• 제목/요약/키워드: Method of delays

검색결과 522건 처리시간 0.033초

네트웍의 시간 지연이 존재하는 분산제어시스템의 램프추종 제어기 설계에 관한 연구 (A study on the ramp tracking controller for the Distributed Control System with Network-induced Time Delays)

  • 김용기;임동진
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 B
    • /
    • pp.951-953
    • /
    • 1999
  • In the distributed control systems where the control components, controllers and sensors are distributed on a communications network, there exist network time delays on communication lines between the system components. This paper deals with the ramp tracking controller design issue for such systems. Time delay terms are converted into the rational terms using Pade approximation method and the system is augmented with two integrators for ramp tracking. For this system, ${\mu}$-controller design method, which enables to meet not only performance requirements but robust stabilities simultaneously, is employed.

  • PDF

Machining Center의 고속 ATC 제어 시스템의 개발 (Development of Control System of High-speed ATC of Machining Center)

  • 한동창;이동일;송용태;이석규
    • 한국정밀공학회지
    • /
    • 제19권9호
    • /
    • pp.125-132
    • /
    • 2002
  • We use a compound-cam twin arm structure and random tool access method to achieve a faster ATC (Automatic Tool Changer) system for the accurate position and rotation control of a tool magazine and an exchange am. Based on the data obtained from various sensors, it is possible to follow the sequence of commands in each control step for an exchange arm. However, it is not so easy to reduce the exchange time of the system because of the slow responses of the sensors and execution mode delays of PLC (Programmable Logic Controller) scan time. In this paper, we propose a new programmed limit-switch position control method to obtain the shortest possible delays for the random tool access method and compound-cam twin arm structure. With some experimental results, we have achieved below 0.9sec tool exchange time with the proposed method.

Calibration of frequency propagation channel sounder based on five-port reflectometer

  • Yem Van;Braga Judson;Huyart B;Begaud X;de Sousa F.R;Huyen Nguyen Bich
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2004년도 ICEIC The International Conference on Electronics Informations and Communications
    • /
    • pp.23-26
    • /
    • 2004
  • Five-port reflectometer which consists of a ring with 5 arms (two inputs, three outputs) and three RF power detectors has been used as a vector network analyser, a demodulator in the homodyne receiver as well as in Phase Looked Loop (PLL) and so on. Calibration of five-port reflectometer is an important task. In this paper, we present a calibration method of five-port for a propagation channel sounder. The method is based on measurement of the phase differences between the three voltages at the five-port's outputs in order to determine the ratio of two input incident waves. The frequency channel sounder based on five-port is calibrated for each frequency from 2.2 GHz to 2.6 GHz with 1 MHz step. This method can also determine the absolute delays of each propagation path in the propagation channel. The calibration method is validated using measurement data.

  • PDF

A New Method for Integrated End-to-End Delay Analysis in ATM Networks

  • Ng, Joseph Kee-Yin;Song, Shibin;Li, Chengzhi;Zhao, Wei
    • Journal of Communications and Networks
    • /
    • 제1권3호
    • /
    • pp.189-200
    • /
    • 1999
  • For admitting a hard real-time connection to an ATM network, it is required that the end-새둥 delays of cells belong-ing to the connection meet their deadlines without violating the guarantees already provided to the currently active connections. There are two kinds of methods to analyze the end-to-end delay in an ATM network. A decomposed method analyzes the worst case delay for each switch and then computes the total delay as the sum of the delays at individual switches. On the other hand, an integrated method analyzes all the switches involved in an inte-grated manner and derives the total delay directly. In this paper, we present an efficient and effecitive integrated method to compute the end-to-end delay. We evaluate the network performance under different system parameters and we compare the performance of the proposed method with the conventional decomposed and other integrated methods [1], [3], [5]-[9].

  • PDF

A novel smart criterion of grey-prediction control for practical applications

  • Z.Y. Chen;Ruei-yuan Wang;Yahui Meng;Timothy Chen
    • Smart Structures and Systems
    • /
    • 제31권1호
    • /
    • pp.69-78
    • /
    • 2023
  • The purpose of this paper is to develop a scalable grey predictive controller with unavoidable random delays. Grey prediction is proposed to solve problems caused by incorrect parameter selection and to eliminate the effects of dynamic coupling between degrees of freedom (DOFs) in nonlinear systems. To address the stability problem, this study develops an improved gray-predictive adaptive fuzzy controller, which can not only solve the implementation problem by determining the stability of the system, but also apply the Linear Matrix Inequality (LMI) law to calculate Fuzzy change parameters. Fuzzy logic controllers manipulate robotic systems to improve their control performance. The stability is proved using Lyapunov stability theorem. In this article, the authors compare different controllers and the proposed predictive controller can significantly reduce the vibration of offshore platforms while keeping the required control force within an ideal small range. This paper presents a robust fuzzy control design that uses a model-based approach to overcome the effects of modeling errors. To guarantee the asymptotic stability of large nonlinear systems with multiple lags, the stability criterion is derived from the direct Lyapunov method. Based on this criterion and a distributed control system, a set of model-based fuzzy controllers is synthesized to stabilize large-scale nonlinear systems with multiple delays.

