Estimating Risk Interdependency Ratio for Construction Projects: Using Risk Checklist in Pre-construction Phase

  • Kim, Junyoung;Lee, Hyun-Soo;Park, Moonseo;Kwon, Nahyun
    • Architectural research
    • /
    • v.21 no.2
    • /
    • pp.49-57
    • /
    • 2019
  • Risk assessment during pre-construction phase is important due to the uncertainty of the risks that may exist in projects. Risk checklist is a method to systematically classify and organize the risks that have been experienced in the past, and to identify the risk factors that may be present in the future projects. In addition, risk value assessment based on checklists plays a key role in risk management, and various risk assessment researches have been conducted to carry out this systematically. However, previous approaches have limitations in common, this is because risk values are evaluated individually in risk checklists, which ignore interdependencies among risk factors and neglect the emergence of co-occurrence of risks. Hence, when multiple risk factors cooccur, they cannot be far off from the conventional method of summing the total risk value to establish the risk response strategy. Most of risk factors are interdependent and may have multiple effects if occurred than expected. In particular, specific cause can be overlapped if multiple risks co-occur, and this may result in overestimation of the risk response for the future project. Thus, the objective of this research is to propose a model to help decision makers to quantify the risk value reflecting the interdependency during the identification phase using existing risk checklist that is currently being practiced in actual construction projects. The proposed model will provide the guideline to support the prediction and identification of the interdependency of risks in practice. In addition, the better understanding and prediction of the exceeding risk response by co-occurring risks during the risk identification phase for decision makers.

DERIVING ACCURATE COST CONTINGENCY ESTIMATE FOR MULTIPLE PROJECT MANAGEMENT

  • Jin-Lee Kim ;Ok-Kyue Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.935-940
    • /
    • 2005
  • This paper presents the results of a statistical analysis using historical data of cost contingency. As a result, a model that predicts and estimates an accurate cost contingency value using the least squares estimation method was developed. Data such as original contract amounts, estimated contingency amounts set by maximum funding limits, and actual contingency amounts, were collected and used for model development. The more effective prediction model was selected from the two developed models based on its prediction capability. The model would help guide project managers making financial decisions when the determination of the cost contingency amounts for multiple projects is necessary.

  • PDF

An improved algorithm for the exchange heuristic for solving multi-project multi-resource constrained scheduling with variable-intensity activities

  • Yu, Jai-Keon;Kim, Won-Kyung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1993.04a
    • /
    • pp.343-352
    • /
    • 1993
  • In this study, a modified algorithm for the exchange heuristic is developed and applied to a resource-constrained scheduling problem. The problem involves multiple projects and multiple resource categories and allows flexible resource allocation to each activity. The objective is to minimize the maximum completion time. The exchange heuristkc is a multiple pass algorithm which makes improvements upon a given initial feasible schedule. Four different modified algorithms are proposed. The original algorithm and the new algorithms were compared through an experimental investigation. All the proposed algorithms reduce the maximum completion time much more effectively than the original algorithm. Especially, one of four proposed algorithms obviously outperforms the other three algorithms. The algorithm of the best performance produces significantly shorter schedules than the original algorithm, though it requires up to three times more computation time. However, in most situations, a reduction in schedule length means a significant reduction in the total cost.

  • PDF

MIXED-USE PROJECT DEVELOPMENT PROCESS: FEATURES, PITFALLS AND COMPARISONS WITH SINGLE-USE PROJECTS

  • Charles Y.J. Cheah;Kok Sang Tan
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.335-340
    • /
    • 2005
  • In many urban cities, mixed-use development is becoming increasingly essential for the creation of an attractive and sustainable environment that promotes economic vitality, social equity and environmental quality. Due to the differences in scale, scope and intent, certain aspects within the project delivery process of mixed-use are not the same as "conventional" single-use projects. The objective of this paper is to highlight these aspects. Two cases in Southeast Asia serve to illustrate the uniqueness and challenges of mixed-use. In conclusion, the differences between mixed-use and single-use are evident in terms of the diversity of team members, the necessity of multiple market analyses, and a multi-layer (versus single-source) financing structure. Finally, issues concerning ownership tangles, land assembly, planning and application procedures, investment criteria of institutions have been identified as major pitfalls.

