• Title/Summary/Keyword: Modular Method

Search Result 628, Processing Time 0.028 seconds

Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System (인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

An investigation into structural behaviour of modular steel scaffolds

  • Yu, W.K.
    • Steel and Composite Structures
    • /
    • v.4 no.3
    • /
    • pp.211-226
    • /
    • 2004
  • This paper presents a study on the structural behaviour of modular steel scaffolds through both experimental and numerical investigations. Three one-storey and three two-storey modular steel scaffolds were built and tested to failure in order to examine the structural behaviour of typical modular steel scaffolds. Details of the tests and their test results were presented in this paper. Moreover, an advanced non-linear analysis method was employed to evaluate the load carrying capacities of these scaffolds under different support conditions. Comparisons between the experimental and the numerical results on the structural behaviour of these modular steel scaffolds were also presented. Moreover, the restraining effects of external supports in practical situations were also studied through finite element methods. The predicted load carrying capacities and deformations at failure of these models under partially restrained conditions were found to be close to the experimental results. A codified design method for column buckling with modified slenderness ratios was adopted for practical design of modular steel scaffolds.

An Economic Feasibility Analysis on the Movable Modular Lodging Buildings (이동 가능한 숙박용 모듈러 건축의 경제성 비교 분석에 관한 연구)

  • Lee, Jeehee;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.12-20
    • /
    • 2015
  • Construction industry pays attention to modular construction recently which based on factory production not on labor intensive site production. Since modular construction has high time shortening effect and easiness of demolition and recycling, it has been applied to the temporary residential building. Domestic modular construction market are not activated yet, however, due to the high initial cost to realize modular construction. This study proposes demand-sensitized movable modular building in order to reduce the financial burden. The study compares between RC method building and Modular building which moves building when the demand falls off from Life-Cycle Cost's viewpoint. As a result of the economical evaluation, RC method achieved profits faster than Modular model, but Modular model's gross earnings during the life-cycle are much bigger than RC method. In other words, the result means that the market-sensitized movement of the modular building would be an economci choice in Life-Cycle Costing aspect.

A Study on the Generation of Modular BOM and Efficient Database Construction using Value Clustering Method (Value Clustering Method를 이용한 Modular BOM의 생성과 데이터베이스의 효율적인 구축에 관한 연구)

  • Ji, Young-Gu;Kim, Jong-Han;Shin, Ki-Tae;Park, Jin-Woo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.24 no.2
    • /
    • pp.311-322
    • /
    • 1998
  • Modular BOMs are typically used in TWO-Level Master Production Schedule. To solve the problems of Modular BOM generation and efficient DB construction, we proposed Value Clustering Method. Based upon Where-Used matrix of products and components, VCM is the method to find out module by generating product family group value, product value, and component value. We also proposed method to find out information about Modules, algorithms to find out Modules that show Alternative Usage Pattern, and method to find out Modules used in a given product. We also compared the DB creation method by Value Clustering Method and by conventional method. We compared the size of DB in both methods. We mathematically proved that the proposed method is doing better as the size and complexity of product family gets larger and more complicated.

  • PDF

Safety Evaluation of 40m Combined Modular Bridge Super-Structures Based on Transportation Lifting Methods (40m 조합모듈교량 상부구조 이송에 따른 안전성 검토)

  • Park, Sung-Min;Jung, Woo-Young
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.2
    • /
    • pp.77-84
    • /
    • 2015
  • The purpose of this study was the analytical safety evaluation on the super-structure of precast modular bridge using standardized modular members and robotic construction during the transportation routing and lifting conditions. In order to evaluate the safety performance of the bridge system, 3-D full scale Finite Element (FE) of 40 m standardized modular block was developed in ABAQUS, followed by the analytical study to classify the structural system according to steel girder structures: 1) modular bridge block lifting method including the steel girder system; 2) modular bridge block lifting method without the steel girder system. The results from the analytical study revealed that the maximum stress of each modular member was within the maximum allowable stresses during lifting condition. However, the stress concentration at the connected area was more critical in comparison to the behavior of 40 m combined modular blocks during lifting time

Shear Behaviour of Precast Concrete Modular Beam Using Connecting Plate (연결 플레이트를 사용한 프리캐스트 콘크리트 모듈러 보의 전단성능)

  • Cho, Chang Geun;Ro, Kyong Min;Lee, Young Hak
    • Journal of Korean Association for Spatial Structures
    • /
    • v.21 no.4
    • /
    • pp.65-72
    • /
    • 2021
  • The Precast concrete(PC) modular structures are a method of assembling pre-fabricated unit modules in the construction site. The essential aim of modular structures is to introduce a connection method that can ensure splicing performance and effectively resist shear strength. This study proposed PC module using a connecting plate that can replace splice sleeves and shear keys used in the conventional PC modular structures. To evaluate the splicing performance and shear capacity of the proposed method, the shear test was conducted by fabricating one monolithic reinforced concrete(RC) beam and two PC modular beams with a shear span-to-depth ratio as variables. The experimental results showed that the shear capacity of the PC modular beam was about 89% compared to that of the RC beam, and showed a failure of the RC beam according to the shear span-to-depth ratio. Therefore, it was considered that the connecting plate effectively transferred the stress between each PC module through the joint and ensure integrity. In addition, the applicability of shear strength equation of ACI 318-19 and Zsutty's equation to PC modular beams were evaluated. Results demonstrated that the improved shear strength equations are needed to consider reduction of shear strength in PC modules.

