• Title/Summary/Keyword: Minimal Maintenance

Search Result 140, Processing Time 0.03 seconds

Optimal Replacement Policy for a Repairable System with Combination Warranty (혼합보증이 있는 수리 가능한 시스템에 대한 최적의 교체정책)

  • 정기문
    • The Korean Journal of Applied Statistics
    • /
    • v.15 no.1
    • /
    • pp.107-117
    • /
    • 2002
  • In this paper we present the optimal replacement policies following the expiration of combination warranty. We consider two types of combination warranty policies: renewing warranty and non-renewing warranty. The criterion used to determine the optimal replacement period is the expected cost rate per unit time from the user'perspective. The optimal maintenance period following the expiration of combination warranty is obtained. Some numerical examples are presented for illustrative purpose.

Periodic PM Policy for Repairable System with RCW or NCW

  • Jung, Gi-Mum;Kim, Dae-Kyung;Park, Dong-Ho
    • International Journal of Reliability and Applications
    • /
    • v.3 no.3
    • /
    • pp.113-124
    • /
    • 2002
  • This paper suggests the optimal periodic preventive maintenance policies after the combination warranty is expired. After the combination warranty is expired, a repairable system undergoes PM periodically and is minimally repaired at each failure. And also the system is replaced by a new system at the N th PM. In this case, we derive the mathematical formula for the expected cost rate per unit time. The optimal number and period for the periodic PM that minimize the expected cost rate per unit time are obtained. Some numerical examples are presented for illustrate purpose.

  • PDF

Bayesian Method for Sequential Preventive Maintenance Policy

  • Kim Hee Soo;Kwon Young Sub;Park Dong Ho
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.131-137
    • /
    • 2005
  • In this paper, we propose a Bayesian approach to determine the adaptive preventive maintenance(PM) policy for a general sequential imperfect PM model proposed by Lin, Zuo and Yam(2000) that PM not only reduces the effective age of the system but also changes the hazard rate function. Assuming that the failure times follow Weibull distribution, we adopt a Bayesian approach to update unknown parameters and determine the Bayesian optimal sequential PM policies. Finally, numerical examples of the optimal adaptive PM policy are presented for illustrative purposes.

  • PDF

A Systemetic Analysis of Gum Electro Automatic Overwrapping Machine Using FTA (FTA를 이용(利用)한 껌 자동포장기계(自動包裝機械) 고장(故障)의 체계적(體系的) 분석(分析))

  • Sin, Dong-Beom;Yun, Deok-Gyun
    • Journal of Korean Society for Quality Management
    • /
    • v.12 no.1
    • /
    • pp.45-58
    • /
    • 1984
  • This paper performs a systematic analysis for failures in gum electro automatic overwrapping machine, using FTA technique. Data for failures which occurred from January, 1978 to June, 1983 are collected from machinery maintenance department at L. Confectionery Co. Ltd. In order to analyse them, COBOL computer program is performed because of a lot of time and effort. The minimal cut sets of the system failures are obtained from computer program. Through a set of analyses, the critical basic failures are found out.

  • PDF

Traffic signal control system using fuzzy logic (Fuzzy logic을 利用한 交通 信號 control system)

  • 文珠永;李尙培
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 1996.10a
    • /
    • pp.180-183
    • /
    • 1996
  • This work discusses simulation results for the fuzzy logic controller tested the project“Fuzzy Ramp Metering Algorithm Implementation.”The performance objectives were, in order of priority, to maximize total vehicle-miles, maximize mainline speeds, and minimize delay per vehicle while maintaining an acceptable ramp queue. In the fuzzy logic controller, the sensors from the on-ramps were helpful in maintaining reasonable ramp queue and mainline congestion because it considered these factors simultaneously. Each metered ramp had a parameter input file, which allowed the controller to be modified without recompiling the software. Consequently, maintenance costs should be minimal.

  • PDF

Improvement Strategy of System Unavailability by Review of Logical Structure and Reliability Importance of Reliability Block Diagram (RED) and Fault Tree Analysis (FTA) (RBD와 FTA의 논리구조와 신뢰성 중요도의 고찰에 의한 시스템 비시간가동률 개선방안)

  • Choi, Sung-Woon
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.3
    • /
    • pp.45-53
    • /
    • 2011
  • The research proposes seven elimination rules of redundant gates and blocks in Fault Tree Analysis (FTA) and Reliability Block Diagram (RBD). The computational complexity of cut sets and path sets is NP-hard. In order to reduce the complexity of Minimal Cut Set (MCS) and Minimal Path Set (MPS), the paper classifies generation algorithms. Moreover, the study develops six implementation steps which reflect structural importance (SI) and reliability importance (RI) from Reliability Centered Maintenance (RCM) that a priority of using the functional logic among components is to reduce (improve) the system unavailability (or availability). The proposed steps include efficient generation of state structure function by Rare Event Enumeration (REA). Effective use of importance measures, such as SI and ill measures, is presented based on the number and the size of MCS and MPS which is generated from the reference[5] of this paper. In addition, numerical examples are presented for practitioners to obtain the comprehensive understanding of six steps that is proposed in this research.

