1 |
Grimm, C.T. and Wagner, N.K. (1974) "Weather effects on mason productivity", ASCE, Journal of the Construction Division, Vol. 100, pp. 319-335
|
2 |
Lee, E.B., Ibb, C.W., and Harvey, J.T. (2000)" Part 1 - Portland Cement Concrete Pavement (Construction Productivity and Constraints for Concrete Pavement Rehabilitation in Urban Corridors)" Transportation Research Record, No. 1712, pp. 13-25
|
3 |
Packard, R.G. (1994) "Pavement Costs and Quality", Concrete International: Design & Construction, Vol. 16, No. 8, pp. 36-38
|
4 |
Zayed, T., Halpin, D., and Basha, I. (2005) "Productivity and delays assessment for concrete batch plant-truck mixer operations", Construction Management and Economics, Vol. 23, No. 8, pp. 839-850
DOI
ScienceOn
|
5 |
Lee, D.G. (2005) "Construction factors affecting asbuilt roughness of Portland cement concrete pavement construction", Canadian Journal of Civil Engineering, Vol. 32, No. 5, pp. 906-912
DOI
ScienceOn
|
6 |
Crovetti, J.A. and Bischoff, D. (2001) "Construction and Performance of Alternative Concrete Pavement Designs in Wisconsin", Transportation Research Record, No. 1778, pp. 43-53
|
7 |
Thomas, H.R. and Sakarcan, A.S. (1994) "Forecasting labor productivity using factor model", Journal of Construction Engineering and Management, Vol. 120, No. 1, pp. 228-239
DOI
ScienceOn
|
8 |
Lee, E.B., Ibb, C.W., and Harvey, J.T. (2002) "Part 5 - Construction Management (Construction Productivity Analysis for Asphalt Concrete Pavement Rehabilitation in Urban Corridors)" Transportation Research Record, No. 1813, pp. 285-294
|