• Title/Summary/Keyword: Military Equipment

Search Result 432, Processing Time 0.027 seconds

Design and Implementation of the Automatic cable assembly test system that can test cable assembly effectively

  • Jang, Ki-Mang
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.7
    • /
    • pp.1-10
    • /
    • 2018
  • In this paper, we propose the principles and design details of Automatic cable assembly test system and show its utility. Testing the cable assembly is required periodically or non-periodically in the system that the cable assembly performance is quite important like military equipment. There are several weaknesses when humans test the cable assembly manually. It not only takes much time but also could happen human error. To improve these disadvantages, I developed Automatic cable assembly test system. The system can be implemented by building switching control system that connect and disconnect the cable assembly and measuring devices. Through the result of the cable assembly test with this test system, we show this system makes test time short and improves of test reliability as compared with manual test.

A Study on Designing of LYNX Datalink (해상작전헬기용 데이터링크 설계 연구)

  • Lee, Young-Joong;Park, Joo-Rae;Lyu, Si-Chan
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.9 no.4
    • /
    • pp.39-49
    • /
    • 2006
  • LYNX ESM has not only ESM function but Datalink function. The LYNX boarded equipment Interface and Channel coding is needed for LYNX Datalink to support the mother ship with tactical data included threat radar analysis data of LYNX ESM, navigation data, Radar and Sonar of LYNX. The interface of loaded equipments are various protocol like as ARINC419/429, RS232, Synchro, Sync Serial. The Channel coding of Convolution-Scrambler-Interleaver-Bit Stuffing is applied for recovering the transmission data mixed with propagation errors in sea environment.

A Development of Missile System Test Equipment for Ku-Band Radar Altimeter (Ku대역 전파고도계 체계점검장비 개발)

  • Kim, Taehoon;Jeong, Jinseob
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.18 no.6
    • /
    • pp.808-815
    • /
    • 2015
  • For performance improving of C-band radar altimeter used in a missile system, Ku-band radar altimeter is developed. To utilize the time delay devices which are used in testing C-band radar altimeter, we proposed C-band and Ku-band frequency conversion method and implemented it as a part of missile system test equipment. In this paper we present design contents, development results and test application results of radar altimeter test equipments.

Review of Shock Test Standards for Unifying Specification of Naval Equipments (함정탑재장비 규격통일화를 위한 충격시험기준 고찰)

  • Kim, Young-Ju;Kim, Joon-Won
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2005.11a
    • /
    • pp.214-215
    • /
    • 2005
  • Naval equipments are installed and used for naval vessel with different environmental conditions comparing to the commercial vessel, for example, high engine power per ship displacement size, severe vibration and shock due to high running speed and explosion from naval gun's bombardment and underwater weapons. Therefore, those equipments must be installed on shipboard with small spaces, high ambient temperature around engine room and which are required be fabricated with high resistances of vibration, shock and heat resources. But in case of commercial vessel, the performances of their recent equipments naval have been improved continuously due to the technology development of domestic shipbuilding and shipboard equipment industries, together with the related fundamental industries i.e, metal, steel and electronic industries, to an international level since 1970. With these results, it became possible to unify the specifications of shipboard equipments for the commercial and military vessels(Dual-Use). In this study, vibration and shock test standards for the commercial and military vessels will be compared and reviewed technically.

  • PDF

Simulated Radar Target Generation Equipment(SRTGE) for Evaluating Radar System Performance (레이더 시스템 성능평가용 가상 레이더 표적신호 발생장치)

  • Yang, Jin-Mo;Lee, Min-Joon;Kim, Whan-Woo
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.11 no.3
    • /
    • pp.40-49
    • /
    • 2008
  • In this paper, we have described a Simulated Radar Target Generation Equipment(SRTGE) for evaluating the performance of a developed radar system. In order to change a simulated target range(or time delay), the variable optical delay line structure is used in SRTGE, In addition, SRTGE is required to generate a target return signal which is composed of variable amplitude and Doppler velocity. The interference such as noise jamming and clutter is also produced from SRTGE for evaluating ECCM(Electronic-Counter-Counter Measure) capability of radar.