  • PDF

Government-funded Projects' Effects in Revitalizing the Urban Commercial District for Small and Medium Retail Merchants (도심지 상업지역의 정부 지원사업 효과 분석)

  • Kang, Seong-Ha;Lee, Jung-Hee;Hwang, Seong-Hyuk
    • Journal of Distribution Science
    • /
    • v.12 no.12
    • /
    • pp.101-106
    • /
    • 2014
  • Purpose - This study reviews the achievements of a pilot project for the revitalization of a commercial district performed for three years after its establishment in 2011. The project for the revitalization of the commercial district was performed to create a new local community space in connection with the traditional market and nearby districts. Although it was a pilot project, the project for the revitalization of the commercial district has been performed for almost three years. Therefore, this seems a proper time to conduct an interim evaluation of the project. This study aims to review and evaluate how the government support policy is influential for the revitalization of the commercial district. In other words, this research aims to identify what projects positively affected consumers' intention to revisit the downtown commercial area among the commercial district revitalization projects-promotion events, promotion activities, education, merchants cooperation system, IT projects, cultural events, and residents' communication. Research design, data, and methodology - This study designated seven management improvement projects affecting commercial district revitalization based on preceding studies. The survey of the degree of satisfaction on seven management improvement projects was executed targeting consumers who visited the commercial areas. Additionally, visitors' revisit intentions regarding currently visited commercial areas were also investigated. Therefore, revisit intention was set as a dependent variable and the satisfaction degrees of the respective management improvement projects were set as the independent variables. A total of 1,209 consumers were examined in six districts in the country. Result - Multiple regression analysis results showed that cultural events, education, the merchants' cooperation system, and IT projects brought statistically significant effects to the revisit intentions of consumers. In contrast, promotion events, resident communication projects, and promotion activities did not affect the revisit intentions of consumers. Particularly, the residents' communication project did not show significant influence because of consumers' recognition that it is similar to a cultural event. Conclusion - The following implications for the revitalization of business districts in the urban central area are drawn. From a general perspective, the businesses of culture, education, and cooperative system among seven businesses play positive roles regarding the intention to revisit so that the project is required to be promoted periodically through unique performances differentiated for each district, the merchant training reinforced for professionalism, and the expansion of joint events of merchants. Moreover, the sales promotion project and public relations activity are shown to be not influential to the intention to revisit. Therefore, while short-term sales promotion such as one-time gift events are required, sales promotion and public relation activities to induce revisits by mileage savings and accumulated gift presentation to attract long-term customers are required. The IT business is positively influential to the intention of revisit. Therefore, detailed information on the revitalized commercial district should be provided and additional functions such as discount coupons for continuous utilization should be included in the mobile app and the website.

Cost Prediction Model using Qualitative Variables focused on Planning Phase for Public Multi-Housing Projects (정성변수를 고려한 공공아파트 기획단계 공사비 예측모델)

  • Ji, Soung-Min;Hyun, Chang-Taek;Moon, Hyun-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.91-101
    • /
    • 2012
  • In planning phase of Public Multi-Housing Projects, it is required to develop the methodology and criteria for fair cost prediction with influencing power from planning phase to occupancy phase. Many studies still have focused on the prediction of cost by multiple regression. However, there is no logical explanation about the influence of nonmetric variables for the prediction of cost in planning phase. Accordingly, this research pursues a cost prediction model including nonmetric variables for use in planning phase. There are 3 steps of this research : 1) Finding the factors influencing construction cost and assigning variables for a multiple regression. 2) Conducting a dummy regression analysis with nonmetric variables and model validation by comparing actual cost data. 3) Developing the ratio of RC structure cost to wall structure cost by using cost predection model. The results could establish cost prediction process including the influence of nonmetric variables and the ratio of RC structure cost to wall structure cost.

