• Title/Summary/Keyword: Multi-Criteria Decision

Search Result 384, Processing Time 0.028 seconds

An Integrated AHP-VIKOR Methodology for Facility Layout Design

  • Shokri, Hamidreza;Ashjari, Behzad;Saberi, Morteza;Yoon, Jin Hee
    • Industrial Engineering and Management Systems
    • /
    • v.12 no.4
    • /
    • pp.389-405
    • /
    • 2013
  • A facility layout design (FLD) problem can be generally introduced as assignment of facilities (departments) to a site such that a set of criteria are satisfied or some objectives are minimized (maximized). Hence, it can be considered as a multi-criteria problem due to the presence of qualitative criteria such as maintenance or flexibility and quantitative criteria such as the total cost of handling material. The VIKOR method was developed to solve multiple criteria decision making problems with conflicting and non-commensurable (different units) criteria, assuming that compromising is acceptable for conflict resolution, the decision maker wants a solution that is the closest to the ideal, and the alternatives are evaluated according to all established criteria. This paper proposes a hierarchical analytic hierarchy process (AHP) and VIKOR approach to solve the FLD problem. A computer-aided layout-planning tool is adopted to generate the facility layout problems, as well as their quantitative data. The qualitative performance measures are weighted by AHP. VIKOR is then used to solve the FLD problem. Finally, the proposed integrated procedure is applied to three real-time examples.

Evaluation of Risk Factors in Water Supply Networks using PROMETHEE and ANP (PROMETHEE와 ANP 기법을 활용한 상수도관망의 위험요소 평가)

  • Hong, Sung-Jun;Lee, Yong-Dae;Kim, Sheung-Kown;Kim, Joong-Hoon
    • IE interfaces
    • /
    • v.19 no.2
    • /
    • pp.106-116
    • /
    • 2006
  • In this study, the priority of risk factors in supplying water through water supply pipeline network was evaluated by PROMETHEE and ANP multi-criteria decision analysis. We chose 'corrosion', 'burst' and 'water pollution' in pipe as major reference criteria and selected eight risk factors to evaluate the priority, and then we compared the results of PROMETHEE with those of ANP. We also analyzed the results of the sensitivity analysis by changing the weights and parameters of preference functions in PROMETHEE. We investigated the possibility of integrating two methods by using the results of ANP as the weights of preference function in PROMETHEE. The priority of risk factors for supplying municipal water which is evaluated by this study may provide basic data to establish a contingency plan for accidents, or to establish the specific emergency response procedures.

Multi-Criteria Group Decision Making under Imprecise Preference Judgments: Using Fuzzy Logic with Linguistic Quantifier

  • Choi, Duke-Hyun;Ahn, Byeong-Seok;Kim, Soung-Hie
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2005.11a
    • /
    • pp.557-567
    • /
    • 2005
  • The increasing complexity of the socio-economic environments makes it less and less possible for single decision-maker to consider all relevant aspects of problem. Therefore are, many organizations employ groups in decision making. In this paper, we present a multiperson decision making method using fuzzy logic with linguistic quantifier when each of group members specifies imprecise judgments possibly both on performance evaluations of alternatives with respect to the multiperson criteria and on the criteria. Inexact or vague preferences have appeared in the decision making literatures with a view to relaxing the burdens of preference specifications imposed to the decision-makers and thus taking into account the vagueness of human judgments. Allowing for the types of imprecise judgments in the model, however, makes more difficult a clear selection of alternative(s) that a group wants to make. So, further interactions with the decision-makers may proceed to the extent to compensate for the initial comforts of preference specifications. These interaction may not however guarantee the selection of the best alternative to implement. To circumvent this deadlock situation, we present a procedure for obtaining a satisfying solution by the use of linguistic quantifier guided aggregation which implies fuzzy majority. This is an approach to combine a prescriptive decision method via a mathematical programming and a well-established approximate solution method to aggregate multiple objects.

  • PDF

A Decision Making Method between Reconstruction & Remodeling for Improvement of the Apartment Housing (공동주택 개량을 위한 재건축과 리모델링의 사업 추진 결정 방법)

  • Kim Hyung-Man;Yoon Suk-Ho;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.476-479
    • /
    • 2004
  • In the process of industrialization of our country in 1970's, Korea's housing strategy has focused on housing supply. Rapid completion and supply of apartment house buildings have caused a problem of their early deterioration due to their poor quality. In 1987 Housing Construction Promotion Act, therefore, included new regulations on housing re-construction. In July 2001, other new regulations on remodeling apartment buildings were also included in the Act. Reconstruction and remodeling have been considered to deal with such problems. This study suggests an appraisal criteria if they can select reconstruction or remodeling method in conducting their apartment building project. At first, evaluation items should be selected by the criteria of function31ity and economical efficiency. Second, the selected item is screened by AHP and multi-criteria decision-making methods. The result of study shows that the owners of apartment units will be able to select reasonable alternatives through the suggested appraisal method

  • PDF

Multi-Criteria Decision Making Procedure under Incompletely Identified Preference Information

  • Ahn, Byeong-Seok;Kim, Jae-Kyeong;Kim, Soung-Hie
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.23 no.3
    • /
    • pp.63-73
    • /
    • 1998
  • The paper deals with interactive multiple criteria decision making procedure when decision maker (DM) specifies her or his preference in incomplete ways. Usually DM is willing or able to provide only incomplete information, because of time pressure and lack of knowledge or data. Under incomplete information on utility and attribute weight, the pairwise dominance checks result in strict or weak dominance values. Considering only strict dominance values sometimes fails to Prioritize alternatives because of fuzziness of preference information. Further there exists some information loss useful if used, otherwise. In this paper, we consider the outranking concept which implies the willingness of DM's taking some risk under the least favorable situation because she has enough reasons to admit the results. By comparing the magnitude of net preference degree of alternatives which is defined by difference between outrankings and outranked degree of each alternative, we can prioritize alternatives.

