잘 보였고, 강수량의 증가에 따라 평형증발산량($ET_W$)의 수렴을 확인할 수 있었다. 하지만, 주암댐의 경우 $ET_A$가 다른 댐 유역에 비해 크게 산정되어 가용수분량이 큰 구간에서 $ET_P$를 초과하는 경우도 발생하였다. 이는 주암댐 유역의 강수량의 과다산정 혹은 유입량의 과소산정의 가능성을 보여주는 결과로 해석될 수 있다. 증발산 보완관계를 수문학적 물수지검증을 위한 기준으로 활용한다면 홍수기 다목적댐 유입량 산정의 불확실성을 제어하는데 도움이 될 것으로 기대한다.

라그랑지안 입자 추적기법을 이용한 홍수조절용댐 내 부유쓰레기 거동 모의에 관한 연구 (A Study on the Behavior of Floating Debris in a Flood Control Dam Using the Lagrangian Particle Traking Method)

  • 장석환;오경두;오지환
    • 한국환경과학회지
    • /
    • 제25권9호
    • /
    • pp.1253-1267
    • /
    • 2016
  • After large-scale flooding damage occurred along the Imjin river in 1996, 1998, and 1999, the Hantan river flood control dam was planned, and it has since been under construction. Unlike existing dams in Korea, the Hantan river flood control dam will remain fully open except during high floods, when the dam will store flood water temporarily to reduce flood peaks and flood water volume downstream. During past flooding seasons, floating debris has caused difficulties in the management of large-scale dams. Most of the existing multipurpose dams in Korea have installed nets to collect floating debris based on many years of experience with and data about inflow and distribution of floating debris in the dams. For the Hantan river flood control dam, however, collection of data about inflow and distribution of floating debris is not possible as the dam is located near the border area between North and South Korea. In order to devise a preliminary plan to collect floating debris in the Hantan river flood control dam, an EFDC hydrodynamic model was used to analyze the behavior of floating debris during high floods. The Lagrangian particle tracking method was utilized to simulate the behavior of floating debris in the dam. Based on the analysis of paths and final destinations of the particles, seven collection points were selected where it seemed to be effective to collect floating debris, as debris is likely to accumulate there in high density.

소양강 다목적댐의 수문학적 안정성 검토 (Hydrological Stability Analysis of the Existing Soyanggang Multi-Purpose Dam)

  • 고석구;신용노
    • 물과 미래
    • /
    • 제28권3호
    • /
    • pp.187-195
    • /
    • 1995
  • 본 연구의 목적은 20년 전에 건설 완료된 우리나라 최대 다목적댐인 소양강 다목적댐의 치수능력을 재검토하여 그 대안을 제시하는데 있다. 최악의 기상조건을 고려하여 수문 기상학적 방법으로 산정한 소양강 다목적댐유역의 72시간 지속 가능 최대 강수량(PMP, probable maximum precipitation)은 760.0mm 이며 재산정된 가능 최대 홍수량(PMF, probable maximum flood)은 18,100$m^3$/s이다. 이는 댐 계획 당시 1,000년 빈도 홍수량의 최대치 13,500$m^3$/s 보다 1.34배 크게 나타났다. 가능 최대 홍수량을 설계 홍수량으로 채택할 경우의 4개 대안; 1) 하수 제한수위를 낮추는 안, 2) 비상 여수로를 추가하는 안, 3)기존 댐을 증고시키는 안, 4) 상류에 홍수조절용댐을 건설하는 안 등을 검토한 결과 경제성과 치수 관리 능력 효율면에서 소양강 다목적댐의 수문학적 안정성을 도모할 수 있는 최적의 개선 방안은 비상 여수로를 추가하는 안으로 판단된다. 따라서 현 여수로에 부가하여 비상 여수로를 추가하는 방안이 보다 더 구체적으로 검토되어야 할 것이다.

  • PDF