• 제목/요약/키워드: Mega-Y Projects

검색결과 42건 처리시간 0.023초

제임스 터렐의 작품에 나타난 기하학적 공간구성, 시지각적 역동성 그리고 존재론적 의미에 관한 연구 - '웨지워크', '스페이스 디비전', '스카이스페이스' 프로젝트를 중심으로 - (A Study on the Geometrical Space Composition, Dynamic Visual Perception and Questions of Existence found in the Works of James Turrell - Focusing on 'Wedgework', 'Space Division', 'Skyspace' Projects -)

  • 김종진
    • 한국실내디자인학회논문집
    • /
    • 제21권5호
    • /
    • pp.145-152
    • /
    • 2012
  • Since 1966 when James Turrell completed his studies on Art, he has been working on the consistent theme of Art. For the 46 years of time, site contexts, scales, methods of light have been changed and they made Turrell's unique 'project series'. Each series has different spatial, visual-perceptual forms and characteristics from other series. The differences were caused by the given situations, but also Turrell intentionally pursued it. However, there are essential theme of art that has not changed in most of Turrell's projects. Target of this paper is to study the unchanged theme as well as the differences. The study starts with three questions: first, what is the geometrical space composition?, second, what is the visual-perceptual phenomenon?, third, what is the hidden consistent theme? This research focuses on three case projects: Wedgework, Space Division Constructions, Skyspaces. These project series are in between the early small object-like installations and the late mega-scale outdoor projects. The study found that geometrical space composition has important role to give visual-perceptual dynamism to the viewer. The phenomenological perception is connected to the questions of relationship between human and space, ultimately human and the world. Although the Merleau-Ponty's philosophy has been related to the work of Turrell in various previous studies, Cartesian 3-dimensional geometry has also crucial role to experiment a viewer's perceptual boundaries. Image of infinity is another aspect of three cases, especially Space Division Constructions and Skyspaces. Through these structure, Turrell's work lead to an ultimate question of meaning for human existence in infinite space. It is hoped that this paper is helpful for Architecture and Interior design field in which light and space are essential.

  • PDF

도시 및 주거환경정비사업의 업무분석을 통한 문제점과 개선 사항 -조합설립추진위원회와 조합설립 업무를 중심으로- (Problems and Suggestions for Improvement Derived from an Analysis of the Work of the Urban & Residence Environment Improvement Project -Focused on the Establishment of Preparation Committee and Association Committee-)

  • 류한국;손보식
    • 한국건축시공학회지
    • /
    • 제10권3호
    • /
    • pp.39-47
    • /
    • 2010
  • 정부는 국지적 입체복합공간 개발사업에서 벗어나 광역적 도시재생사업을 통하여 낙후된 지역에 대한 도시및주거환경개선과 기반시설을 확충하고 있다. 도시기능의 회복을 위한 사업을 광역적으로 계획하고 체계적이고 효율적으로 추진하여 도시의 균형 발전과 국민 삶의 질 향상에 기여하고자 노력하고 있다. 그러나 국내의 도시재생과 같은 대규모 사업이 단편적으로 있었으나 다양한 사업형태를 하나의 프로그램으로 정형화하여 수행할 수 있는 업무 프로세스가 정립되지 않아 사업에 참여하는 주체들간의 혼선이 발생한다. 특히 일반 주민들로 구성된 조합설립추진위원회와 조합은 재개발, 재건축, 도시및주거환경정비사업 등을 수행하는데 지식이 부족하므로 추진하는데 상당한 어려움을 느끼고 있다. 따라서 본 연구는 이러한 문제점을 해결하기 위하여 도시재생과 관련된 기존 연구를 분석하였다. 본 연구의 세 가지 연구성과를 도출하였다. 첫째, 국내의 도시및주거환경정비사업의 민간시행자의 역할을 하는 시행단계(조합설립추진위원회 승인, 조합 설립인가)의 행정적 업무 절차와 실무상의 업무 절차를 분석하였다. 둘째, 도시및주거환경정비사업의 조합설립추진위원회 및 조합 설립 단계에서의 문제점을 도출하고 마지막으로 개선방안을 제시한다.

Port Competition and Co-operation as a Strategy of Busan Port

  • Yoon, Mi-Sun;Nam, Ki-Chan
    • 한국항해항만학회지
    • /
    • 제30권9호
    • /
    • pp.749-754
    • /
    • 2006
  • The maritime logistics environment including seaborne trade, shipping and ports is changing rapidly and continuously. Large containerships, mega carriers and global terminal operators try to achieve economies of scale and economies of scope. As a result of the changing environment, the competition between ports to achieve competitiveness is intensive. Port competition among China, Japan and Korea is becoming fiercer, both directly and indirectly, resulting from the increased trade in northeast Asia. Port development projects within each country stimulate more intensive port competition. As a result, overcapacity, fierce price competition and overlapping hinterland problems will be caused in the future. Co-operation for survival is considered as a strategy in order to solve anticipated problems caused by port competition Busan port, for instance, could co-operate with China and Japan as well as with other ports in Korea Terminal operators' expansion through investments including joint-ventures will make connections between ports smoother. At the port authority level, continuous cooperative interchange between countries is indispensable.

