In this study, authors investigated the attachment of toddlers to their mothers and teachers and overall development based on their gender differences. The subjects of the study are 80 toddlers who are 25~36 months, their mothers, and teachers. We analyzed our data using t-test and two way ANOVA, and the results are as follows. First, the groups categorized by the types of the attachment between the toddlers and the mothers and the gender difference demonstrated the developmental distinctions, respectively. The interactional effects of the two factors emerged in communication and basic living. Second, the groups categorized by the types of the attachment between the toddlers and the teachers and the gender difference demonstrated the developmental distinctions, respectively. The interactional effects of the two factors emerged in gross motor skills, fine motor skills, and cognition. Third, with respect to the types of multiple attachments to mothers and teachers, toddler development brought meaningful differences. We discussed the importances of the attachment of the toddlers and the role of teachers based on the results of our research and proposed future projects and suggestions.
Journal of the Korean Institute of Landscape Architecture International Edition
/
no.2
/
pp.120-129
/
2004
Urban stream restoration projects can improve water quality, wildlife habitats, urban landscape, outdoor recreation spaces, and urban microclimate. The objectives of this research were to investigate temperature cooling effect of urban streams by using satellite imagery, to evaluate environmental variables related to stream cooling effect, and to estimate the cooling effect of the Cheonggye stream restoration project of Seoul, Korea. Findings of this research can be summarized as follows. First, a method of estimating temperature distribution around urban streams by using satellite imagery was developed. Scatter plots of distance from stream edges and average temperature obtained through multiple buffering were used for the estimation. Second, urban temperature cooling effect of streams was estimated by comparing background temperature and temperature of each buffer zone. Third, environmental factors affecting stream cooling effect were also identified. Fourth, the temperature cooling effect of the restoration project was estimated based on three scenarios. An estimated cooling effect based on the average cooling effect of existing tributaries showed the most significant effect; $2.0^{\circ}C$ lower than the present level at the edge of the renovated stream. It was estimated that the temperature of the same area would be $1.4^{\circ}C$ cooler than the present level if the cooling effect of the Yangjaechun was used as the bench mark But the effect would be $1.2^{\circ}C$ lower than the present level if environmental variables related to the temperature cooling effect of urban streams were used as the bench mark.
The purpose of this research was to evaluate rural housing environment through evaluation of the two parties, public officials, the interest group and residents, the beneficiaries surveying general understanding and measuring difference in understanding between public officials and residents. Through the difference in understanding, this study was to propose effective promotion method and desirable direction of rural housing environment. For progress hereafter, by seeking active involvement of residents, this study proposed possible renewal plan of residential environment. Process of this study was first, research documents to examine several rural housing environment related promotions, and several analysis techniques like principal component analysis, multiple regression analysis used to understand different ideas Opinion of Public Officials and Inhabitants. Then take surveys of residents living in renewal zone, and surveys of public officials of borough, which already performed renewal projects to evaluate comprehensively as either residents' or administrators' view.
This study analyzed the relationship between occupational accidents in the construction industry and business cycle factors. Multiple regression analyses were conducted to achieve the research purpose; additionally, time-varying parameter estimations were performed to interpret the results. The results obtained for the construction industry revealed a statistically significant relationship between occupational accidents and wage increase rate, unemployment, construction starts, and other factors. The wage increase rate plays a role in reducing occupational accidents because efforts are made to prevent accidents owing to the increase in income loss due to accidents and the demand for increased safety levels. The number of construction starts affects occupational accidents with a time lag of 1 to 2 or 4 months; therefore, it is likely to be used as a leading indicator for estimating fatal accidents in the construction industry. This study highlighted the importance of monitoring socioeconomic changes that could affect the working conditions of workers and workplaces, and production activities in the workplace for the effective prevention of occupational accidents. This study also reveals the necessity of developing a method to operate prevention projects flexibly and the seasonality of industrial characteristics, particularly those of the construction industry where the highest number of fatal occupational injuries occur.
The purpose of this research investigates the determinant factors of the joint technology development project performance between SMEs and universities. Reviewing existing papers we could categorize independent variables into three groups of partner characteristics, process management variables and relationship characteristics between partners. Three measures of satisfaction with the cooperation result, the intention of continuing relationship and the utilization of developed technology and product were used as dependent variable considering that we studied the joint projects of SMEs' involvement, short period and small scale. The data was collected by questionnaire survey mailed to the 1082 SMEs and university professors which executed the joint projects sponsored by Small Business Administration in 2009. We received 200 responses from SMEs, and 305 cases from professors among which 55 responses of each partner were on the same project. We analyzed the data sets individually, data of SMEs and that of universities with multiple regression analysis technique and also analyzed the common responses of 55 projects. Analysis results of the data from SMEs indicated that partners' expertise, facilities and equipment, communications, strategic importance, and trust were significant variables for the project performance. Analysis results of the data from universities showed that previous links, definition of objectives, strategic importance, trust and commitment were significant variables. Analysis results of combined data of 55 projects from SMEs and universities indicated that facilities and equipment, project management proficiency and commitment were significant variables.
