The Project Management Information System for the Work Efficiency Improvement (업무 효율 향상을 위한 사업관리정보시스템)

  • Ryu, Jee-Woong;Song, Jong-Cheol;Moon, Byung-Joo;Jung, Hoe-Kyung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.1
    • /
    • pp.18-24
    • /
    • 2014
  • For successful projects, Project Management Information System(PMIS) using the formal systematic processes is necessary. Because the existing PMIS focuses on low-level project management, the life-cycle administration of the projects is required. In this dissertation, I describe not only the processes for managing a project with the top-down approach(a hierarchical goal setting of the project outcome), but also PMIS which can control whole processes of R&D projects. The PMIS described in this dissertation can reduce the workload of project management by providing user-adaptive environments and linking with related systems, so can be helpful to enhance the efficiency of the project management. And, it is expected that these processes can be the standard project management processes which are adaptive to various types of projects.

Decision Making Support Tool for Master Architect in Design Development Phase of Mega-Project (메가프로젝트 기본설계단계의 Master Architect 의사결정지원 도구)

  • Cho, Dong-Hyun;Koo, Kyo-Jin;Park, Sung-Chul;Kim, Jong-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.202-206
    • /
    • 2008
  • Recently, as high level of interest for the city regeneration, large-scale projects are planned or being performed such as reconstruction project. These mesa-projects have different characteristics from a single project in the design phase. It is a number of companies involved in design phase of mega-project and principal decision-making entity manage the project from the initial stage of an ongoing business by coordinating an opinions between design companies. The absence of a decision making support system reflected those characteristic causes a variety of problems such as a loss of cost and schedule. Therefore the final object of this paper is to propose a decision making support tool and system interface.

  • PDF

Analysis of Construction Schedule Progress Management Practice (건설공사 진도관리의 현황 분석에 대한 연구)

  • Shin, Yoon-Kyung;Yun, Seok-Heon;Pack, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.207-211
    • /
    • 2010
  • As mega-sized and complex building construction projects are increased, the importance of project scheduling and control is emphasized. Project scheduling and control technic is not used widely yet in Korea, but interests in it is progressively increased. By now, most research projects mainly have focused on scheduling issues. Project progress management is also as much important as project scheduling issues. Current state about project progress management in Korea is analysed and way for improvements are suggested in this paper. At first, research projects undergone and practice are analysed and fields experts are survey about current state about project progress management. This study suggests the progress management method for quantitative and qualitative project progress analysis.

  • PDF

THE STUDY OF MULI-LEVEL PERFORMANCE MEASUREMENT APPROACH FOR VALUE MANAGEMENT OF CIVIL INFRASTRUCTURE PROJECTS

  • Jong-Kwon Lim;Min-Jae Lee;Dong-Youl Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1294-1299
    • /
    • 2009
  • Best value in value engineering has relation to cost and performance. But a severe problem in VE study of a project is to reduce value due to loss of performance, caused by focusing on cost reduction. Also a lack of understanding performance concept, no trial VE workshop as well as cost saving-based policy have not satisfied customer needs. A efficient and practical methodology for accomplishing best value in construction projects is proposed. This study developed a more objective approach for performance measurement approach of mega projects and suggested a systematic process of performance quantitative analysis verifying value improvement. The proposed performance measurement method would be very useful for better communication and consensus between stakeholders and VE team especially through value engineering.

  • PDF

Development of Review Processes and Tools for Liquidated Damages for EPC/Turnkey Project: Contractor's Perspective

  • Hahn, Ki Jeong;Lee, Eul-Bum;Kim, Young Ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.718-719
    • /
    • 2015
  • As a recent global trend, the majority of plant projects are delivered through EPC or EPC-turnkey contracts, where a contractor's liability is more complicated because of the mega size scale and financing method. Previous researches have been lacking a practical usability for project members for liabilities of contracts. Those were focused on solving the claims or schedule calculation issues only. The objective of the present study was to develop a validation process for LDs (liquidated damages) in contractor's liabilities with various case studies and expert judgments. As summarized in this paper, the processes and tools were developed with project life cycle process. The project preparation phase includes 3 step check lists to determine the Go or No-go for projects. In progress phase, contractors should focus on the response strategies for claims with liabilities. The study concludes that those developed processes and tools will help to manage risk of LDs for the contractors in the overseas projects.

