References
- Aibinu, A. and Odeyinka, H. (2006), Construction delays and their causative factors in Nigeria, J. Constr. Eng. Manage, 132(7), 667-677. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(667)
- Al-Kharashi, A. and Skitmore, M. (2009), Causes of delays in Saudi Arabian public sector construction projects, Construction Management and Economics, 27(1), 3-23. https://doi.org/10.1080/01446190802541457
- Assaf, S. A. and Al-Hejji, S. (2006), Causes of delay in large construction projects, International Journal of Project Management, 24, 349-357. https://doi.org/10.1016/j.ijproman.2005.11.010
- Aziz, R. (2013), Ranking of delay factors in construction projects after Egyptian revolution, Alexandria Eng. J., 52(3), 387-406. https://doi.org/10.1016/j.aej.2013.03.002
- Aziz, R. F. and Abedel-Hakam, A. A. (2016), Exploring delay causes of road construction projects in Egypt, Alexandria Engineering Journal, In Press.
- Chan, D. W. M. and Kumaraswamy, M. M. (2002), Compressing construction duration: lessons learned from Hong Kong building projects, International Journal of Project Management, 20(8), 23-35. https://doi.org/10.1016/S0263-7863(00)00032-6
- Ezeldin, A. and Abdel-Ghany, M. (2013), Causes of construction delays for engineering projects: an Egyptian perspective, AEI, 54-63.
- Frimpong, Y., Oluwoye, J., and Crawford, L. (2003), Causes of delay and cost overruns in construction of groundwater projects in a developing countries: Ghana as a case study, International Journal of Project Management, 21, 321-326. https://doi.org/10.1016/S0263-7863(02)00055-8
- Golenko-Ginzburg, D., Gonik, A., and Laslo, Z. (2003), Resource constrained scheduling simulation model for alternative stochastic network Projects, Mathematics and Computers in Simulation, 63(2), 105-117. https://doi.org/10.1016/S0378-4754(03)00050-8
- Habibi, A., Izadyar, S., and Sarafrazi, A. (2014), Fuzzy Multi-Criteria Decision Making, Published by the inscription Gill. (In Persian).
- Hamzah, N., Khoiry, M. A., Arshad, I., Badaruzzaman, W. H. W., and Tawil, N. M. (2012), Identification of the causes of construction delay in Malaysia, World Acad. Sci., Eng. Technol., WASET. Int. Journal of Civ.Sci. Eng., 6(12), 578-583.
- Hasseb, M., Xinhai-Lu, A., Bibi, M., and Dyian, W. R. (2011), Problems of projects and effects of delays in the construction industry of Pakistan, Austr. Journal of Bus. Manage. Res., 1(5), 41-50.
- James, G. and Zack, J. R. (2004), Schedule analysis is there agreement?, Presentation, 5-6.
- Kaliba, C., Muya, M., and Mumba, K. (2009), Cost escalation and schedule delays in road construction projects in Zambia, International Journal of Project Management, 27(3), 522-531. https://doi.org/10.1016/j.ijproman.2008.07.003
- Kamikg, P. F., Olomolaiye, P. O., Gray, D., Holt, F., and Harris, C. (1997), Factors influencing construction time and cost overruns on high-rise projects in Indonesia, Construction management and economics, 83-94.
- Khanzadi, M., Afandizadeh Zargari, S. H., and Abrishamchi, I. (2011), Estimated delay in the construction of road construction projects due to weather conditions using analyzing fuzzy-probability, Transportation Journal, 8(3), 211-224.
- Mansfield, N., Ugwu, O., and Doran, T. (1994), Causes of delay and cost overruns in Nigerian construction projects, International Journal of Project Management, 12(1), 254-260. https://doi.org/10.1016/0263-7863(94)90050-7
- Marzouk, M., El-Dokhmasey, A., and El-Said, M. (2008), Assessing construction engineering-related delays: Egyptian perspective, Journal of Professional Issues in Engineering Education and Practice, 134(2), 315-326. https://doi.org/10.1061/(ASCE)1052-3928(2008)134:3(315)
- Menesi, W. (2007), Construction delay analysis under multiple baseline updates, A thesis presented to the University of Waterloo in fulfillment of the thesis requirement for the degree of Master of Applied Science in Civil Engineering.
- Mola'ie, F. and Ghazanfari Nia, J. (2009), Investigating of delay causes in construction projects, Management publication. 6th ed., 314(7).
- Ndekugri, I., Braimah, N., and Gameson, R. (2008), Delay analysis within construction contracting organizations, The Journal of Construction Engineering and Management, ASCE, 134(9), 692-700. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:9(692)
- Odeh, A. and Battaineh, H. (2002), Causes of construction delay: traditional Contracts, International Project Management, 20(1), 67-73. https://doi.org/10.1016/S0263-7863(00)00037-5
- Ogunlana, S. O., Promkuntong, K., and Jearkjirm, V. (1996), Construction delays in a fast-growing economy: comparing Thailand with other economies. Int. J. Project Manage, 14(1), 37-45. https://doi.org/10.1016/0263-7863(95)00052-6
- Ruqaishi, M. and Bashir, H. (2015), Causes of delay in construction projects in the oil and gas industry in the Gulf Cooperation Council countries: a case study, Journal of Manage. Eng., 31(3).
- Sambasivan, M. and Soon, Y. (2007), Causes and effects of delays in Malaysian construction industry, International Project Management, 25(2), 517-526. https://doi.org/10.1016/j.ijproman.2006.11.007
- Schumacher, L. (1995), Quantifying and apportioning delay on construction projects, J. Cost Eng, 37, 11-13.
- Thomas Ng, S. and Tang, Z. (2010), Labour-intensive construction sub-contractors: Their critical success factors, International Journal of Project Management, 28, 732-740. https://doi.org/10.1016/j.ijproman.2009.11.005
- Trohid, S. A. (2004), Setting methodology to determine the activities portion in creating projects delay for separate administrators, Master dissertation, Industry Engineering course, Amir-Kabir Industrial Uniersity, 160.
- Williams, T. (2003), Assessing extension of time delays on major projects, International Project Management, 21(1), 19-26. https://doi.org/10.1016/S0263-7863(01)00060-6
- Yang, J. B. and Wei, P. R. (2010), Causes of delay in the planning and design phases for construction projects, Journal of Architectural Engineering, 16(3), 80-83. https://doi.org/10.1061/(ASCE)1076-0431(2010)16:2(80)
Cited by
- The top 10 universal delay factors in construction projects vol.11, pp.3, 2018, https://doi.org/10.1108/IJMPB-05-2017-0052
- Major Factors Causing Delay in the Delivery of Manufacturing and Building Projects in Saudi Arabia vol.9, pp.4, 2019, https://doi.org/10.3390/buildings9040093
- A systemic inquiry into the delay factors in South African electrical distribution projects vol.12, pp.3, 2016, https://doi.org/10.1108/ijmpb-07-2018-0122
- Delay Causes and Emerging Digital Tools: A Novel Model of Delay Analysis, Including Integrated Project Delivery and PMBOK vol.9, pp.9, 2016, https://doi.org/10.3390/buildings9090191
- Study on the factors of delay in construction works vol.21, pp.3, 2016, https://doi.org/10.1590/s1678-86212021000300536
- Causes of Problems in Post-Disaster Emergency Re-Construction Projects-Iraq as a Case Study vol.27, pp.1, 2016, https://doi.org/10.1177/1087724x21990034