• Title/Summary/Keyword: Mega-projects

Search Result 64, Processing Time 0.022 seconds

Causal Relationship Between Indian Ports' Originated Container Traffic and Total Transshipments of Port of Colombo: A Granger Causality Analysis

  • Bandara, Sooriya;Ryoo, Dong-Keun;Ahn, Ki-Myung
    • Journal of Navigation and Port Research
    • /
    • v.42 no.5
    • /
    • pp.357-364
    • /
    • 2018
  • Colombo noticeably became the most economical gateway to the Indian subcontinent, in terms of cost as well as time. The Colombo Port Expansion Project (CPEP) started commencement with the purpose of accommodating mega ships, under the long-term strategies of making Colombo the hub of South Asia. In this context, the purpose of this study is to investigate the causal relationship between Indian ports' originated container traffic, and total transshipments of the port of Colombo, and also to identify the nature of the causality between the two variables, evaluating Granger causality test results. It finds unidirectional causality from total transshipments of Colombo to Indian ports' originated transshipments in the port of Colombo. It suggested that ongoing port expansion projects, opening up for new markets and attracting new shipping lines in the port of Colombo, have generated significant impact on Indian ports' container traffic, via the port of Colombo. Findings would be valuable for future forecasting of container traffic in Colombo port and the policy-making process in the port as well.

A Standard Method for Progress Measurement in a Petrochemical Plant EPC Project (석유화학 플랜트 EPC 사업의 진도율 산정표준의 제안)

  • Cho, Hong-Yeon;Yoo, Hoseon
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.77-87
    • /
    • 2011
  • In proportion to continuing growth of overseas plant market and the trend of its mega scale of the project, the importance of management is significantly emphasized for the successful execution of the project. And it is recognized that progress control is the most important management item amongst the others in the management. Progress control is importance of progress measurement for performance measurement and process control of project, but it is hardly obtainable securing the objectivity in the progress measurement since the progress measurement are being applied differently in accordance with the project conditions and the experience level of the person in charge for the progress control. This study has conducted as following to propose a standard method for progress measurement in a petrochemical plant protect. Domestic and overseas plant projects are investigated variously with the applied method of progress measurement, and the deduced problem of progress measurement. And then standard method for progress measurement of engineering, procurement, construction and commissioning has been proposed according to comparison and analysis of practices in domestic & overseas plant project, procedures for progress control in the globally reputed petrochemical client, company rules and recommendation of the expert in progress control.

  • PDF

Relations of Complexity, Risk Perception and Opportunism on Overseas Mega-Project: Modulating Effect of Contractual Governance (해외 대형 프로젝트의 복잡성, 위험인지 및 기회주의의 관계: 계약적 지배구조의 조절효과)

  • Teck-Kyu Kim;Hun-Joo Jung
    • Korea Trade Review
    • /
    • v.45 no.5
    • /
    • pp.91-116
    • /
    • 2020
  • The construction industry can be described as one of the most volatile industry depending on the situation. As such, a contractor, who is usually positioned to take all kinds of risk, may frequently require to form a strategic partnership for better execution of a project. In this study, we are going to review act or behavior that may happen among such partnership. For such review, a survey targeted at domestic construction companies has been conducted on their thoughts as regards opportunism, risk perception, and the contractual governance between partners. The analysis result of structural equation and regression has indicated that there exists a positive effect on the opportunistic behavior from the risk perception, a moderating effect on contractual governance between the performance risk and opportunism, whereas no such moderating effect on the same between relational risk and the opportunism. The output of this study may assist various domestic individuals who wish to participate large scaled overseas projects.

Improvement of the Code Classification Structure in Piping Material Management for Petrochemical Plant Projects (석유화학 플랜트의 효율적 배관자재 관리를 위한 코드분류체계 개선)

  • Lee, Jong-Pill;Moon, Yoon-Jae;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.11 no.1
    • /
    • pp.39-49
    • /
    • 2015
  • The objective of this study is to improve the classification structure of commodity code for piping material management which is considered as the fundamental of commodity code and piping material management system. It enhances the efficiency of piping material management directly or indirectly affecting the engineering, procurement and construction in a petrochemical plant projects. To establish an improved code classification structure, this study identifies the problems of former code classification structure in details, as well as the characteristics of other domestic and global EPC company's code classification structures and presents the improved direction considering the recently mega-sized and specialized projects. Accordingly, to efficiently enhance piping material management, the improved code classification structures have been derived from defining suitable code classification structure for specific piping component, adding more standard attribute, expanding the number of code digits and classifying code hierarchy. The results of applying the improved classification structure of commodity code to on-going project have led to reduce the rate of rework from 4.98% to 2.48% for developing purchase description and also have saved working time for executing piping design by 3D modeling from 6 months by two persons to 4 months by a person which is decreased 67% consequently. In addition, the structures of pyramid code management have resulted to accumulation and analysis of the various piping data for other disciplines such as procurement and estimation team which require commodity code information through the company's material control system.