The Development of the East Asian Observatory

  • Ho, Paul
    • 천문학회보
    • /
    • 제40권2호
    • /
    • pp.27.3-27.3
    • /
    • 2015
  • The East Asian Observatory (EAO) was established in 2014 by the East Asian Core Observatories Association (EACOA). The goal of the EAO is to build and operate world-class facilities on behalf of the East Asian regions, as a counterpart to the European Southern Observatory (ESO). Leading astronomical facilities such as ALMA, TMT, GMT, and SKA are mega projects which require enormous economic resources. It is difficult for any observatory or any country to fund such facilities on its own. EAO intends to combine the resources and manpower in our East Asian regions, in order to play a leading role in the next generation frontier instruments. The EACOA institutes: NAOC, NAOJ, KASI, and ASIAA, have authorized the EAO to take on the operations of the James Clerk Maxwell Telescope (JCMT) on Mauna Kea as their first joint venture. In this talk, we will report on the development of EAO, our current operations of JCMT, and our future aspirations.

  • PDF

철도건설사업의 효율적인 VE수행을 위한 성능측정기법 (Performance Measurement Method for Efficient Value Engineering Study of Railroad Construction Project)

  • 임종권;박미연;박흥민;김성훈;이광균
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.2242-2249
    • /
    • 2008
  • A severe problem in VE study of a project is to reduce value due to loss of performance, caused by focusing on cost reduction. Also a lack of understanding performance concept, no trial VE workshop as well as cost saving-based policy have not satisfied customer needs. A efficient VE job plan for especially large scale railroad construction project is proposed in this study. This study developed a more objective performance evaluation system for value engineering study of mega projects and suggested a systematic process of performance quantitative analysis for value improvement. The proposed performance measurement method would be very useful for better communication and consensus between decision makers and VE team.

  • PDF

공사 진척관리 현황분석을 통한 진척관리 개선방안에 관한 연구 (A Study on the Improvement through Analysis with Present Condition of Progress Management for Construction Project)

  • 박원호;심재광;윤석헌
    • 한국건축시공학회지
    • /
    • 제10권3호
    • /
    • pp.137-144
    • /
    • 2010
  • 건설 프로젝트가 대형 복잡화가 되어짐에 따라 프로젝트의 공정관리의 중요성이 대두되고 있다. 프로젝트 공정관리 기술은 한국에서 널리 사용되고 있지 않지만 점차적으로 증가하고 있는 추세다. 요즘 대부분의 연구 프로젝트들도 공정쪽에 초점을 두고 있다. 프로젝트 진척관리 또한 프로젝트 공정관리의 하나로써 매우 중요하다. 이에 본 연구에서는 국내 진척관리의 상태를 분석하기로 하며 진척관리의 현재 상태에 대해 전문가와 현장사람들에 대한 인터뷰를 진행하였다. 본 연구는 질적, 양적으로 프로젝트 진척분석을 위한 방법으로 BIM 기반의 진척관리를 제안하고 있다. 현재 BIM은 설계, 시공, 유지관리단계등에서 사용되고 있으며 또한 BIM을 이용한 진척관리는 프로젝트에 대해 이해하고 정확성을 키우는데 이바지 할 것이라고 생각된다.

BIM을 활용한 다중복합 프로젝트의 인트라넷 기반 통합사업관리체계 구축 방안 (Development of intranet-based Program Management Information System of multi-complex project with application of BIM)

  • 송일갑;허영란;서종원
    • 한국BIM학회 논문집
    • /
    • 제2권1호
    • /
    • pp.27-39
    • /
    • 2012
  • 공공사업의 경우 다중 프로젝트, 메가 프로젝트 등 다양한 발주형태로 건설사업이 추진됨에 따라 복합적이고 다원적인 관리가 필요하다. 건설사업관리를 효과적으로 하기 위하여 PMIS가 널리 사용되고 있으나 현재 대다수의 PMIS는 단일프로젝트 중심으로 개발되어있어 전체 사업관리를 위한 시스템 통합과정에서 시스템 간의 호환성 문제가 발생한다. 또한 공공사업 중심으로 사업과정에서 BIM을 적용하도록 한 발주가 증가하였으나, 아직까지 BIM을 활용한 사업관리를 위한 BIM 데이터 연계 PMIS의 개발 및 연구가 부족한 실정이다. 따라서 본 연구에서는 PMIS As-Is분석과 To-Be분석을 통해 다중복합 프로젝트 PMIS의 주요 목표기능을 도출하고 Internet-Intranet의 이원화 관리체계를 분석하여 통합사업관리체계를 적용한 PMIS 발전모델과, 상용 BIM Tool과 PMIS를 직접 결합하는 방식이 아닌 BIM 기술의 순차적인 적용방안을 통하여 통합사업관리시스템에 적합한 BIM 기반 PMIS 구축방안을 제시하여, 궁극적으로 BIM 기술의 활성화에 대비한 단계별 PMIS 발전 모델을 제안하는데 그 목적이 있다.

