• Title/Summary/Keyword: Mine Design Planning

Search Result 10, Processing Time 0.028 seconds

An Interactive Planning and Scheduling Framework for Optimising Pits-to-Crushers Operations

  • Liu, Shi Qiang;Kozan, Erhan
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.1
    • /
    • pp.94-102
    • /
    • 2012
  • In this paper, an interactive planning and scheduling framework are proposed for optimising operations from pits to crushers in ore mining industry. Series of theoretical and practical operations research techniques are investigated to improve the overall efficiency of mining systems due to the facts that mining managers need to tackle optimisation problems within different horizons and with different levels of detail. Under this framework, mine design planning, mine production sequencing and mine transportation scheduling models are integrated and interacted within a whole optimisation system. The proposed integrated framework could be used by mining industry for reducing equipment costs, improving the production efficiency and maximising the net present value.

Application of 3-Dimensional Modeling in Mine Feasibility Study and Production (광산개발 타당성 평가 및 생산에 있어서 3차원 모델링 적용 사례)

  • Choi, Yong-Kun;Heo, Seung;Park, Joon-Young;Kim, Jang-Ha;Lee, Sung-Am
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.89-100
    • /
    • 2009
  • 3-dimensional modeling methods have been used in the every step of resource development; Exploration, reserve estimation, mine feasibility study, mine design and mine production. This report shows seven cases for which 3-dimensional modeling is used in resource development. Six projects deal with resource esimation, mine feasibility study and production. And another deals with mine rehabilitation. These cases show that 3-dimensional modeling method is beneficial to understand the real state of ore deposit and complex underground structures. Moreover, 3-dimensional modeling is the most efficient method for mine planning and management in the every step of resource development.

  • PDF

Numerical Study on the Design of Vertical Shaft based on the Falling Mechanism of Ore Particles in Glory Hole Mining Method (글로리 홀 채광법에서 광체의 낙하메커니즘을 통한 수갱 안전설계 연구)

  • Choi, Sung-Oong;Kim, Jaedong
    • Journal of Industrial Technology
    • /
    • v.30 no.A
    • /
    • pp.17-23
    • /
    • 2010
  • Recently, a large number of open-pit mines are planning to change their mining method to underground types because the environmental concerns and legal regulations are increased with a rise in the standard of living. The K silica mine, which is one of them and located in Kyunggi province, is planning the establishment of a vertical shaft which will be used for ore-pass channel in their new glory hole mining method. This vertical shaft will be designed to join with a horizontal gangway excavated from the ground level. In this new mining system, the excavated ore particles will be stored inside a shaft and transported out with a help of a conveyor belt. Therefore the hang-up of ore particles in a shaft, the control of gate at the bottom of a shaft, the installation of dog-leg at the gate should be investigated identically. In this study, the PFC-2D code which is one of the discrete element numerical methods has been applied to simulate the particle flow mechanism in a shaft, and the optimum mine design has been proposed to maximize the productivity and to minimize the system damage.

  • PDF

Mine Haulage System Design for Reopening of Yangyang Iron Mine using 3D Modelling (3차원 모델링을 이용한 재개광 양양철광의 운반시스템 설계)

  • Son, Youngjin;Kim, Jaedong
    • Tunnel and Underground Space
    • /
    • v.22 no.6
    • /
    • pp.412-428
    • /
    • 2012
  • To achieve mine development, a large amount of data concerned with the geological structure and the ore body had to be investigated and collected through geological survey, drilling and geophysical explorations. In most previous cases, however, the data were usually analyzed two dimensionally and those results showed some limits because of their 2D presentation. Those 2D maps such as geological plane sections or longitudinal sections cause lots of difficulties in understanding the complex geological structure or the feature of ore body in a spatial way. In this study, research area was set on the abandoned Yangyang iron mine in Korea and the Sugaeng ore body within the mine was selected as the research target to design a mine haulage system for reopening. A 3D mine model of this area was tried to be constructed using a 3D modelling software, GEMS. An accurate 3D model including the ore body, the geological structure, the old underground mine drifts and the new mine drifts was constructed under the purpose of reopening of the abandoned iron mine. Especially, mine design for trackless haulage system was conducted. New inclines and drifts were planned and modelled 3 dimensionally considering the utilization of old drifts and shaft. In addition to the 3D modelling, geostatistical technique was adopted to generate a spatial distribution of the ore grade and the rock physical properties. 3D model would be able to contribute in solving problems such as evaluating ore reserves, planning the mine development and additional explorations and changing the development plans, etc.

A Study of Simulation Model for Effectiveness Analysis Simulation of Unmaned Underwater Vehicle for Mine Searching (기뢰 탐색 작전용 무인잠수정 효과도 분석 시뮬레이션을 위한 시뮬레이션 모델 연구)

  • Hwang, A-Rom;Kim, Moon-Hwan;Lee, Sim-Yong
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.15 no.4
    • /
    • pp.410-416
    • /
    • 2012
  • In recent years, unmanned underwater vehicles(UUVs) have emerged as viable technical solution for conducting underwater search, surveillance, and clearance operations in support of mine countermeasure missions(MCMs) because of her autonomy and long time endurance capability. It is necessary for UUV for MCM system design to define system specification from various configuration alternatives. This paper introduces a simulation model for mine countermeasure mission effectiveness analysis and presents some simulation results under various tide conditions for validation of the proposed simulation model.