Nipple Reconstruction with Rolled Dermal Graft Support

  • Chia, Hui-Ling;Wong, Manzhi;Tan, Bien-Keem
    • Archives of Plastic Surgery
    • /
    • v.41 no.2
    • /
    • pp.158-162
    • /
    • 2014
  • Background Loss of nipple projection is a common problem following nipple reconstruction. The aim of this study was to demonstrate that the use of a tightly rolled dermal graft is effective in the long-term maintenance of nipple projection. Methods Nipple reconstruction was performed using the C-V flap technique. A dermal graft was harvested from the dog-ear portion of previous scars. The graft was rolled tightly into a compact cylinder and used to augment the nipple reconstruction. Postoperatively, stacked Allevyn dressing was used for protecting the nipple from compression for a minimum of two months. Nipple projection was measured at the time of surgery and at 12 months postoperatively. Results Forty nipple reconstructions were performed using this technique. There were 19 transverse rectus abdominis musculocutaneous (TRAM) flaps, 10 latissimus dorsi (LD) flaps, and 11 tissue-expanded breast mounds. At one year, the mean projection was 0.80 cm (range, 0.62-1.22 cm). The twelve-month average maintenance of nipple projection was 70.2% for the TRAM flap group, 76.3% for the LD flap group, and 61.8% for the tissue-expanded group. In two patients with previous irradiation of the reconstructed breasts, relatively poor maintenance of nipple projection was noted (45.7%). No complications were noted, and all of the donor sites healed well primarily. Conclusions Our results demonstrated that the use of a C-V flap with a tightly rolled dermal graft for nipple reconstruction improves the long-term maintenance of nipple projection. Its advantages include reproducibility, technical simplicity, cost-effectiveness, and minimal donor site morbidity.

Replacement Model Following the Expiration of NFRRW (비 재생무료교체-수리보증이 종료된 이후의 교체모형)

  • Jung, Ki-Mun
    • The Korean Journal of Applied Statistics
    • /
    • v.23 no.6
    • /
    • pp.1147-1156
    • /
    • 2010
  • This paper proposes a replacement policy following the expiration of a non-renewing free replacement-repair Warranty(NFFRW). The non-renewing free replacement-repair warranty is defined and then the maintenance model following the expiration of the NFRRW is studied from the user's point of view. As the criteria to determine the optimality of the maintenance policy, we consider the expected cost rate per unit time from the user's perspective. All maintenance costs of the system incurred after the expiration of the warranty are paid by the user. Given the cost structures during the life cycle of the system, we determine the optimal maintenance period following the expiration of a NFRRW. Finally, the numerical examples are presented for illustrative purposes.

Development of outage-free installation method and equipments for underground power distribution system (지중배전선로 무정전 공법의 최적화를 위한 장비 개발)

  • Yu, K.Y.;Joo, J.M.;Lee, Y.S.;Kim, Y.M.;Kang, N.K.
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.122-124
    • /
    • 2005
  • Underground distribution system is a trend due to the successive development of metropolitan area and satellite cities and the environment of the commercial and residential areas. The high quality of electricity, which is related with the minimal outage duration time due to the maintenance work for the underground distribution line, is mandatory. Hence, the construction method and tools for the outage-free maintenance construction have been required for underground distribution system. So far, all the efforts for outage-free maintenance for the underground distribution have been limited only to the survey for foreign countries situation and the theoretical provision; thus, It is required to develop the various construction method and the application tools. Differently from the aerial line, the construction of the underground cable is complicated and the insulation distance between conductor and shield should be maintained in loadmaking/breaking operation, though the apparatus connected with cable is a deadfront type. Also since the apparatus is installed above ground, by-pass of faulted area at busy area needs a variety of high technologies. Therefore, in this these, the authors introduce the development status of the loadbreak connectors, connection facilities, outage-free maintenance system for secondary side, a secondary auxiliary bushing and additional tools so that there can be more progress on this field.

  • PDF

Selection of Optimal Model for Structural System Identification (SI기법 적용을 위한 최적 모델의 선택)

  • Kwak, Hyun-Seok;Kwon, Soon-Jung;Lee, Hae-Sung;Shin, Soobong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.2
    • /
    • pp.217-224
    • /
    • 2005
  • A methodology of selecting an optimal model is proposed for applying a frequency-domain SI method effectively. Instead of using a reduced finite element model, a reasonably detail finite element model is established first and then the model is identified. To satisfy the identifiability criterion, a parameter grouping scheme is applied to control the number of unknowns. Among the simulated member grouping cases, an optimal model is selected as the one with the minimal statistical error. The proposed approach has been examined through simulation studies on a single span box-girder bridge.