Asia-Pacific Journal of Business Venturing and Entrepreneurship
/
v.13
no.4
/
pp.117-128
/
2018
Various government support policies are being promoted in order to stimulate growth of SMEs. The government is striving to provide effective support through direct methods of tax, finance and indirect methods through support programs. However, the view on the government's startup policy is still tense. We are sympathetic with the need for support, but discussions continue to be made on the effectiveness of support projects and support projects. Therefore, this study evaluates the importance and satisfaction of the government start-up support project. For this purpose, we conducted questionnaires on ICT start-ups who have experienced government start-up support projects. Of these, 128 were analyzed for GAP analysis and ISA. As a result of the GAP analysis of the government start - up support project, the degree of satisfaction (4.408) was lower than the degree of importance (5.221), confirming that the beneficiary's evaluation on the start-up support project was negative. As a result of the importance-satisfaction analysis, 'R&D' and 'commercialization' are located in the maintenance area, and 'government funding', 'marketing, overseas advancement' projects are included in the concentrated area. In the low-ranking areas, there are 'entrepreneur events and networks' items. Finally, there are 'facilities and spaces', 'mentoring and consulting', and 'entrepreneurship education' in the surplus areas. As a result of multiple regression analysis, it was found that 'R&D', 'entrepreneurial education', and 'government funding' influenced satisfaction. Based on the results of this study, it is expected that it will contribute to improving the quality level of the government start-up support project by establishing the support policy for the ICT start-up enterprises and improving the system.
Korean Journal of Construction Engineering and Management
/
v.11
no.3
/
pp.23-32
/
2010
Construction Projects have mutual collaborative structures among various participants for common objectives. Most of all the design project which is the initial phase in the project is crucial for determining project overall quality and requires intimate and continuous relations between project participants. Thus, this study suggests Design Collaboration Management System for successful performing projects through cooperation among participants in the initial stage of projects. First, expert interviews were performed to figure out present conditions of design collaboration management and problems. The factor analysis was applied to draw owner's collaboration factors and engineer's collaboration factors. Based on those factors, this study suggests design cooperation management process which gives a framework for systematic management method. Through the process the design collaboration management system was developed which helps owner/designers/engineer's co-work. The System suggested from this study realizes systematic information management tool and through that it is expected to improve design product;'s quality, and further contribute the advancement of project.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.176-183
/
2008
Recently, several large-scale Mega-Projects are being conducted. For these urban revitalization projects which requires many complex functions, the existing project management system based on single project level is limited in application. Therefore, our main objectives of this research are two 1) Develop a brand-new program management system(Prototype Ver 1.0) for mega-projects where various facilities are combined both horizontally and vertically. 2) Develop management strategies(Prototype Ver 1.0) based on the program level that enable the comprehensive management of a multiple various projects. The subtitles of this Research are i-PMIS(Program Management Information System) Development, Standardization & Optimization of Construction Life-Cycle Process, Comprehensive Project Cost & Process Management Technology, Effective and Optimized Integrated Performance Management Technology, and, we suggest to optimize the whole life cycle process, predict and respond to various risks, predict and control the process, the cost and the schedule, achieve maximum return on investment to the participating parties, and provide a brand-new Program-MIS including the visual-based web-portal platform to respond the changing business environments and decision making.
The recent advancements in Smart City and Digital Twin technologies have highlighted the critical role of integrating GIS and BIM in urban planning and construction projects. This integration ensures the consistency and accuracy of information, facilitating smooth information exchange. However, achieving interoperability requires standardization and effective project integration management strategies. This study proposes interoperability solutions for the integration of GIS and BIM for managing various projects. The research involves an in-depth analysis of the IFC schema and data structures based on the latest IFC4 version and proposes methods to ensure the consistency of reference point coordinates and coordinate systems. The study was conducted by setting the EPSG:5186 coordinate system, used by the National Geographic Information Institute's digital topographic map, and applying virtual shift origin coordinates. Through BIMvision, the results of the shape and error check coordinates' movement in the BIM model were reviewed, confirming that the error check coordinates moved consistently with the reference point coordinates. Additionally, it was verified that even when the coordinate system was changed to EPSG:5179 used by Naver Map and road name addresses, or EPSG:5181 used by Kakao Map, the BIM model's shape and coordinates remained consistently unchanged. Notably, by inputting the EPSG code information into the IFC file, the potential for coordinate system interoperability between projects was confirmed. Therefore, this study presents an integrated and systematic management approach for information sharing, automation processes, enhanced collaboration, and sustainable development of GIS and BIM. This is expected to improve compatibility across various software platforms, enhancing information consistency and efficiency across multiple projects.
This paper introduces the time-misalignment error between multiple range measurements acquired by an onboard distance measuring equipment (DME) interrogator and proposes an efficient position determination method that can mitigate the negative effects of the time-misalignment error. The introduced time-misalignment error does not occur in conventional utilization of DME combined with VHF omnidirectional range (VOR). The proposed position determination method projects all the DME range measurements acquired irregularly during an interval to the same time instance where the aircraft position is determined. By the simulation utilizing a representative aircraft trajectory, it is shown that it is possible to estimate the horizontal position accurately without any changes of ground DME facilities.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.