• 제목/요약/키워드: Mega Projects

검색결과 65건 처리시간 0.03초

The Evolution of Seismic Engineering and Design of Ultra Tall Buildings in China Innovations and Sustainability

  • Wang, Aaron J.
    • 국제초고층학회논문집
    • /
    • 제5권3호
    • /
    • pp.221-232
    • /
    • 2016
  • With the booming of construction and property industries in China, the demand for high-rises and mega-scale buildings with more integrated building functions, open- and tailor-shaped outlooks, better connections to municipal infrastructures, and higher grades of building importance has been increasing in the past two decades. The seismic design and engineering of such modern mega-buildings face engineering challenges such as hazard mitigation of extreme actions and surroundings, integrated structural frameworks and building skins, complex connections, and overall construction efficiency. It is the work of a new generation of civil and structural engineers to enhance engineering efficiency and achieve overall engineering, environmental, and economical effectiveness for these high-rise projects. This paper elaborates the above topics through case studies on the design and construction of four such developments in China. Some rethinking is conducted on evolution in modern seismic engineering and design through innovation to achieve an acceptable level of overall sustainability and building effectiveness.

초고층 대형복합 건축공사에 있어 BIM 활용에 관한 고찰 - 해운대 L-Project 적용 성과를 중심으로 - (The Application of using BIM(Building Information Modeling) for a Mega-Complex Building Construction - Focused on using for L-Project -)

  • 박희도
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.42-43
    • /
    • 2020
  • Recently as construction projects have been complicated, it has been wearing thin to draw on their personal experiences for management. Although the advance of IT, using the technology for construction is insufficient in contrast to other industries. BIM has been steadily used in construction projects, but it is not easy to find the case of successful use. This research considers ways in which BIM technology can be applied to useful management on a construction site and derives a method of application of using BIM for a Mega-complex Building Project especially.

  • PDF

메가프로젝트 기획/계획단계 VE적용을 위한 준비단계 수행방안 (Development of Pre-workshop Phase for the VE application at the Early Planning Stage of the Mega Project)

  • 하승룡;현창택;손명진;김윤식
    • 한국건설관리학회논문집
    • /
    • 제12권4호
    • /
    • pp.29-39
    • /
    • 2011
  • 최근 국내에서는 쇠퇴도시 재개발, 도시의 균형발전, 도시 이미지 창출을 목적으로 메가프로젝트 규모의 사업이 활발히 추진되고 있다. 메가프로젝트 사업은 다양한 주체들에 의해 장기간에 걸쳐 대규모로 추진되는 특성으로, 참여주체간의 복잡한 이해관계와 갈등, 부적절한 시설규모 계획을 통한 사업성 저하 등의 문제점이 야기되고 있다. 이러한 문제점을 해결하기 위해서는 사업초기단계에서 비용절감 및 성능향상 효과를 최대한 발휘할 수 있으며 다양한 시설의 규모적 특성을 기능중심적 사고를 통해 지원할 수 있는 VE 적용이 필수적으로 요구된다. 하지만, 사업초기단계에 대한 가용정보의 부족, 기존 방법론의 부재 등으로 인하여 사업초기단계에서의 VE적용은 미흡한 실정이다. 따라서 본 연구에서는 사업초기단계 메가프로젝트의 문제점과 VE적용의 한계를 해결하기 위한 방안으로, VE준비단계에서의 VE팀 구성, Quality Model, 성능지표, Space Model을 제안하였다. 본 연구의 결과는 메가프로젝트의 기획/계획단계에서 VE 수행을 위한 기초적인 자료로 활용될 수 있을 것으로 기대된다.

Preliminary Study on Market Risk Prediction Model for International Construction using Fractal Analysis

  • Moon, Seonghyeon;Kim, Du Yon;Chi, Seokho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.463-467
    • /
    • 2015
  • Mega-shock means a sporadic event such as the earning shock, which occurred by sudden market changes, and it can cause serious problems of profit loss of international construction projects. Therefore, the early response and prevention by analyzing and predicting the Mega-shock is critical for successful project delivery. This research is preliminary study to develop a prediction model that supports market condition analysis and Mega-shock forecasting. To avoid disadvantages of classic statistical approaches that assume the market factors are linear and independent and thus have limitations to explain complex interrelationship among a range of international market factors, the research team explored the Fractal Theory that can explain self-similarity and recursiveness of construction market changes. The research first found out correlation of the major market factors by statistically analyzing time-series data. The research then conducted a base of the Fractal analysis to distinguish features of fractal from data. The outcome will have potential to contribute to building up a foundation of the early shock warning system for the strategic international project management.

  • PDF

IMPLEMENTATION OF TRL TOOLS TO KOREAN NATIONAL CONSTRUCTION AND TRANSPORTATION R&D PROJECTS FOR IMPROVING PRACTICAL USE

  • Namgyun Kim;Byungho An;Jaehong Choi;Hyunseok Lee;Sanghyuk Park;Yeasang Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.608-615
    • /
    • 2013
  • The major countries including Korea extend the national investment on R&D and implement the business performance diffusion policy as the knowledge based competition age arrives recently. The necessity for risk management and systematic management system for R&D achievement have been appeared to prevent the failure as the R&D scale becomes larger as it was said. For this matter, the organization such as NASA and DoD in USA defines the Technology Readiness Level (TRL) as a quantitative accomplishment management index and utilize the Technology Readiness Assessment (TRA) system as a criterion. Such tool is evaluated as very effective in the R&D project purposed the practicalization. It is expected that the disadvantage of evaluation system which is oriented to the academic accomplishment in its contents of current research and to contribute greatly to the practicalization of outcomes when such technology readiness level concept is applied to Korean national construction and transportation R&D project. Accordingly, this study analyzed the concept of TRL·TRA, the characteristics and current evaluation management system of Korean national construction and transportation R&D project and suggested the construction and transportation R&D project TRL·TRA performance model to accomplish the practicalization purpose.