양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향 (A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement)

  • 박종순;신창준;유병기;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.5-12
    • /
    • 2008
  • 양산 부산대학교병원 건립공사는 종합병원 의료타운 신축 프로젝트이다. 계획단계부터 건설사업관리자(CMr)가 참가하여 설계 시공일괄사업자를 선정한 후, 실시설계 진행과정을 거쳐 시공단계, 시공이후단계에 이르기까지 프로젝트의 모든 단계에 건설사업관리(CM) 업무를 일관적으로 적용한 사례이다. 또한 설계와 시공의 추진에 Fast Track을 도입하여 공기단축에 성공한 것에 그 의미를 찾을 수 있다. 본 사례는 설계 이전단계에 설계시공일관업체를 선정하였으며, Fast Track수법의 적용을 염두에 둔 설계 및 공사일정계획, 설계단계의 설계관리, Fast Track에 입각한 단계별 공사발주 및 계약관리, 기본설계 실시설계단계의 VE 수행, 시공단계에서의 설계변경 관리, 시공 후 유지관리 단계의 운용관리 등 건설사업관리 업무가 모든 단계에서 다각적으로 제공되었다. 본 보고에서는 상기와 같은 건설사업관리 적용상의 과제와 개선방향, 특히 설계 시공일괄사업에서 효율적으로 CM 업무를 수행할 수 있는 방안을 제시하여, 초대형 턴키(Turnkey) 프로젝트의 CM적용에 기여하고자 한다.

  • PDF

해외건설시장 진출을 위한 건설사의 Pre-construction Service 핵심역량 분석 (An Analysis of Core Competence of Pre-construction Service of the Making Inroads into Oversea Construction Market (*for the Entry in the International Construction Business))

  • 변일우;김예상
    • 한국건설관리학회논문집
    • /
    • 제13권2호
    • /
    • pp.80-90
    • /
    • 2012
  • 2011년을 기준으로 국내 건설시장은 민간 부문과 공공부문의 발주 감소로 전반적인 건설 경기 침체가 되고 있는 실정이며 해외 건설의 경우는 플랜트에 편중된 시장 점유로 인해 전체 건설업에 대해서는 중국 및 인도 등에 경쟁력을 잃어가고 있다. 또한 선진국에 비해 고부가가치 기술경쟁력이 열위에 있는 상황에서 국내 건설사들의 경쟁력 강화에 대한 연구들이 이루어지고 있는데, 최근 국내 외에서 Pre-construction Service(이하 Pre-con Service)의 중요성이 부각되어 대형 건축 및 플랜트 프로젝트 발주 시 이를 통한 발주가 늘어나는 추세이다. 그러나 국내 건설사들의 Pre-con 업무에 대한 일반적인 이해부족과 업무 체계 정립이 미흡하여 Pre-con Service에 대한 대응 전략은 부족한 상황이다. 이에 본 연구에서는 국내 건설사의 해외 건설 시장 진출을 위한 Pre-con Service의 핵심 업무를 규명하고 그 중요도와 현 역량 수준을 비교 분석하여 이에 따른 역량 향상의 방향을 제시하고자 한다.

전자매뉴얼을 활용한 도시재생사업의 법.행정절차 제공 시스템의 개념적 모형 (A Conceptual Model for an Administrative and Legal Process Provider of Urban Regeneration using Construction Interactive Electronic Technical Manual)

  • 박문서;정진욱;이현수
    • 한국건설관리학회논문집
    • /
    • 제11권3호
    • /
    • pp.33-42
    • /
    • 2010
  • 최근 건설 산업은 IT기술의 발전과 함께 새로운 기류를 맞고 있다. 컴퓨터를 이용한 다양하고 신속한 정보 및 지식관리가 이루어지고 있으며 사용자간 의사소통도 활발하게 이루어지고 있다. 이미 시공단계의 정보들을 처리해 주는 PMIS와 사용자들의 업무 노하우를 공유하는 수단인 KMS와 같은 시스템이 현장에 적용 되어 활용되고 있고, 최근에는 전자매뉴얼(IETM)로 대변되어지는 생애주기 전반의 법, 행정 절차제공자에 관한 연구로 범위가 확장되고 있다. 그러나 도시재생사업과 같은 대규모 건설사업의 경우 사용주체와 용도에 따라 주요 기능이 역동적으로 변화되는데 이 역동성은 전자매뉴얼 고유의 역할을 제한하기도 하고 기존의 시스템들과 경계를 모호하게 하기도 한다. 이에 본 연구에서는 경력 실무자들을 대상으로한 설문과 인터뷰, 건설프로젝트의 특성 분석을 통하여 건설분야 전자매뉴얼이 갖추어야 할 요소들과 설계 전략을 규정하고 이를 토대로 도시재생사업의 적용예를 통해 법과 행정절차 제공자라는 개발취지에 적합한 전자매뉴얼 개념 모델을 제시한다.