1 |
Trinh, B., Secretario, F. T., Kwangmun, K., & Giang, P. H. (2000). Economic-environmental impact analysis based on a bi-region interregional IO model for Vietnam. Working Paper.
|
2 |
Tuysuz, F., & Kahraman, C. (2006). Project risk evaluation using a fuzzy analytic hierarchy process: an application to information technology projects. International Journal of Intelligent Systems, 21(6), 559-584.
DOI
|
3 |
Wideman, R. Max. (1992). Project and Program Risk Management: a guide to managing project risks and opportunities. Newtown Square, PA: Project Management Institute
|
4 |
Yildiz, A. E., Dikmen, I., Birgonul, M. T., Ercoskun, K., & Alten, S. (2014). A knowledge-based risk mapping tool for cost estimation of international construction projects. Automation in Construction, 43, 144-155.
DOI
|
5 |
Yoon, K., & Oh, D. (2010). Analysis of Regional Interdependence in Dongnam Economic Region for Suggesting Interregional Cooperation in Fields of Industry. Journal of the Korean Urban Administration Association, 23(3), 303-322.
|
6 |
Kim, J., & Kim, Y. (2010). Analysis of risk transfer among financial regions using CoVaR. Social Sciences Research Institute, 23, 75-103.
|
7 |
Kwan, T. W., & Leung, H. K. (2011). A risk management methodology for project risk dependencies. IEEE Transactions on Software Engineering, 37(5), 635-648.
DOI
|
8 |
Teller, J., & Kock, A. (2013). An empirical investigation on how portfolio risk management influences project portfolio success. International Journal of Project Management, 31(6), 817-829.
DOI
|
9 |
Cavallo, A., & Ireland, V. (2014). Preparing for complex interdependent risks: a system of systems approach to building disaster resilience. International journal of disaster risk reduction, 9, 181-193.
DOI
|
10 |
Yoo, I., Choi, S., Cho, T., Koo, B., & Yoon, Y. (2006). The Risk Analysis of Construction Method for Field Work. Journal of the Korean Society for Railway, 20-31.
|
11 |
Hwang, J., & Lee, C. (2004). A Risk Management Method Using Fuzzy Theory for Early Construction Stage. Korean Journal of Construction Engineering and Management, 5(2): 136-143.
|
12 |
Kim, K., Kim, K., Lee, Y., & Kim, J. (2008). A Research about Influence of Risk Factors in Relation to Construction Cost Increase and Schedule Delay on the Reinforced Concrete Construction. Journal of the Architectural Institute of Korea Planning & Design, 24(5): 165-172.
|
13 |
Grey, Stephen. (1995). Practical Risk Assessment for Project Managemet. ICL, UK: John Wiley & Sons
|
14 |
Kim, S. (2015). Risk Value Calculation Method for Moderate Risk Concentration Type at Qualitative Risk Analysis Phase. Korean Journal of Construction Engineering and Management, 16(2): 38-45.
DOI
|
15 |
Lee, M., Park, B., & Im, K. (2008). A Study on the Estimation of Change Orders Impact for the Public Construction. Journal of the Korean Society of Civil Engineers, 28(3D): 363-369.
|
16 |
Chapman, R. J. (2001). The controlling influences on effective risk identification and assessment for construction design management. International Journal of Project Management, 19(3), 147-160.
DOI
|
17 |
Eybpoosh, M., Dikmen, I., & Talat Birgonul, M. (2011). Identification of risk paths in international construction projects using structural equation modeling. Journal of Construction Engineering and Management, 137(12), 1164-1175.
DOI
|
18 |
Fu, Y., Li, M., & Chen, F. (2012). Impact propagation and risk assessment of requirement changes for software development projects based on design structure matrix. International Journal of Project Management, 30(3), 363-373.
DOI
|
19 |
Hong, G. (1995). A Research on the Structure of Interdependence in Organizations and the Measurement Method.
|
20 |
Iyer, K. C., & Sagheer, M. (2009). Hierarchical structuring of PPP risks using interpretative structural modeling. Journal of Construction Engineering and Management, 136(2), 151-159.
DOI
|
21 |
Lee, E., & Bu, S. (2006). A Research on the Interdependence Analysis Method of Regional Economy. Quarterly National Accounts, 4th edition, 126-164.
|
22 |
Leu, S. S., & Chang, C. M. (2013). Bayesian-network-based safety risk assessment for steel construction projects. Accident Analysis & Prevention, 54, 122-133.
DOI
|
23 |
Liu, H. T., & Tsai, Y. L. (2012). A fuzzy risk assessment approach for occupational hazards in the construction industry. Safety science, 50(4), 1067-1078.
DOI
|
24 |
Mulcahy, R. (2003). Risk Management: Tricks of the for Project Managers. MN: RMC Publications
|
25 |
Oosterhaven, J., & Hewings, G. J. (2014). Interregional input-output models. In Handbook of regional science (pp. 875-901). Springer Berlin Heidelberg.
|