  • PDF

Exploring Delays of The Mega Construction Project: The Case of Korea High Speed Railway (대형 건설사업의 공기지연분석: 경부고속철도 건설사업을 중심으로)

  • Han, Seung Heon;Yun, Sung Min;Lee, Sang Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.839-848
    • /
    • 2006
  • Korea has become the 5th country to own and operate the high speed railroad in 2004. However, there were many difficulties until Koreans enjoy the first bullet train service with the average hourly speed of 300km. The high speed railroad requires elevated quality standards differently from the traditional railways. In addition to the technical difficulties, the construction project itself was an unpleasant case with huge delays and cost overruns mainly due to the lack of experiences, deficiency of owner$^{\circ}{\O}$s role, and increase of public resistances triggered by environmental concerns. This paper analyzes the reasons for delays on this mega-project. With respect to the characteristics of the whole project level, it is very complicated/linear project, whose total length is around 412 km with the composition of various sections in the route of the railway which have basically different conditions. For that reason, the analysis is performed in both macro and micro level. First, macroscopic analysis is performed to find critical subdivisions in the railway route that induces the significant delay in the opening due date. Then, microscopic analysis is followed to quantify the causes and effects of delays focused on these critical subdivisions in more detailed way. Finally, this paper provides lessons learned from this project to avoid the decisive delays in performing the similar large-scaled projects.

Risk Assessment Model for the Delay Protocol in the Conditions of Contract of International Construction Projects (해외 건설공사 공기지연사건의 합리적 대응을 위한 계약조건 리스크 평가 방법)

  • Lee, Hwangku;Shin, Dongwoo;Kim, Kyungrai;Cha, Heesung;Kim, Youngjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.65-77
    • /
    • 2017
  • Recently, many Korean major construction companies are suffering from profit loss mainly due to a direct impact from delays in their overseas projects. In general, changes are inevitable in a large-scale project, and most of changes are directly linked to construction delay. Therefore, in the event that an extension of time is necessary due to a change, the contractor must manage the delay based on the condition of the contract to effectively manage risks from delay to the completion date. Thus it is important to understand delay protocol defined in the condition of the contract early in the project, but there have been few or no study to propose methodology or tool to support this effort. This paper presents a review on the project planning and controling practices of major Korean construction companies along with the issues on delay claims and disputes in mega-international projects and suggests a tool to assess delay risk in the condition of the contract. To propose a delay risk assessment model for international construction projects, major standard conditions of contract have been reviewed including FIDIC Red Book(1999), PSSCOC(2014) and SIA 9th Edition(2010). To reflect recent trend of major international owners, standard conditions which they are utilizing for their projects also have been reviewed including those of ARAMCO and QP. The model provides a categories of risks to be reviewed on the condition of the contract along with standard level of the risk which is common in the international standard form of the contracts. This study also performed a case study on an actual international project to confirm the effectiveness of proposed model to identify and respond to a delay risk of a project.

A Study on the Policies Evaluation Framework for Environmentally Friendly City (환경친화적 도시 조성을 위한 정책평가체계에 관한 연구 - 저부하형 도시 조성을 중심으로 -)