The Ground Surveillance Equipment Optimal Arrangement Using Out-of-Kilter Algorithm (Out-of-Kilter법을 이용한 지상감시장비의 최적배치모형개발)

  • 홍기남;김충영
    • Journal of the military operations research society of Korea
    • /
    • v.22 no.1
    • /
    • pp.129-141
    • /
    • 1996
  • At present surveillance equipment on the ground of the army is distributed and located by experience element and intellience preparation of the battle field. Therefore, it is hard to utilize the optimal detection capability. This paper is forcused on improving watch ratio of the named area interested(NAI) and maximizing detection area. A linear programming model is developed and network model is established on the basis of the linear programming model. And then Out-of-Kilter algorithm is utilized for the optimal solution. Finally, one of the example is provided it shows that this model minimizes the non-detection area.

  • PDF

Radar Echo Signal Simulation Equipment with a Precise Range-velocity Control Capability (정밀 거리-속도 모사 기능을 갖는 레이더 반사 신호 모의장치)

  • Han, Il-Tak;Kim, Jong-Mann;Kim, Wan-Kyu;Lee, Min-Joon
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.13 no.6
    • /
    • pp.1139-1146
    • /
    • 2010
  • Simulated target generators are used to evaluate the various radar performance. Using the radar parameters such as target range(time delay), doppler frequency, target RCS, simulated target generator can be developed. Especially moving targets are simulated by control time delay and update target signal intensive for target range. Base on this concepts, in this paper, simulated target generators are designed and developed for X-band Radar performance test. Developed equipment is evaluated its performance and then tested with X-band Radar. This paper presents these design, development, and test results of developed target generator.

STUD Welding on High Hardness Armor Steel of KWV (차륜형장갑차 고경도장갑강에 대한 스터드 용접의 적용)

  • Cho, Hwan-Hwi;Shin, Yong-cheol;Yi, Hui-jun
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.19 no.5
    • /
    • pp.567-573
    • /
    • 2016
  • GMAW and GTAW processes have been used for welding of equipment mounting pads during decades. For improving the mobility and survivability of KWV(Korean Wheeled Vehicle), various types of equipment are required and numbers of pads for welding were increased. In this research, for improving productivity of mounting pads welding process, new technology of stud welding was studied. In this study, mechanical properties of stud weldment were investigated to compare with those of GMAW weldment. Also, research of stud weldment durability was carried out and proved its fatigue strength under the condition of KWV's 32,000 km load profile.

A Study on Budget Decision Model for Initial Provisioning Spare Parts (초기보급 예비부품을 위한 예산결정 모델연구)

  • Hwang Heung-Seok
    • Journal of the military operations research society of Korea
    • /
    • v.16 no.2
    • /
    • pp.75-82
    • /
    • 1990
  • When the new equipment or weapon system is introduced to the operating unit its repair facilities and spare parts supply channels are not regularly generated. therefore, its required spare parts are initially supplied at the same time when the main equipment is deployed. For these circumstances, we are faced with the following problems : the first one is to decide the budget amounts to acquire the spare parts, the second is to choose the amounts of initial provisioning spare parts, and the third one is how to allocate the given budget for the initial provisioning spare parts. This paper emphasizes on determining the budget amounts, but also suggests the spare parts allocating methods.

  • PDF

A Study of K-9 engine Proper Depot maintenance Cycle (K-9 자주포 엔진 적정 창정비주기 연구)

  • Seo, Seong-Cheol;Kim, Tae-Gyun;Song, Bang-Won
    • Journal of the military operations research society of Korea
    • /
    • v.31 no.2
    • /
    • pp.75-85
    • /
    • 2005
  • Even though K-series combat equipment's engine depot maintenance cycle of ROK army is 10years In average, that of the K-9 Self Propelled(SP) howitzer which has been fielded since 99 $3{\sim}4$years causing limitations to effective equipment operations and combat-readiness. Therefore, the current K-9 self-propelled howitzer engine operation period of 1,500 hours, which is greatly shorter than other equipments, had to be verified. In order to find the optimum depot maintenance cycle, related field operation conditions were verified and opinions were collected, and also the background on current depot maintenance cycle setting was studied.