Causes of Delay in Khuzestan Steel Company Construction Projects

  • Saeb, Sajjad;Khayat, Navid;Telvari, Abdulrasoul
    • Industrial Engineering and Management Systems
    • /
    • 제15권4호
    • /
    • pp.335-344
    • /
    • 2016
  • Construction project is a competitive business with high risk especially in developing countries like Iran which faces with many problems such as delay and time and costs increases. Thus, the first priority here is to determine the causes of prolongation of construction projects and to evaluate their importance. Khuzestan Steel Company (KSC) has made important contribution to the projects in Iran and in turn is required to finish them on time. In this study, an attempt was made to investigate the causes of delay in implementation of construction projects held by this company. Data was collected through questionnaire distributed among the sample including 10 owners, 10 consultants and 15 con-tractors. Accordingly, participants rated the causes in the questionnaire so the most important priorities of each area were specified using TOPSIS method. The results showed that according to the employers, consultants and contractors' viewpoints, the most important reason for delays in construction projects of KSC is related to the financial matters. Hence, according to the results obtained, causes for delays in the company's projects are largely related to the drilling permits and long administrative cycle to renew them. Besides, continuous production of steel in this company is another reason to delays of construction projects.

Analysis of Risk Factors in Children with Suspected Developmental Delays on the Denver Developmental Screening Test

  • 방경숙
    • Child Health Nursing Research
    • /
    • 제14권3호
    • /
    • pp.261-268
    • /
    • 2008
  • Purpose: This study was conducted to estimate the prevalence of questionable development according to developmental screening testing for children, and to explore biological and environmental risk factors of developmental delays. Method: The study participants were 153 children under two years of age. A questionnaire and Home Observation for measurement of the Environment (HOME) inventory were used to collect data, and Korean Denver II was administered. Results: The overall prevalence of questionable development was 11.1%. Significant differences in biological factors between the normal development group and questionable development group were the rate of prematurity, twins, the educational level of mother and father's and the presence of an illness in the mother (p<.10). Maternal acceptance in HOME was significantly different between the two groups. The factors related to questionable development that were significant in the logistic regression analysis were prematurity (OR=3.56, p=.026), and maternal acceptance in HOME score (OR=.629, p=.028). Conclusion: Early developmental screening tests seem necessary for all children, especially for prematurely born children. Also, child rearing environments were identified as significant factors in the development of all children. These findings suggest that the HOME scores might be useful in identifying children at risk for developmental delays, and that interventions for these children will probably be more effective if their mothers are helped to provide a more appropriate social environment.

  • PDF

S-procedure를 이용한 상태에 시변 시간지연을 가지는 이산 선형 시스템에 대한 $H_\infty$ 제어기 설계 ($H_\infty$ Controller Design for Discrete-time Linear Systems with Time-varying Delays in States using S-procedure)

  • Kim, Ki-Tae;Cho, Sang-Hyun;Park, Hong-Bae
    • 전자공학회논문지SC
    • /
    • 제39권2호
    • /
    • pp.95-103
    • /
    • 2002
  • 본 논문에서는 상태에 시변 시간지연을 가지는 이산 선형 시스템에 대한 H/sub ∞/ 제어기 설계문제를 다룬다. H/sub ∞/ 제어기가 존재할 충분조건과 설계방법에 대해 논의한다. 본 논문에서 다루는 H/sub ∞/ 제어기법은 상태궤환 제어기로서 시변 시간지연의 상한값과 S-procedure를 이용한다. 또한, 변수 치환, Schur 여수정리 등을 이용하여 충분조건을 모든 변수에 대한 선행 행렬 부등식(linear matrix inequality)으로 표현한다.

시간 지연 연속 시간 시스템의 디지털 모델링 (Digital Modeling of a Time delayed Continuous-Time System)

  • 박종진;최규석;박인규;강정진
    • 한국인터넷방송통신학회논문지
    • /
    • 제12권1호
    • /
    • pp.211-216
    • /
    • 2012
  • 연속시간 시스템의 제어 이론은 잘 개발되어 왔다. 컴퓨터 기술의 발달로 인해 디지털 제어 기법이 여러 분야에 적용되어 왔다. 제어 시스템에 시간 지연이 있는 경우는 시스템을 효율적으로 제어하는 것이 어렵다. 제어기와 액츄에이터 그리고 센서와 제어기 간에 있는 지연은 제어 성능을 떨어뜨리고 전체 시스템을 불안정하게 할 수 있다. 본 논문에서는 다중의 상태, 입력 그리고 출력 지연을 가지는 제어 시스템을 위한 새로운 근사 이산화 방법과 디지털 설계 그리고 조정가능한 계수를 가지는 일반화된 쌍선형 변환 방법을 제안한다. 이 방법은 정수의 시간 지연을 가지는 이산 시간 모델을 동일한 연속 시간 모델로 다시 변환할 수 있다. 실제적인 예제를 통해 제안된 방법의 효율성을 증명한다.

An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.