  • Yoon, So Won
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.6 no.4
    • /
    • pp.8-16
    • /
    • 2003
  • In terms of climate change communities have only during the 1990s begun to recognize that all greenhouse gas(GHG) emissions are directly or indirectly generated locally, through acts of agency, production or consumption. This has provided a boost to the role of local places in the debate since GHGs can be allocated and made understood locally and hence form the basis for specific policies, programs, plans and projects. The objectives of this study are to define a framework for making Environmentally Friendly City through enhancing integrated energy-urban policies and present framework to do comprehensive evaluation on energy related policies response and also explore the interrelation between energy related activities in each sector and policy and applies to Seoul mega city in Korea. Despite the growing recognition of the seriousness of urban environmental problems and their contribution to global environmental and social concerns, most analysts continue to study cities in parts rather than as a whole; we study sectoral sub-systems such as transport, air pollution or energy. While specialization is useful for detailed thinking, we also need to see each issue in the context of how each city works environmentally, economically, socially and politically. We therefore need integrative approaches to study of cities and need to understand how they function as systems. These framework presented in this study allows an organized and systematic analysis. These research results can provide useful, credible and timely input into the urban planning process. This study will be a helpful exercise to draw some policy implications of other cities in Korea and also East Asia that are in a similar stage with the these cities and developing plans on how to address them.

QR Code-Based Strength Labeling Techniques for Concrete Life-Cycle Quality Maintenance (콘크리트 생애주기 품질관리를 위한 QR 코드 기반 강도 라벨링 기술)

  • Kim, Tae-Heon;Kim, Dong-Jin;Park, Seung-Hee
    • Journal of the Korea Concrete Institute
    • /
    • v.23 no.5
    • /
    • pp.603-608
    • /
    • 2011
  • In recent years, numerous mega-sized and complex civil infrastructures are being constructed all over the world. Therefore, more precise construction and maintenance technologies are required for these complicated construction projects. Especially, exact strength measurement and curing process monitoring of the concrete structures are very crucial to confirm the safety and effectiveness of these complicated structures. In this paper, a new Quick Response (QR) code-based concrete strength labeling technique using embedded self-sensing monitoring system is introduced. It is important to note that the QR code-based concrete labeling technique enables easy access of the databases related to the concrete strength at anytime, anywhere, and any smart PC devices. Finally, by integrating the proposed QR code-based concrete labeling with the concrete strength databases already prepared at a designated web-server, a feasibility of the current system is investigated for a next generation concrete life-cycle quality maintenance.

Elasto-plastic time history analysis of a 117-story high structure

  • Wu, Xiaohan;Li, Yimiao;Zhang, Yunlei
    • Computers and Concrete
    • /
    • v.19 no.1
    • /
    • pp.7-17
    • /
    • 2017
  • In Chinese Design Codes, for super high-rise buildings with complex structural distribution, which are regarded as code-exceeding buildings, elasto-plastic time history analysis is needed to validate the requirement of "no collapse under rare earthquake". In this paper, a 117-story super high-rise building is discussed. It has a height of 597 m and a height-width ratio of 9.5, which have both exceeded the limitations stipulated by the Chinese Design Codes. Mega columns adopted in this structure have cross section area of about $45m^2$ at the bottom, which is infrequent in practical projects. NosaCAD and Perform-3D, both widely used in nonlinear analyses, were chosen in this study, with which two model were established and analyzed, respectively. Elasto-plastic time history analysis was conducted to look into its seismic behavior, emphasizing on the stress state and deformation abilities under intensive seismic excitation.From the comparisons on the results under rare earthquake obtained from NosaCAD and Perform-3D, the overall responses such as roof displacement, inter story drift, base shear and damage pattern of the whole structure from each software show agreement to an extent. Besides, the deformation of the structure is below the limitation of the Chinese Codes, the time sequence and distribution of damages on core tubes are reasonable, and can dissipate certain inputted energy, which indicates that the structure can meet the requirement of "no collapse under rare earthquake".

Framework and Core Competency of Integrated Design Management (IDM) (통합설계관리의 개념적 틀 및 역량강화 요소 - 건축과 플랜트를 중심으로 -)

  • Kim, Yesol;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.122-133
    • /
    • 2014
  • Recent diversification of project delivery systems coupled with increasing mega-projects requires highly advanced construction management techniques. Among those techniques, procurement and design management are recognized as being the first priority for overseas construction projects. Nevertheless, previous research in design management has been limited to the quality management of the design documents at design stage. Therefore, it is necessary to explore the design management from a comprehensive perspective throughout the project life cycle. In this context, the purpose of this paper is to propose a conceptual framework for integrated design management (IDM). Several different concepts in relation to design management were investigated first in order to identify the major variables of the IDM framework. A comprehensive comparison of construction management methodologies was also analyzed in order to identify key factors of IDM. Finally, an IDM framework was proposed by combining those factors and relevant issues. Based on the proposed framework, a survey was conducted in order to validate the framework as well as to identity important areas for improving competitive capability of Korean construction companies.