Construction Planning and Design of a Long Tunnel (장대 터널의 계획과 설계)

  • 장석부;윤영훈;김용일;김진한
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.117-124
    • /
    • 2000
  • This paper presents the construction planning and the detail design of a 16.2 km long railroad tunnel in a mountainous area. Major design conditions for railroad are the single track, loop-typed alinement, and a maximum grade of 24.5$\textperthousand$. A underground station(double track) with a length of 1.1km is located in the middle of the line for train cross-passing. Tunnel is excavated in highly complex geological conditions including faulted areas, abandoned mine works areas, and various rock types such as sandstone, shale, limestone, and coal seam partly. Drilling and blasting method was adopted because it is more flexible than TBM(Tunnel Boring Machine) as a result of risk assessment for geological conditions in this area. Two working adits were planned to adjust the construction schedule and can be used for ventilation and maintenance in operation phase. New material and concept were introduced to the tunnel drain design. They are expected to improve tunnel drain condition and capability. Rational tunnel support design was tried to consider the various tunnel size and purpose and to use the geological investigation results.

  • PDF

A Pilot Experiments for Evaluation of Cover Soil Loss from Inclined Upland around Remediated Abandoned Mine Site - The Condition of Chemical Characteristics and Inclination - (광해복원 경사지 밭의 토양유실 평가를 위한 현장실험 - 화학적 성질과 경사도 조건에서 -)

  • Yun, Sung-Wook;Kang, Hui-Cheon;Kwon, Yo-Seb;Koh, Il-Ha;Jeong, Mun-Ho;Yu, Chan
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.64 no.2
    • /
    • pp.37-45
    • /
    • 2022
  • In-situ pilot experiment was carried out to establish a countermeasure on the soil loss from the hill side uplands that was rehabilitated by soil remediation method nearby abandoned mine sites for 2 years. It was considered that the affect of an inclination of cover surface, a stabilization treatment of cover layer by lime and steel refining slag (SRS) and a vegetation of soil surface as an effect factors in the experiment. It was constructed 4 lysimeters (plots, 22 m long, 4 m width) on the hilly side (37% inclination). One plot was control and two plots was treated by 1% lime and SRS. A remind one plot was modified a inclination to 27% to compare the affect of inclination on the amount of cover soil loss. It was attached a reservior tank and water level gauge in the end of lysimeters to measure the amount of the surface water flow and soil loss. It was also installed the automated sensors that could be collect the precipitation, soil moisture content, tension of cover layer in each plots. It was observed that the event of precipitation were caused the soil loss and it were related the physical and chemical properties of cover soil and inclination of surface layer of plots. During the experiment, it was exceeded the national regulation (50 t/ha/yr) in 37% inclination plots even though it was vegetated on the cover soil surface. However, in 27% inclination plot, it was shown that the amount of soil loss was maintained below the national regulation and, more ever, vegetation could reduce the the amount of soil loss. Therefore it was expected that such results could be applied to the future design of rehabilitation projects on the polluted farmland nearby abandoned mine sites.

Development of USLExls and its Application for the Analysis of the Impact of Soil-Filling Work on Soil Loss (USLExls를 이용한 복토법에 따른 필지 단위 토양유실량 분석)

  • Kim, Sorae;Yu, Chan;Lee, Sang-Whan;Ji, Won-Hyun;Jang, Min-Won
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.6
    • /
    • pp.109-125
    • /
    • 2017
  • This study aimed to develop a parcel-unit soil loss estimation tool embedded in Excel worksheet, USLExls, required for the design of contaminated farmland restoration project and to analyze the impact of the project carried out soil-filling work on soil loss. USLE method was adopted for the estimation of average annual soil loss in a parcel unit, and each erosivity factor in the USLE equation was defined through the review of previous studies. USLExls was implemented to allow an engineer to try out different combinations just by selecting one among the popular formulas by each factor at a combo box and to simply update parameters by using look-up tables. This study applied it to the estimation of soil loss before and after soil-filling work at Dong-a project area. The average annual soil loss after the project increased by about 2.4 times than before on average, and about 60 % of 291 parcels shifted to worse classes under the classification criteria proposed by Kwak (2005). Although average farmland steepness was lower thanks to land grading work, the soil loss increased because the inappropriate texture of the cover soil induced the soil erosion factor K to increase from 0.33 before to 0.78 after the soil-filling work. The results showed that the selection of cover soil for soil-filling work should be carefully considered in terms soil loss control and the estimation of change in soil loss should be mandatory in planning a contaminated farmland restoration project.

The Case Study on Application of 3 Dimensional Modeling Method with Geophysical Data (물리탐사 자료에 대한 3차원 지반 모델링 적용 사례 연구)

  • Heo, Seung;Park, Joon-Young;Do, Jung-Lok;Yoo, In-Kol
    • Geophysics and Geophysical Exploration
    • /
    • v.11 no.3
    • /
    • pp.221-229
    • /
    • 2008
  • The three dimensional model method is widely applied in resource development for feasibility study, mine design, excavation planning and process management by constructing the database of various data in 3 dimensional space. Most of geophysical surveys for the purpose of engineering and resource development are performed in 2 dimensional line survey due to the restriction of the field situation, technical or economical situation and so on. The acquired geophysical data are used as the input for the 2 dimensional inversion under the 2 dimensional assumption. But the geophysical data are affected by 3 dimensional space. Therefore in order to reduce the error caused by 2 dimensional assumption, the 2 dimensional inversion result must be interpreted considering the additional information such as 3 dimensional topography, geological structure, borehole survey etc. The applicability and usability of 3 dimensional modeling method are studied by reviewing the case study to the geophysical data acquired in field of engineering and resource development.