Browse > Article

A Study of K-9 engine Proper Depot maintenance Cycle  

Seo, Seong-Cheol (육군 전력개발관리단)
Kim, Tae-Gyun (육군 전력개발관리단)
Song, Bang-Won (육군 전력개발관리단)
Publication Information
Abstract
Even though K-series combat equipment's engine depot maintenance cycle of ROK army is 10years In average, that of the K-9 Self Propelled(SP) howitzer which has been fielded since 99 $3{\sim}4$years causing limitations to effective equipment operations and combat-readiness. Therefore, the current K-9 self-propelled howitzer engine operation period of 1,500 hours, which is greatly shorter than other equipments, had to be verified. In order to find the optimum depot maintenance cycle, related field operation conditions were verified and opinions were collected, and also the background on current depot maintenance cycle setting was studied.
Keywords
K-9 SPH; Depot maintenance cycle; Time Between Overhaul;
Citations & Related Records
연도 인용수 순위
  • Reference
1 삼성테크윈(주), K-9 자주포 창정비용 시험 장비개발, 2003.12
2 NASA, Reliability Centered Maintenance guide for facilities and collateral equipment, 2000.2
3 Army Logistics Management College, Reliability Centered Maintenance, ALM-43-7494-C
4 육군본부, 디젤엔진 MT881 Ka-500, 기술교범, 육군본부, 2000.6.30
5 윤상운, 신뢰성분석, 자유아카데미, 1996.9.30
6 육군본부, K9 종합군수지원계획서, 1999.10.30
7 이지우 외, 응용신뢰성 공학, 구민사, 2000.1.10
8 삼성테크윈(주), K-9 ILS 최신화(K-9전력화 장비 ILS), 2004.3.4