• Title/Summary/Keyword: Model Of Building Information Management

Search Result 693, Processing Time 0.029 seconds

Development of a 4D Information based Integrated Management System for Geothermal Power Plant Drilling Project (지열발전 시추프로젝트의 4D 정보화기반 통합관리 시스템 개발)

  • Lee, Seung Soo;Kim, Kwang Yeom;Shin, Hyu-Soung
    • Tunnel and Underground Space
    • /
    • v.24 no.3
    • /
    • pp.234-242
    • /
    • 2014
  • Deep drilling project should be managed systematically and efficiently because it is significantly influenced by various related factors having uncertainty and high risk in terms of economy and effective management. In particular, drilling project involves participants from various sectors including necessary service company and it also needs their collaboration by sharing related information occurring at drilling process in order to secure efficient performance management. We developed 4D (3D + time) information based visualization system for progress management by combining 3D design model and predicted optimized control parameters for each section in geothermal well design. We also applied PDM (precedence diagramming method) to the system in order to setup the effective process model and hooked it up to 3D information based on precedence relation and required time for informatized process network.

A Design and Implementation of Data Registry for sharing data elements of Intelligent Building Systems (지능형 빌딩 시스템의 데이터 요소 공유를 위한 데이터 레지스트리의 설계와 구현)

  • Kim, Chang-Yong;Kim, Sheung-Kown
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.562-565
    • /
    • 2000
  • A data registry is a physical place to keep characteristics of classes of objects exist in the real world when they are chosen to record as data. It provides a centralized directory to describe the meaning, representation, and identification of data elements and their values. It assists to prevent redundancy and to preserve common understanding about the data described in a metadata set. In this paper, we investigate and classify various components of IBS(Intelligent Building Systems), specially HVAC in Building Automation Systems. We present IBSDR(Intelligent Building Systems Data Registry) model that specifies not only the detailed information on data elements but also the process of documenting data in IBS. It functions as the medium to create the data sharing environment to maintain exact meaning of data for every data elements so that database management designers or related users can create and exchange their DB without major modification. It also serves as a clearinghouse for information about IBS data. So all users can freely retrieve from and register data elements to IBSDR based on ISO/IEC 11179 through World Wide Web.

  • PDF

Applying BIM and GIS to Railway Maintenance Works in Taiwan

  • Liu, Li-Shih;Shr, Jin-Fang
    • International Journal of Aerospace System Engineering
    • /
    • v.2 no.1
    • /
    • pp.18-23
    • /
    • 2015
  • Based on real jobs, this study was carried out the Railway maintenance works in Taiwan. It hopes to use Geographic Information System(GIS) and Building Information Modeling(BIM) for changing the maintenance model from "post-damage repair" to "preventive maintenance". Accordingly, this research will build a Railway Repairing Database that installs all repair data. This database will also connect to GIS so that can be the source of analysis and statistic for repair paln. The main results of research are as follows: I. All data stored on cloud space that raises the ability to manage and plan on repair. II. Simplify the file work and increase the quantity of case data to the manager who can get more reliable source. III. The data offer objective judgment to avoid subjective argument. IV. Add the GIS information to improve the maintenance because of good analisis.

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

Design of Information Model for an Integrated Management System of Civil Projects (토목 프로젝트 통합 관리 시스템 구축을 위한 정보 모델 설계)

  • Jeong, Seon-Hwa;Kang, Hyoung-Seok;Noh, Sang-Do;Lee, Chang-Woo;Lee, Kwang-Myong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.365-368
    • /
    • 2010
  • 건설 프로젝트 단계별로 생산되는 다양하고 방대한 정보에 대한 효율적인 관리와 정보의 상호 교환 및 공유는 건설 산업의 생산성을 좌우하는 중요한 요소이다. 최근 건설 정보 통합에 대한 관심이 높아짐에 따라, 기획, 설계, 시공, 유지보수 등의 프로세스 및 엔지니어링 어플리케이션 간의 정보 통합에 대한 연구가 수행되고 있다. 하지만 BIM(Building Information Model)과 같은 정보 모델을 활용하여 정보를 통합 관리하는 것에 대한 연구는 상대적으로 건축 분야에 집중적으로 이루어지고 있다. 따라서 토목 분야에서 프로젝트 정보의 통합적인 관리와 업무 프로세스 별 엔지니어링 어플리케이션 간의 교환 및 공유를 위한 통합관리 시스템이 필요하다. 본 연구에서는 토목 프로젝트 통합 관리 시스템 구축을 위하여 토목 프로젝트 정보를 담을 수 있는 정보 모델을 설계하고, 토목 구조물 가운데 교량을 대상으로 하는 토목 프로젝트를 정보 모델에 적용해 보았다.