  • PDF

해외 대형건설공사 공기지연클레임의 공기연장기간 입증방법 (A Study on Substantiation Methodology for Extension of Time in International Mega-Project Claims)

  • 김영재;김태경;조덕상;이황구
    • 한국건설관리학회논문집
    • /
    • 제16권3호
    • /
    • pp.165-176
    • /
    • 2015
  • 국내 건설산업의 침체가 장기화됨에 따라 대형 건설업체를 중심으로 국내사업 비중이 줄고 상대적으로 해외사업의 비중이 증가되고 있으며, 중견 건설업체 및 특수기술을 가지고 있는 전문건설업체의 해외프로젝트 수행이 확대되고 있다. 이러한 해외건설공사 수행의 중요성이 부각되고 있는 최근 상황에서 해외 대형건설공사에서 일반적으로 발생되고 있는 공기지연에 대한 적극적 대응이 성공적 프로젝트관리의 중요한 이슈로 제기되고 있다. 본 연구에서는 해외 대형프로젝트의 공기지연 클레임의 공기연장기간을 입증하는데 활용되는 기존 공기연장기간 분석방법의 실무적 적용상의 문제점을 제기하였다. 제시된 문제점을 해결하기 위한 개선방법으로 1)클레임의 명확성을 확보하기 위해 지연영향력 분석이전에 주요지연(dominant delay)를 선정하는 절차를 갖는 개선개념과 2)Time Impact Analysis을 시행을 위한 분석구간의 설정방법에 대한 개선개념을 제시하였다. 본 연구에서 제시한 공기연장기간 분석방법을 실제 해외 대형건설공사의 공기지연 클레임 사례에 적용함으로써, 제안한 개선안의 실무적용에 대한 유효성을 입증하였다. 국내의 해외 대형공사 공기지연 클레임을 담당하고 있는 기술자들이 본 연구에서 제안한 방법들을 공기지연 클레임 추진 및 관련자 협상 등과 같은 실무 추진에 참고하고 활용함을 통해, 공기연장기간 입증관련 클레임의 협상실패로 인한 리스크와 후속적인 분쟁 및 회사의 경영손실 리스크를 최소화 하는데 도움이 될 것이라고 사료된다.

도시재생사업의 메가프로젝트 건설관리시스템 개발 (Development of the Program Management System for Mega Project in Urban Regeneration)

  • 현창택;김주형;박일수;유정호;손보식;홍태훈;서용칠;이상범;김형관;김창완
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.176-183
    • /
    • 2008
  • 최근 낙후된 도심 재개발을 목적으로 신도시 및 신시가지 위주의 도시재생을 위한 프로젝트가 진행되고 있다. 이러한 도시재생 프로젝트들은 매우 다양한 기능을 요구하므로, 현존하는 단일 프로젝트 단계의 프로젝트 관리 시스템을 적용하기에는 한계점을 갖는다. 특히, 도심이라는 한정된 공간에서 다양한 도시기반시설을 입체화하고 다양한 용도를 복합화하는 복잡한 배경과 함께, 참여 주체들 간의 복잡한 이해관계, 민간 및 공공 개발영역의 혼재, 운영유지 및 자산관리의 어려움 등의 문제점이 제기되고 있다. 그러므로, 본 연구에서는 다음의 두 가지 목적을 달성하고자 한다. 1) 수평, 수직적인 공간내 다양한 시설이 입체적으로 배치되는 메가프로젝트에 적합한 새로운 프로그램 관리 시스템 Prototype Ver 1.0의 개발, 2) 동시다발적으로 진행되는 다양한 프로젝트의 종합적인 관리가 가능한 프로그램 수준의 관리 체계 Prototype Ver 1.0의 수립. 효율적인 연구수행을 위해 지능형 종합 사업관리시스템 개발, 생애주기단계별 업무 프로세스 최적화 및 표준화 개발, 사업 전(全)단계를 고려한 종합사업비 및 공정관리 기술개발, 종합사업관리 효율화 및 최적화 기술개발 등의 세부 과제로 이루어져 있으며, 메가프로젝트 생애주기의 최적화, 다양한 위험요소에 대한 대응 및 예측방안, 비용/공정/프로세스의 관리 및 예측방안, 웹기반의 새로운 iPMIS를 제시하고자 한다.

  • PDF

초고층 건축물의 대형기초 설계 사례 (A Case Study of The Design of Mega Foundations for High-rise Buildings)

  • 김성호;홍승현;홍사면;최용규
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2007년 가을학술발표회
    • /
    • pp.55-77
    • /
    • 2007
  • Currently a large number of high rise building projects are under plan and a mega foundation system to support this high load with safety is requiring. The foundation of a highrise building is displaced by the building load, which influence the behavior of a super structure in reverse. In this aspect, the structural interaction analysis between a foundation and a super structure is necessary. In this study, the relationship of a superstructure of building and a foundation has been reviewed, considering the tendency of design from a capacity driven design to a performance design. Two different case studies have been introduced to help understand this relationship in more specific, the first case is the high rise building founded on a mat system on rock and the second is that on large diameter bored piles on soft ground condition.

  • PDF

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF