Multiple Regression Technique for Productivity Analysis of the Jointed Plane Concrete Pavement (JPCP)

  • Yoo, Wi-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.268-276
    • /
    • 2008
  • In highway construction projects, concrete pavement productivity has been challenged with constructors and decision-makers; at present there are few methods available to accurately evaluate the factors impacting on it. Any inefficient method to analyze it leads to the excessive schedule, higher rehabilitation costs, shorter service life, and reduction of ride quality. To implement these negative outcomes, constructors or decision-makers need a systematic tool that can be used to categorize the factors related to construction productivity. This paper applies multiple regression technique for productivity analysis of the Jointed Plane Concrete Pavement (JPCP), identifies the significant factors, and provides a predictive model assisting in monitoring and managing the productivity of the JPCP construction process. The completed and progressive projects are employed to derive and assess the proposed model. The results are analyzed to illustrate its capabilities.

Critical Assessment of Programme-Based Conflict Resolution Model Applied to Multiple Stakeholders Within The Context of Industrialized Building Production and Life Cycle Supply Chain System

  • Tanaka, Koji
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.551-562
    • /
    • 2022
  • The building production system has been analysed by the dichotomy "employer-contractor" relationship, which failed to take into account of the role and function of multiple stakeholders within the life-cycle supply chain. This is further observed in the current conflict resolution model, which, in my argument, struggles to contribute to industrialize the building production and achieve better efficiency and effectiveness as expected. The purpose of this paper is to critically assess the issues of current programme-based conflict resolution model, and discuss alternative models how they can be modelled and applied to the construction projects. The conclusions of findings are; First, the current model is framed around the contracts and dispute resolutions based on the legal concept of "claimant and respondent" where one party(s) advances a claim once and the other(s) objects, as such it fails to reflect the nature of construction projects where multiple stakeholders are involved concurrently and for a long period of life-cycle of buildings. Second, an alternative is "Six-stakeholders model" which represents the multiple stakeholders and clarifies the flow of obligation-liability-monetary relationships among participants for a long period of life-cycle of buildings. Further, with reference to both historical and recent cases, a reflection and insight into pros and cons of programming method is added, especially as to why this method is considered to have become a mandate of the modern construction management, and how academics and practitioners should deal with it more cautiously and prudently.

  • PDF

Limiting the Number of Open Projects to Shorten the NPD Schedule

  • Wang, Miao-Ling;Yang, Chun-I;Chang, Sheng-Hung
    • Industrial Engineering and Management Systems
    • /
    • v.10 no.1
    • /
    • pp.34-42
    • /
    • 2011
  • Many companies open multiple projects simultaneously due to market trends, which results in a crowding out effect because of limited resources. R&D engineers become overloaded and scheduling of product development is delayed resulting in timing misses and lost sales leads. The company in this case study (Company A), often opens up many projects simultaneously in order to respond to market needs quickly. The engineers are overloaded and, of course, the schedule is delayed. In order to identify problems, Company A began using Dr. Goldratt's Thinking Processes (TP) during new product development (NPD). When the analysis phase of TP was completed, Company A's core problem was identified as "the quantity of kick-off projects." Consequently, new rules and conditions and procedures were proposed for the opening, suspending, stopping, and closing of projects. Finally, the "Future Reality Tree" ensured that the proposed rules, conditions and procedures were set up as an available solution approved for practical application by executives. After a one-year trial run, the results showed that the Project Duration Rate was reduced by 53%, the Project Closed Rate was increased by 140% and the Project on Time Rate was increased from 10% to 68%. The above results give significant evidence of the benefits of the proposed methodology.

A Case Study of Information System Auditing of CBD Project (CBD프로젝트의 정보시스템감리 사례연구)

  • 조남재;박기호;전순천;박준호
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.2
    • /
    • pp.167-178
    • /
    • 2004
  • Different from traditional development methodologies like waterfall model, the CBD (component based development) methodology relies on a building block approach in the design and development of information system. The audit procedure and checklist for the traditional IS development methodology are required to be modified to be suitable for CBD. This research reviewed IS audit guidelines for the existing development process and analyzed multiple projects that employed the by component based development process. For the purpose of this study, we chose a governmental project and a next-generation IS project of a financial agency as sample cases. By comparing existing IS audit checklists and items actually reviewed in audit projects, this study identified appropriate check items for the CBD-centric audit program. New items were proposed as additional items such as project control in management phase, usage case and conceptual model establishment, component evaluation and design, in implementation phase, and so forth. The result of the research provides new guidelines for the audit CBD projects for the purposed of increased efficiency and qualify of application development projects.

