• Title/Summary/Keyword: Model Of Building Information Management

Search Result 684, Processing Time 0.026 seconds

A Study on the ITIL Management Model Based on the IT Governance for Public Sector (공공부분을 위한 IT 거버넌스 기반의 ITIL 관리 모델에 관한 연구)

  • Kim, Sang-Gil;Kim, Jin-Young;Park, Yeung-Gyu
    • Journal of Korea Multimedia Society
    • /
    • v.17 no.4
    • /
    • pp.490-505
    • /
    • 2014
  • IT governance in order to achieve the strategic goals of the organization, leadership, organizational structure, and the process is defined. In order to achieve IT governance, organizational structure, leadership for spindle formation, maintenance, and standardized processes to specific and an effective ITIL (Information Technology Infrastructure Library) management model is needed. In this study, the K Authority Management Model of IT Governance ITIL - based research on service delivery and customer satisfaction through the effective information for ITSM (Information Technology Service Management, IT Service Management) building measures, information for business planning and performance management PMS (Project Management System, project Management System), survey on ICT service levels established through the process of planning and construction management models such as ITIL future research on the public portion of the proceeds from the ITIL management model can be utilized as a guideline when establishing a theoretical presents a base.

The Interactive Modeling Method of Virtual City Scene Based on Building Codes

  • Ding, Wei-long;Zhu, Xiao-jie;Xu, Bin;Xu, Yan;Chen, Kai;Wan, Zang-xin
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.15 no.1
    • /
    • pp.74-89
    • /
    • 2021
  • For higher-level requirements of urban planning and management and the recent development of "digital earth" and "digital city", it is urgent to establish protocols for the construction of three-dimensional digital city models. However, some problems still exist in the digital technology of the three-dimensional city model, such as insufficient precision of the three-dimensional model, not optimizing the scene and not considering the constraints of building codes. In view of those points, a method to interactively simulate a virtual city scene based on building codes is proposed in this paper. Firstly, some constraint functions are set up to restrict the models to adhere to the building codes, and an improved directional bounding box technique is utilized to solve the problem that geometric objects may intersect in a virtual city scene. The three-dimensional model invocation strategy is designed to convert two-dimensional layouts to a three-dimensional urban scene. A Leap Motion hardware device is used to interactively place the 3D models in a virtual scene. Finally, the design and construction of the three-dimensional scene are completed by using Unity3D. The experiment shows that this method can simulate urban virtual scenes that strictly adhere to building codes in a virtual scene of the city environment, but also provide information and decision-making functions for urban planning and management.

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

A Study on Prototype of Just In Time Production Management System (적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 -)

  • Lee, Kyoo-Hyun;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item

VIRTUAL CONSTRUCTION OF TRANSFER FLOORS IN REINFORCED CONCRETE BUILDING USING BIM

  • Kwangho So;Bohwan Oh;Yongjik Lee;Hyungeun Lee;Taehun Ha
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.12-16
    • /
    • 2011
  • Building Information Modeling (BIM) is being widely spread in AEC industry worldwide and also in South Korea. Although the creation of digital model is better to be started at design stage, it can also improve the productivity of construction by simulating the actual construction process and environment. This paper presents application of BIM-based simulations related with design changes to transfer floors in 58-storey reinforced concrete office building. Transfer floor is not only a structurally important part of the building but also a challenging part of the actual construction in terms of sequence and period due to the complexity of the work. Preconstruction of rebar, mechanical, and plumbing is performed to review the construction drawings and to perform clash detection. Each item of application is evaluated for its effectiveness on actual construction and for the development potential.

  • PDF

SUSTAINABLE AND ENVIRONMENTALLY RESPONSIBLE DESIGN USING BIM: A CASE STUDY OF A RESIDENTIAL PROJECT

  • Hyunjoo Kim;Kwok K. Tam
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.84-87
    • /
    • 2011
  • This paper describes the application of the three sustainable design elements for a residential project in the county of Los Angeles, USA. The first design element is the green building design in which a base model will be created using the Autodesk REVIT MEP program for the analysis by Building Information Modeling (BIM) for the energy analysis modeling process to determine the energy savings for each of the recommended design features. The second element is the Low Impact Development design for the site design using specialty material and structural devices for infiltration and recycling of storm water for reuse. The third element is the application of drought tolerant plant species in the site's landscaping design as a means to conserve water. The construction cost associated with the application of these three elements will be reviewed to determine the practicality and effectiveness of this sustainable design approach.