Decision Model of Construction Errors Management Based on Modular Method Construction Process (모듈러 공법의 시공 프로세스 기반 시공 오차 관리 의사 결정 모델)

  • Shin, HyunKyu;Kim, SuYoung;Ahn, YongHan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.98-108
    • /
    • 2017
  • Recently, the development of middle and high-rise building technology using modular construction method has emphasized the importance of site construction error management. The modular construction method is very limited to adjust the construction error in the field because of the factory production characteristics. Therefore, in order to prevent the construction error in advance, a management plan reflecting the characteristics of the modular construction method is required, and it is important to make the decision of the construction participant at each stage. This study analyzed the factor of construction error of modular construction and suggested a decision support model for construction error management based on construction process. The result of this study is expected to be a guideline for the modular construction participant to derive the construction error management plan.

The alternative Method to Finish Modular Exponentiation and Point Multiplication Processes

  • Somsuk, Kritsanapong
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.15 no.7
    • /
    • pp.2610-2630
    • /
    • 2021
  • The aim of this paper is to propose the alternative algorithm to finish the process in public key cryptography. In general, the proposed method can be selected to finish both of modular exponentiation and point multiplication. Although this method is not the best method in all cases, it may be the most efficient method when the condition responds well to this approach. Assuming that the binary system of the exponent or the multiplier is considered and it is divided into groups, the binary system is in excellent condition when the number of groups is small. Each group is generated from a number of 0 that is adjacent to each other. The main idea behind the proposed method is to convert the exponent or the multiplier as the subtraction between two integers. For these integers, it is impossible that the bit which is equal to 1 will be assigned in the same position. The experiment is split into two sections. The first section is an experiment to examine the modular exponentiation. The results demonstrate that the cost of completing the modular multiplication is decreased if the number of groups is very small. In tables 7 - 9, four modular multiplications are required when there is one group, although number of bits which are equal to 0 in each table is different. The second component is the experiment to examine the point multiplication process in Elliptic Curves Cryptography. The findings demonstrate that if the number of groups is small, the costs to compute point additions are low. In tables 10 - 12, assigning one group is appeared, number of point addition is one when the multiplier of a point is an even number. However, three-point additions are required when the multiplier is an odd number. As a result, the proposed method is an alternative way that should be used when the number of groups is minimal in order to save the costs.

Implementation of 2,048-bit RSA Based on RNS(Residue Number Systems) (RNS(Residue Number Systems) 기반의 2,048 비트 RSA 설계)

  • 권택원;최준림
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.41 no.4
    • /
    • pp.57-66
    • /
    • 2004
  • This paper proposes the design of a 2,048-bit RSA based on RNS(residue number systems) Montgomery modular multiplier As the systems that RNS processes a fast parallel modular multiplication for a large word partitioned into small words, we introduce Montgomery reduction method(MRM)[1]based on Wallace tree modular multiplier and 33 RNS bases with 64-bit size for RNS Montgomery modular multiplication in this paper. Also, for fast RNS modular multiplication, a modified method based on Chinese remainder theorem(CRT)[2] is presented. We have verified 2,048-bit RSA based on RNS using Samsung 0.35${\mu}{\textrm}{m}$ technology and the 2,048-bit RSA is performed in 2.54㎳ at 100MHz.

Numerical Analysis for Motion Response of Modular Floating Island in Waves

  • Hyo-Jin Park;Jeong-Seok Kim;Bo Woo Nam
    • Journal of Ocean Engineering and Technology
    • /
    • v.37 no.1
    • /
    • pp.8-19
    • /
    • 2023
  • In recent years, modular-type floating islands have been considered as a promising option for future ocean space utilization. A modular floating island consists of a number of standardized pontoon-type modules and connectors between them. In this study, the motion responses of a modular floating island in waves was investigated based on frequency-domain numerical analysis. The numerical method is based on the potential flow theory and adopts a higher-order boundary element method with Green's function. First, motion RAOs were directly compared with the model test data by reference to validate the present numerical method. Then, numerical investigations were conducted to analyze the motion characteristics of the floating island by considering various modules shapes and arrangements. It was found that motion responses were reduced in a single central module compared to when divided central modules were used. Finally, the effect of modular arrangement on the motion responses in irregular waves was discussed. It was confirmed that multiple-layer outer modules are more effective in calming the central module than using single-layer outer modules, except under very long period conditions.