  • PDF

MODELS FOR PREDICTING SINGAPORE CONTRACTORS' EXTENT OF INTERNATIONALIZATION

  • Florence Y.Y. Ling;Denise H.Y. Kwok
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.995-999
    • /
    • 2009
  • Before a contractor embarks on exporting its services, it needs to know if it is likely to succeed. This research developed two prediction models to help contractors in Singapore predict the number of projects (Y1) and the contract values (Y2) that they are likely to secure from overseas. Detailed characteristics of 60 contractors who export their services (exporters) were obtained from the database of registered contractors in Singapore. Multiple linear regression models were developed and tests showed that Y1 is a robust model. A contractor's chance of winning more overseas projects may be predicted by the number of projects it acted as a subcontractor; the variety of projects it undertakes; the total contract value in the domestic market; and the number of countries it exported its services to. It is recommended that contractors who are planning to export their services be flexible instead of adopt a focused policy of undertaking only one or two project types in a few selected countries.

  • PDF

Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF

Scheduling of Matrix Organization for Software Development using Genetic Algorithm (유전자 알고리즘을 이용한 매트릭스조직의 소프트웨어 개발 스케쥴링)

  • Yang, Mi-Na;Lee, Gun-Ho
    • Korean Management Science Review
    • /
    • v.23 no.2
    • /
    • pp.187-198
    • /
    • 2006
  • Efficient scheduling for software development is a major concern for software engineers. Industries simultaneously try to perform a variety of projects with the limited resources on schedule. A way to overcome the limitation of resources is sharing of the resources through the projects. This study discusses the matrix organization for software development. A scheduling for matrix organization is a special case of project management problem. The ultimate goal of scheduling problem in this study is to minimize the overall duration of the multiple projects. A genetic algorithm is presented to solve the scheduling problem of the matrix organization and is substantiated with numerical results.

Software Development Scheduling for Matrix Organization (매트릭스조직의 소프트웨어 개발 스케쥴링)

  • Yang, Mi-Na;Lee, Geon-Ho
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.11a
    • /
    • pp.67-70
    • /
    • 2006
  • Efficient scheduling for software development is a major concern for software engineers. A industry simultaneously performs a variety of projects with the limited resources without overdue. A way to overcome the limitation of resources is sharing of the resources through the projects. This study discusses the matrix organization for software development. A scheduling for matrix organization is a special case of project management problem. The ultimate goal of scheduling problem in this study is to reduce the overall duration of the multiple projects. A genetic algorithm is presented to solve the scheduling problem of the matrix organization and is substantiated with numerical results.

  • PDF

A Practical 1 Page Contextual Diagram for Monitoring Multiple Projects: An Empirical Study of an IT Organization

  • Lee, Jung-Gyu;Jeong, Seung-Ryul
    • Journal of Internet Computing and Services
    • /
    • v.17 no.5
    • /
    • pp.121-129
    • /
    • 2016
  • Company A, an embedded system manufacturer, has been managing multiple development projects. Executives need to understand the risk level of every project and prioritize resource distribution. Traditional project monitoring tools or excel sheets are too complex for calculating the risk factors across a functional organization. Two new charts, "Spear-head Chart" and "Float Chart" were designed to assist high level decision making processes. Two charts were used for weekly executive meetings in order to monitor project progress and rectify project direction. One page graphical monitoring tools in Company A are good enough for high management decision making. Authors explain the characteristics of two charts and propose its practical implementation in real working environment. Spear-head chart was also implemented as a system.

Influence of Site Organization's Communication on Performance of Building Construction Projects (건축프로젝트 현장 조직 커뮤니케이션이 성과에 미치는 영향)

  • An, Sung-Hoon;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.361-367
    • /
    • 2017
  • The success of building construction projects is dependent on the cooperative ability of site organization members, which related with an organizational communication level. Therefore, the purpose of this study is to study the influence of site organization's communication on the performance of building construction projects. The results of this research are revealed that the communication quality has positive influence on the performance of building construction projects, and the information sharing has negative influence based on the results of the multiple regression analysis. So it needed to improve the performance in building construction projects that the information is shared with a normal level. the communication quality should be also raised in the project site organization. This study is expected to help to structure the site organizational management system in the building construction projects.