• Title/Summary/Keyword: Multiple line

Search Result 1,250, Processing Time 0.032 seconds

Construction of Spread Spectrum Power Line Communication Equipment Using Power Line Synchronization (전원동기를 이용한 스펙트럼 확산 전원선 통신장치의 구성)

  • 이동욱;변건식;김명기
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.15 no.6
    • /
    • pp.475-484
    • /
    • 1990
  • This paper proposes a method for the implementation of a power line communication equipment using power line synchronization in a direct-sequence spread spectrum communication system. In order to implement a network using a power line as a transmission channel we have investigated the utilization of direct-sequence speread spctrum which gives such advantages as robustness against narrow-band interference and noise, and realization of multiple access. In a power line, however, complexity of synchronization makes it difficult to realize a multiple access and cost down and system simplification. The proposed technique of power line synchronization makes it possible to get cost down and system size small, and the realization of multiple communication can be achieved by the addition of address setting circuit.

  • PDF

Multiple crack evaluation on concrete using a line laser thermography scanning system

  • Jang, Keunyoung;An, Yun-Kyu
    • Smart Structures and Systems
    • /
    • v.22 no.2
    • /
    • pp.201-207
    • /
    • 2018
  • This paper proposes a line laser thermography scanning (LLTS) system for multiple crack evaluation on a concrete structure, as the core technology for unmanned aerial vehicle-mounted crack inspection. The LLTS system consists of a line shape continuous-wave laser source, an infrared (IR) camera, a control computer and a scanning jig. The line laser generates thermal waves on a target concrete structure, and the IR camera simultaneously measures the corresponding thermal responses. By spatially scanning the LLTS system along a target concrete structure, multiple cracks even in a large scale concrete structure can be effectively visualized and evaluated. Since raw IR data obtained by scanning the LLTS system, however, includes timely- and spatially-varying IR images due to the limited field of view (FOV) of the LLTS system, a novel time-spatial-integrated (TSI) coordinate transform algorithm is developed for precise crack evaluation in a static condition. The proposed system has the following technical advantages: (1) the thermal wave propagation is effectively induced on a concrete structure with low thermal conductivity of approximately 0.8 W/m K; (2) the limited FOV issues can be solved by the TSI coordinate transform; and (3) multiple cracks are able to be visualized and evaluated by normalizing the responses based on phase mapping and spatial derivative processes. The proposed LLTS system is experimentally validated using a concrete specimen with various cracks. The experimental results reveal that the LLTS system successfully visualizes and evaluates multiple cracks without false alarms.

Installation of MFC(Multiple FACTS Coordinated control) On-line System for the Spinning Reserve of a Reactive Power in Metropolitan Area (수도권 순동 무효전력 확보를 위한 FACTS 협조제어 시스템 온라인 설치)

  • Chang, Byung-Hoon;Moon, Seung-Pil;Ha, Yong-Gu;Jeon, Woong-Jae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.12
    • /
    • pp.2131-2134
    • /
    • 2010
  • In this paper, the on-line system schemes for coordinated control system of multiple FACTS were presented to enhance the voltage stability around the metropolitan areas. In order to coordinated control system of FACTS devices, MFC on-line system calculates the optimal set point(Vref, Qrev) of FACTS devices using the coordinated control algorithm with real time network data which is transferred from SCADA/EMS system. If the system is unstable after contingencies, the new operation set-point of FACTS would be determined using bus sensitivity from tangent vector at voltage instability point. Otherwise, we would determine the new operation set-point of FACTS for considering economical operation, like as active power loss minimization using Optimal Power Flow algorithm. As the test, MFC(Multiple FACTS Coordinated control) on-line system will be installed in Korea power system.

A Genetic Algorithm for Line Balancing in the Multiple U-Typed Lines (복수 U 라인의 라인밸런싱을 위한 유전알고리듬)

  • 김동묵
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.25 no.1
    • /
    • pp.51-65
    • /
    • 2000
  • Multiple U-typed producton lines are increasingly accepted in modern marufacturing system for the flexbility to adjust to changes in demand. This paper considers multiple U line balancing with the objective of minimizing cycle time considering the moving time of workforce given the number of workstation. Like the traditional line balancing problem this problem is NP-hard. In this paper, we show how genetic algorithm can be used to solve multiple U line balancing problem. For this, an encoding and a decoding method suitable to the problem are presented. Proper genetic operators are also employed. Extensive computational experiments are carried out to show the performance of the performance of the purposed algorithm. The computational results show that the algorithm is promising in solution quality.

  • PDF

Line Balancing in the Multiple U-Type Lines Using Genetic Algorithms (유전알고리듬을 이용한 복수 U라인의 라인밸런싱)

  • 김동묵;김용주
    • Proceedings of the Safety Management and Science Conference
    • /
    • 1999.11a
    • /
    • pp.501-514
    • /
    • 1999
  • Multiple U-typed production lines are increasingly accepted in modern manufacturing system for the flexibility to adjust to changes in demand. This paper considers multiple U line balancing with the objective of minimizing cycle time considering of moving time of workforce given the number of workstation. Like the traditional line balancing problem this problem is NP-hard. In this paper, we show how genetic algorithm can be used to solve multiple U line balancing. For this, an encoding and a decoding method suitable to the problem are presented. Proper genetic operators are also employed. Extensive computational experiments are carried out to show the performance of the proposed algorithm. The computational results show that the algorithm is promising in solution quality.