  • PDF

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

Mega-Sporting Events from the Perspective of Russian Cultural Policy in the 21st Century (21세기 러시아 문화정책 차원에서 바라본 메가 스포츠이벤트)

  • Song, Jung Soo
    • Cross-Cultural Studies
    • /
    • v.43
    • /
    • pp.289-326
    • /
    • 2016
  • The strategy of "soft power" in the foreign and internal policies of modern Russia is one of the important factors in the implementation of public policies, and the influence of soft power is increasingly becoming stronger and gaining new forms and methods of implementation. The Russian government exerts efforts to form a positive image of Russia in the international arena, in order to strengthen the country's competitiveness, based on active use of "soft power." Currently, Russian cultural policy is developing in two main directions. In the internal policy sphere, the Russian government emphasizes national unity and civic solidarity, and fosters a sense of patriotism and national pride. In the sphere of foreign policy, the Russian government is attempting to regain its status as a great power and to create a new image of Russia that is different from that of the former Soviet Russia. In this article, we examine and analyze various aspects of the hidden political mechanisms involved in mega-sporting events, in particular the Sochi Olympics, from the viewpoint of Russian internal and foreign policy. We address the major functions of mega-sporting events and their influence in the political realm. The political impact of mega-sports projects can even compensate for economic losses incurred during the preparation and hosting of the Olympic games. In this respect, we can define mega-sporting events as one of the main components of soft power; such events reflect the basic directions of internal and foreign policy in post-Soviet Russia, which are to form and promote an image of Russia using national branding. In order to fairly and objectively analyze the recognition and perception held by Russians of the significance of mega-sporting events, in this work, we carefully studied the results of various surveys conducted by the Russian research organization VCIOM (Russian Public Opinion Research Center) before and after Russia hosted the Winter Olympic games in Sochi (2014) and the Summer Olympic games in Kazan (2013). Furthermore, on the basis of the ranking of national brands by Simon Anholt (Anholt Nation Brands Index - NBI), and on the basis of the ranking of 100 national brands conducted by the British consulting company "Brand Finance" (Brand Finance Nation Brands 100), we minutely trace the development and qualitative change in Russia's image and the role of the mega-sporting projects. This article also examines the Kremlin's internal and foreign policies that were successfully carried out in practical terms. This study contributes to the understanding of the value of mega-sporting events from the point of view of cultural policy of the current ruling party of Russia. This standpoint allows us to outline the main directions of Russian cultural policy and to suggest perspectives on the branding strategy of modern Russia, including strategies related to consolidating Russia's position in the international arena.

The Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects (공동주택 건설공사의 발주방식 영향요인 분석)

  • Moon, Hyun-Seok;Hong, Tae-Hoon;Koo, Gyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.75-84
    • /
    • 2008
  • Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods. However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough prcject characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects.

Lessons learned from Multinational Parties Involved Program Management Consortiums in Korea

  • KO, Ok-Yeol
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.32-36
    • /
    • 2015
  • This study explores the issue of program management consortia involving multinational participants. The aim of this research was to leverage advantages in program management (PM) skills and PM model improvement in product line construction in mega scale construction programs, typically funded by public funds. Such ventures involve multinational parties using dedicated partnering based on a program management consortium (PMC) to reduce confrontation between parties in complex circumstances, allowing an open and non-adversarial approach to project management. This research also seeks to implement an ongoing feedback program of best practices and lessons learned to minimize the repetition of mistakes and to reduce costs in sequenced construction. Recently, the Korean government has planned to undertake three large new projects: the Korean Peninsula major river maintenance, the reclamation of Se-Mangum, and the Science/Business City. This paper starts by providing a framework for the cost-reduction strategy for the United States Forces Korea (USFK) Relocation Program, which will be funded with public funds and a private fund investment (PFI) that combines programs executed by two governments as owners and multinational stakeholders, joined in the PMC. The establishment of project-oriented consortia is an innovative and non-adversarial approach to massive international construction projects. Such projects have used various tools effectively and skillfully. This experience may offer an opportunity to practice new and advanced program management delivery methods, and it is expected that Korea will gain a competitive advantage in the international construction market.

  • PDF

Development of Change Management System for Urban Development Project (신도시 건설사업의 변화관리시스템 구축에 관한 연구)

  • Cho, Jinyoung;Jang, Ounsung;Yu, Junhyuk;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.79-86
    • /
    • 2014
  • Construction project become larger and more complicated. Korea go through government complex relocation Mega-size program including many sub-projects which were complicated, long-term, and need extensive funding. Effective change management is very important for this kind of mega-project since it has many stakeholders and can't avoid continual change of schedule, budget, etc. Especially, change management process and system is very important for program success. When each project have changes, program is impacted by these changes. So, Change management is very important for effective program budget and time management. This study try to develop change management process and framework considering continuous changes in project level for effective program management. In addition, this study developed change management system and applied it to new mega-size program and analyze the effectiveness.