  • PDF

Design Object Model for Implementation of Integrated Structural Design System for Building Structures (건물 구조 통합 구조설계 시스템의 구현을 위한 설계 객체 모델)

  • 천진호;박연수;이병해
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.13 no.1
    • /
    • pp.115-127
    • /
    • 2000
  • The purpose of this study is to propose the Design Object Model for implementation of an integrated structural design system for building structures. This study outlines the step-by-step development methodologies of the Design Object Model, which covers classification and modeling of the building design information. The Design Object Model has been efficiently developed through the proposed development methodologies. As a result, the Design Object Model has been proved to be efficient in design information management by representing the information from planning perspective, in recognition of structural member in space by the topology design object, and in representation of analysis s design information.

  • PDF

Visualization of Tunneling Using a BIM-based 3D Tunnel Model (BIM 기반 3D 터널 모델 가시화에 관한 연구)

  • Yoo, Wan-Kyu;Kim, Jinhwan;Zheng, Xiumei;Kim, Jeong-Heum;Gi, Sang-bok;Kim, Chang-Yong
    • The Journal of Engineering Geology
    • /
    • v.25 no.3
    • /
    • pp.395-401
    • /
    • 2015
  • An investigation of the tunnel face, as well as related measurement data collected during tunneling, is necessary for rock classification and to determine tunnel stability and the cost efficiency of tunneling. However, systematic management and efficient use of such data have yet to be successfully implemented domestically, and the number of experts in this field in Korea is limited. Thus, measures to develop and implement systematic management and effective use of data and expertise are urgently needed. This study aimed to develop measures to efficiently provide online tunnel design and construction data using a building information model (BIM)-based data visualization approach, based on an integrated 3D tunnel model generation module and a web viewer module. The development technology was verified through ○○ tunnel design and construction. Directions for future study and system improvement are proposed.

A study on the Information for the Schedule Management of the Construction based BIM (BIM기반 건설공사 일정관리를 위한 정보에 관한 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of Digital Contents Society
    • /
    • v.16 no.4
    • /
    • pp.555-564
    • /
    • 2015
  • Since the size of the construction project has become massive, complicated and specialized, the use for a substantial amount of information provided from diverse participants is considered important. Schedule information obtained from a variety of sources is key during the construction project. Misunderstanding of schedule management information causes delay of construction period and low quality of construction. Currently, interest in BIM (Building Information Modeling) that produces the necessary data for the entire life cycle of the building process is rising. The study is to construct the BIM-base-information system in order to systematically manage schedule information of the construction work. For this purpose, the study established a BIM-base-schedule-management-business process and drew a classification system for the work for schedule-information construction. The study also drew information that can be extracted from the BIM model among properties required to build certain information. The schedule is made upon consideration of information needed for schedule management, and information required to schedule a timeline of the construction project by process is established.

A HAZARDOUS AREA IDENTIFICATION MODEL USING AUTOMATED DATA COLLECTION (ADC) BASED ON BUILDING INFORMATION MODELLING (BIM)

  • Hyunsoo Kim;Hyun-Soo Lee;Moonseo Park;Sungjoo Hwang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.17-22
    • /
    • 2011
  • A considerable number of construction disasters occur on pathways. Safety management is usually performed on construction sites to prevent accidents in activity areas. This means that the safety management level of hazards on pathways is relatively minimized. Many researchers have noted that hazard identification is fundamental to safety management. Thus, algorithms for helping safety managers to identify hazardous areas are developed using automated data collection technology. These algorithms primarily search for potential hazardous areas by comparing workers' location logs based on a real-time location system and optimal routes based on BIM. Potential hazardous areas are filtered by identified hazardous areas and activity areas. After that, safety managers are provided with information about potential hazardous areas and can establish proper safety countermeasures. This can help to improve safety on construction sites.

  • PDF