  • PDF

Locally Initiating Line-Based Object Association in Large Scale Multiple Cameras Environment

  • Cho, Shung-Han;Nam, Yun-Young;Hong, Sang-Jin;Cho, We-Duke
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.4 no.3
    • /
    • pp.358-379
    • /
    • 2010
  • Multiple object association is an important capability in visual surveillance system with multiple cameras. In this paper, we introduce locally initiating line-based object association with the parallel projection camera model, which can be applicable to the situation without the common (ground) plane. The parallel projection camera model supports the camera movement (i.e. panning, tilting and zooming) by using the simple table based compensation for non-ideal camera parameters. We propose the threshold distance based homographic line generation algorithm. This takes account of uncertain parameters such as transformation error, height uncertainty of objects and synchronization issue between cameras. Thus, the proposed algorithm associates multiple objects on demand in the surveillance system where the camera movement dynamically changes. We verify the proposed method with actual image frames. Finally, we discuss the strategy to improve the association performance by using the temporal and spatial redundancy.

Design of a line balancing algorithm for the PCB assembly line including multiple surface mounters (다수 표면실장기계를 포함하는 PCB 조립라인의 라인균형화 알고리즘 설계)

  • Kim, Jin-Cheol;Lee, Sung-Han;Kim, Dae-Won;Lee, Bum-Hee
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.3 no.4
    • /
    • pp.381-388
    • /
    • 1997
  • This paper proposes a heuristic algorithm to efficiently perform line balancing in the PCB assembly line including multiple surface mounters efficiently. Generally, the problems in line balancing are classified into two kinds. Firstly, is the determining of the minimum number of machines required for achieving the desired production rate. Secondly, is the assign of jobs to multiple machines in order to minimize the cycle time which is defined as a maximum among the working times of machines when the number of machines is fixed. In this paper, we deal with the latter. We consider a PCB assembly line, including the multiple surface mounters arranged serially as a target system. Also, the conveyor is assumed to move at a constant speed and have no buffer. Considering that the minimum number of machines required for the desired production rate is a discrete nonincreasing function which is inversely proportional to the cycle time, we propose an optimization algorithm for line balancing by using the binary search method. The algorithm is validated through computer simulation, the results of which show that their shapes coincide nearly with those of optimal line balancing efficiency graphs regardless of the number of components, the performance of surface mounters, and the structure of assembly line.

  • PDF

Implementation of multiple access bidirectional serial communications protocol using DC power line (직류 전원선을 이용한 다중 접속 양방향 직렬통신 프로토콜 구현)

  • Han, Kyong-Ho;Kim, Won-Il;Hwang, Ha-Yoon
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.332-338
    • /
    • 2008
  • This paper handles, implementation of multiple access bidirectional serial communications protocol using two common DC power lines, whict are power supply and ground, connecting multiple devices. Communication between the host and the multiple clients are performed using unique packet data with device ID unique to each devices connected on the common power lines. Host initiates data communications by transmitting command packet to the designated client with the client's ID and the client responds by transmitting response packet to the host and in this way, multiple clients and host exchange the packet through the common power lines. The normal voltage of the power communication line maintains 24V corresponding to level 1 and the host drops the voltage to 12V on sending level 0 signal, also the clients normally keeps the line voltage to 24V use pull-down circuit to drop the voltage to 12V on sending level 1 signal. Power supply originates from the host, the host senses the voltage level of the power communication lines and when the clients activates pull down circuit to send level 0 signal and the voltage drops to 12V, the hosts switches power source from 24V to 12V. Also, when clients deactivate pull down circuit to send level 1 signal, the host senses the voltage increase and switches the power source from 12V to 24V. Experimental circuit is designed with one hosts and four clients and verified the power line voltage switching operation depending on the data signal levels on the power line. The proposed research result can be applied to two wire power communications system with one host and multiple low current consumption clients.

  • PDF

Two-Sided Assembly Line Balancing with Preemptive Multiple Goals Using an Evolutionary Algorithm (진화알고리즘을 이용한 선취적 다목표 양면조립라인 밸런싱)

  • Song, Won-Seop;Kim, Yeo-Keun
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.34 no.2
    • /
    • pp.101-111
    • /
    • 2009
  • This paper considers two-sided assembly line balancing with preemptive multiple goals. In the problem, three goals are taken into account in the following priority order : minimizing the number of mated-stations, achieving the goal level of workload smoothness, and maximizing the work relatedness. An evolutionary algorithm is used to solve the multiple goal problems. A new structure is presented in the algorithm, which is helpful to searching the solution satisfying the goals in the order of the priority. The proper evolutionary components such as encoding and decoding method, evaluation scheme, and genetic operators, which are specific to the problem being solved, are designed in order to improve the algorithm's performance. The computational results show that the proposed algorithm is premising in the solution quality.

Negative Group Delay Circuit with Improved Signal Attenuation and Multiple Pole Characteristics

  • Chaudhary, Girdhari;Jeong, Junhyung;Kim, Phirun;Jeong, Yongchae
    • Journal of electromagnetic engineering and science
    • /
    • v.15 no.2
    • /
    • pp.76-81
    • /
    • 2015
  • This paper presents a design of a transmission line negative group delay (NGD) circuit with multiple pole characteristics. By inserting an additional transmission line into a conventional NGD circuit, the proposed circuit provides further design parameters to obtain wideband group delay (GD) and to help reduce signal attenuation. As a result, the number of gain compensating amplifiers can be reduced, which can contribute to stable operation when integrated into RF systems. The multiple pole characteristics can provide wider NGD bandwidth and can be obtained by connecting resonators with slightly different center frequencies separated by quarter-wavelength transmission lines. For experimental validation, an NGD circuit with two poles GD characteristic is designed, simulated, and measured.