The Effect of Process Maturity on the Performance of Industrial R&D Projects (프로세스 성숙도가 기업 R&D 프로젝트의 성과에 미치는 영향에 관한 연구)

  • Hong, Soon-Wook
    • IE interfaces
    • /
    • v.16 no.3
    • /
    • pp.362-374
    • /
    • 2003
  • The major objective of this paper is to empirically examine the effect of process maturity on the performance of industrial R&D projects. Process maturity, a fundamental concept of the Capability Maturity Model developed by Software Engineering Institute, represents the essential of Total Quality Management (TQM). Based on literature, our research model constructs process maturity in terms of structured process, goal setting and controlling, metrics, and process learning; and links it to the R&D performance that consists of technical, commercial and managerial successes. The model also includes firm size as a moderator of different effects that process maturity may have across firms. Measures for process maturity are based on the best practices identified in literature. Data are obtained from 77 successful R&D projects carried out by Korean manufacturing firms. Multiple regression and t-test are used to test proposed hypotheses. Findings are as follows. (1) In the R&D process, process maturity partially contributes to the performance of R&D projects. More specifically, goal setting and controlling-related practices drive both technical and commercial successes, while process learning-related practices drive commercial success. In contrast, traditionally emphasized elements such as structured process or metrics are found not to be significant. (2) The degree of process maturity is significantly higher in large firms. (3) Process maturity impacts on commercial success in the case of large firms, whereas it does on technical success in the case of small firms. The results imply that the TQM principles are partially associated with R&D performance, and the nature of benefit from high maturity could vary according to firm size.

A Study on Smart City Project Evaluation System: Focusing on Case Analysis of IFEZ Smart City (스마트시티 프로젝트 평가체계에 대한 연구: IFEZ 스마트시티 사례분석을 중심으로)

  • Sang-Ho Lee;Hee-Yeon Jo;Yun-Hong Min
    • The Journal of Bigdata
    • /
    • v.8 no.1
    • /
    • pp.83-97
    • /
    • 2023
  • Project evaluation is the process of evaluating the progress and results of a project. Smart city projects can be divided into system components (infrastructure, services, platforms), or projects can run simultaneously for multiple services. In addition, services are developed and expanded through additional projects. In order to ensure that the smart city, which is composed of various projects, proceeds in accordance with the goals and strategies, periodic project evaluation is required during the project implementation process. The smart city project evaluation system proposed in this paper is designed to provide comprehensive and objective indicators by reflecting various factors that must be considered for projects occurring in all stages of planning, design, construction, and operation of smart cities. The indicators derived from the evaluation system can be used by decision makers to determine the direction of smart city project development. In addition, it is designed so that the performance of the project can be evaluated interim before the end of the project and the feedback obtained from it can be reflected. To introduce the application method of the smart city project evaluation system proposed in this study, the evaluation system developed in this study was applied to the smart city project case of Incheon Free Economic Zone (IFEZ). Based on the evaluation results, items that can maximize the improvement effect of each smart city project item were presented, and the direction of smart city project implementation was suggested. By utilizing a smart city project evaluation system that reflects the characteristics of smart city projects that are composed of multiple projects, comprehensive planning and management of smart city projects will be possible, and this study will serve as a reference for identifying priority improvement factors for projects.

An Analysis of Profitability Study of Overseas Construction Projects using Multiple-Regression (다중회귀분석을 통한 해외 건설 프로젝트 특성요인이 손익율에 미치는 영향 분석)

  • Kim, Jineon;Kim, Yeasang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.95-103
    • /
    • 2014
  • From $1960^{th}$ Korean construction industry has been rapidly grown due to Meddle-East construction market growth. To earn foreign currency and to raise overall Korean industry government has encouraged construction frontiers. As construction industry could grow up for its labour based originity but the time passes by and overseas construction market requests engineering know-how and technology for productivity to earn more profit. Over last 20 years overseas construction market share has been dramatically raised but its profit share is gradually declining. This study analyzed data sets of over 180 overseas construction projects for last 30 years of domestic contractor by using multiple-regression analysis and derived an output how input variables of characters explaining the construction project effects its profit.

A Strategic Decision Making Model Using Project Scheduling Technique (프로젝트 일정관리기법을 활용한 전략적 의사결정모형)

  • Ahn Tae-Ho
    • Management & Information Systems Review
    • /
    • v.13
    • /
    • pp.127-140
    • /
    • 2003
  • Although there have been continual researches in the project scheduling problems since 1960s, the main interest has been how to improve the efficiency of a single project. The minimization problem of the project completion time given a preassigned budget might be an example. This kind of the problem is important, but estimating of the proper budget for a project may also be very important. This research deals with the budget allocation problem for the multiple project. This research is unique in that the project scheduling techniques are used for the budgeting problem. Therefore, this research may be used as a strategic decision model for the multiple large projects in public sector.