  • PDF

Application of the Analytic Hierarchy Process (AHP) on the National Nuclear R&D Projects (원자력연구개발사업의 사후평가를 위한 계층화 분석법(AHP)의 적용)

  • 곽승준;유승훈;신철오
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2001.05a
    • /
    • pp.369-385
    • /
    • 2001
  • A R&D project evaluation method has been applied for the national nuclear R&D projects in a developing-country setting. In the methodology, Saaty's analytic hierarchy process model is used to evaluate and rank of the selected nuclear R&D project which have a wide range of objectives and characteristics. The criteria used for evaluation related specifically to the Korea's evaluation needs and culture, and they are weighted according to their relative importance as perceived by the evaluator of the R&D project. As a real-world case of evaluation, we elicited and reproduced the evaluation process of the nuclear R&D projects which is going under the research process. As the results of the paper suggests, the methodology can be applied to the evaluation of the R&D projects and has much potential.

  • PDF

An optimization usability of information system project resources: using a QFD and Zero-One Goal Programming for reflection customer wants

  • Kim, Soung-Hie;Lee, Jin-Woo
    • Journal of the military operations research society of Korea
    • /
    • v.26 no.1
    • /
    • pp.100-114
    • /
    • 2000
  • This paper demonstrates the application of a Quality Function Deployment (QFD) and Zero-One Goal Programming model for selecting interdependent information system project selection, there are a few research for interdependent IS project selection. Effective project evaluation necessities incorporating the many conflicting objectives of decision maker(s) into decision models. Among the many proposed methodologies of multi-criteria decision making (MCDM), Goal Programming (GP) is the most popular and widely used. The model departs from an earlier GP formulation of the problem that suggested QFD method for selection of priorities among the considered attributes or criteria. The application of the proposed methodology illustrated through an example.

  • PDF

An Evaluation of Priority for the Green Energy Technologies Business (그린에너지기술 사업화를 위한 우선순위 평가)

  • Lee, Deokki;Hong, Jong-Chul;Park, Soo-Uk;Baik, Keum Hee
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.135.2-135.2
    • /
    • 2011
  • The goal of this study is the derivation of priority for business in the areas of green energy technologies. In this paper, we calculated the importance weights of impact factors using the AHP (Analytic Hierarchy Process) method in order to derivation of priority to the green energy technologies business. AHP is a useful method for evaluating multi-criteria decision making problems. To apply the AHP method, specialists for the assessment have been identified by using the concept of 'plan, do, see' and the decision-making hierarchy was established. We selected 5 criteria and 16 sub-criteria for impact factors by brainstorming. According to the result in this study, the most important impact factor is the possibility of commercialization, the second is the possibility of developing the fundamental technology, and the third is the possibility of convergence technology.

  • PDF

On a Risk Assessment Methodology based on the Technology Readiness Levels, Degrees of Difficulty, and Technology Need Values in the Development of Naval Surface Ships (수상함 개발에서 기술성숙도, 난이도 및 중요도 기반의 위험도 평가 방안)

  • Kim, Kyong-Hwan;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.151-158
    • /
    • 2012
  • The objective of this paper is to propose a method of how to perform risk assessment in the early stage of defense research and development for the acquisition of weapon systems. An advanced method for risk assessment and its associated objective functions are developed first based on the concept of systems engineering. The developed method is then applied to carry out the analysis of alternatives in the trade-off environments. As a case study, the multi-purpose training ship is considered, where it is performed using the notions of technology readiness levels, degrees of difficulty, and technology need values to facilitate design space visualization and decision maker interaction. It is noted that decision makers can benefit from our approach as an improved risk assessment method in the context of multi-criteria decision making.

An Application of the Analytical Hierarchy Process (AHP) for Safety measurement in Malaysian Construction Industry

  • Samad Doostdar;Zubaidah Ismail
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.66-73
    • /
    • 2013
  • Analytical Hierarchy Process (AHP) is a famous method amongst Multi Criteria Decision Making (MCDM), set up by Saaty in 1980. AHP can be determined as a methodology of hierarchical analysis following reasonable decision making with make simpler a difficult crisis. Decision making in systems of Safety management concerned multipart challenges. AHP is process for get better the composite decisions understanding with analyzes of the problem in a structure of hierarchy. The integration all of applicable decision criteria, their pair wise judgment permits the decision maker to establish the trade-offs amongst objectives. In recent years, Malaysian's economy and infrastructure development have significantly and rapidly risen. The construction industry continues to play a major role in this development as many construction activities have been carried out to meet the high demands of the expansive market. However, the construction industry has faced a wide range of challenges, one of which is the frequent occurrences of accidents at the workplace. An effective safety program can substantially reduce accidents because it can help management to build up safer means of operations and create safe working environments for the workers. Furthermore, by having an effective safety programs, good safety culture can be embedded in organization because it can encourage mutual cooperation between management and workers in the operations of the programs and decisions that affect their safety and health. The focus of this research is development methodology of Analytics Hierarchy Process (AHP) in construction safety factors and investigates the levels of some effective elements in SMS in Malaysian construction industries.

  • PDF