  • PDF

Space Management on Campus of a Mobile BIM-based Augmented Reality System

  • Ji, Seung-Yeul;Kim, Mi-Kyoung;Jun, Han-Jong
    • Architectural research
    • /
    • v.19 no.1
    • /
    • pp.1-6
    • /
    • 2017
  • Over the past decade, building information modeling (BIM) has gained a foothold in the construction sector. However, as digital data generated in the virtual space of a computer environment, BIM-based data have an inherent limitation in their application efficacy under field conditions. To overcome this, the present study employs augmented reality (AR) to reduce the discrepancy between the digital data generated in virtual spaces and real-world conditions. We assessed the potential applicability of an AR-based interface by analyzing existing examples of Apple, Google, and Facebook, which reflect the recent developments of technologies focusing on user experience. We then proceeded with an AR study, restricting the scope of application to a mobile environment in which an efficient information transmission between a digital model and real life can take place. Object-oriented software engineering was employed to ensure an efficient implementation of a BIM-based AR system for campus space management (CSM) in a mobile environment. Finally, we conducted a module test to check the reliability of the CSM method by using an AR-based mobile system with a prototype of the model used in university campuses, and extracted and itemized the supplementary requirements for CSM by using BIM tools for running AR applications.

Comparison of 3D Reconstruction Methods to Create 3D Indoor Models with Different LODs

  • Hong, Sungchul;Choi, Hyunsang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.674-675
    • /
    • 2015
  • A 3D indoor model becomes an indiscernible component of BIM (Building Information Modeling) and GIS (Geographic Information System). However, a huge amount of time and human resources are inevitable for collecting spatial measurements and creating such a 3D indoor model. Also, a varied forms of 3D indoor models exist depending on their purpose of use. Thus, in this study, three different 3D indoor models are defined as 1) omnidirectional images, 2) a 3D realistic model, and 3) 3D indoor as-built model. A series of reconstruction methods is then introduced to construct each type of 3D indoor models: they are an omnidirectional image acquisition method, a hybrid surveying method, and a terrestrial LiDAR-based method. The reconstruction methods are applied to a large and complex atrium, and their 3D modeling results are compared and analyzed.

  • PDF

A Study on the Source Module Implementation using Smalltalk (Smalltalk를 이용한 원시 모듈 구현에 관한 연구)

  • O, Sang-Yeop;Kim, Hong-Jin;Jang, Deok-Cheol
    • Asia pacific journal of information systems
    • /
    • v.2 no.1
    • /
    • pp.77-92
    • /
    • 1992
  • We presents a source module implementation system using building blocks as one of the software reusing approach. Based on module text retrieval system, system is composed of library management program and new module making program for module management. We build a software module by virtue of the reuser's customization and by applying a practical module to this model and then proved that program development through reusing approach is better than that of writing out a source code directly.

  • PDF

A Method for Information Management of Defects in Bridge Superstructure Using BIM-COBie (BIM-COBie를 활용한 교량 상부구조의 손상정보 관리 방법)

  • Lee, Sangho;Lee, Jung-Bin;Tak, Ho-Kyun;Lee, Sang-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.165-173
    • /
    • 2023
  • The data management and the evaluation of defects in the bridge are generally conducted based on inspection and diagnosis data, including the exterior damage map and defect quantity table prepared by periodic inspection. Since most of these data are written in 2D-based documents and are difficult to digitize in a standardized manner, it is challenging to utilize them beyond the defined functionality. This study proposed methods to efficiently build a BIM (Building Information Modeling)-based bridge damage model from raw data of inspection report and to manage and utilize the damage information linking to bridge model through the spread sheet data generated by COBie (Construction Operations Building Information Exchange). In addition, a method to conduct the condition assessment of defects in bridge was proposed based on an automatic evaluation process using digitized bridge member and damage information. The proposed methods were tested using superstructure of PSC-I girder concrete bridge, and the efficiency and effectiveness of the methods were verified.

Development of BIM-based CPLM System for Civil Project Management (토목 프로젝트 관리를 위한 BIM 기반 CPLM 시스템 개발)

  • Lee, Kwang-Myong;Lee, Chang-Woo;Han, Song-Yi;Kang, Hyoung-Seok;Noh, Sang-Do
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.24-29
    • /
    • 2011
  • BIM technology, based on 3D model of civil engineering structures, creates and manages information of the structures throughout four stages: Planning, design, construction, and maintenance. BIM is now used around the globe for improvement of the construction productivity. However, in order to expect the efficient engineering work, collaboration system between participants in a construction project is necessary. Therefore, in this paper BIM based CPLM (Construction project lifecycle management) system was designed and developed by analyzing the requirements of participants of a construction project. CPLM system offers an environment which enables the sharing and management of information according to the each stage of construction. CPLM is expected to aid cooperative decision-making during the overall construction process through the process innovation and the efficient data management.